ARDOT contract 012542 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO LAY A HIGH FRICTION SURFACE TREATMENT ON APPROXIMATELY 3.348 MILES ON VARIOUS SECTIONS IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, RUMBLE STRIPES, PAVEMENT MARKING, HIGH FRICTION SURFACE TREATMENT, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Various. 3 bids received; low bid $1,139,139 by The Truesdell Corporation.

Owner
Arkansas DOT
Letting
21 JAN 2026
Pay items
15
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1The Truesdell Corporation$1,139,139Low
2Louis-Company, LLC$1,156,534+2.0%
3Ram Construction Services of Michigan, Inc.$1,254,000+10%
ARDOT contract 012542: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. The Truesdell Corporation2. Louis-Company, LLC3. Ram Construction Services of Michigan, Inc.
0001High friction surface treatment (402301)SY45,903$19.60$19.00$21.65
0002Maintenance of traffic (603009)LS1$64,210$90,883$101,000
0003Signs (604003)SF1,752$10.50$10.58$8.30
0004Traffic drums (604023)EACH318$26.50$26.45$25.00
0005Construction pavement markings (604041)LF55,918$0.28$0.02$0.24
0006Removal of permanent pavement markings (604061)LF55,918$0.65$0.58$0.50
0007Roadway construction control (635011)LS1$575.00$5,000.00$2,000.00
0008Reflectorized paint pavement marking white (6") (718002)LF10,027$0.50$1.01$0.41
0009Reflectorized paint pavement marking yellow (6") (718102)LF10,778$0.50$1.01$0.41
0010Thermoplastic pavement marking white (6") (719002)LF17,312$0.80$2.01$0.76
0011Thermoplastic pavement marking yellow (6") (719102)LF17,801$0.80$2.01$0.76
0012Thermoplastic pavement marking (words) (719201)EACH2$300.00$423.18$275.00
0013Thermoplastic pavement marking (arrows) (719202)EACH4$300.00$370.27$250.00
0014Raised pavement markers (type II) (721002)EACH192$8.00$10.58$6.50
0015Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$54,000$32,047$55,315
ARDOT contract 012542: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy