ARDOT contract A80041 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.290 MILES OF HIGHWAY 154 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Conway. 3 bids received; low bid $1,370,692 by Blackstone Construction, LLC.
- Owner
- Arkansas DOT
- Letting
- 21 JAN 2026
- Pay items
- 16
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blackstone Construction, LLC | $1,370,692 | Low |
| 2 | Rogers Group, Inc. | $1,454,747 | +6.0% |
| 3 | CK Asphalt, LLC | $1,672,869 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blackstone Construction, LLC | 2. Rogers Group, Inc. | 3. CK Asphalt, LLC |
|---|---|---|---|---|---|---|
| 0001 | Aggregate surface course (class D-8) (303308) | TON | 1,117 | $34.83 | $40.00 | $32.15 |
| 0002 | Tack coat (401011) | GAL | 18,805 | $0.01 | $1.00 | $2.80 |
| 0003 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 11,319 | $90.50 | $63.00 | $107.54 |
| 0004 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 9 | $120.00 | $500.00 | $120.00 |
| 0005 | Asphalt binder (PG 70-22) in achm surface course (3/8") (minimum bid $120.00) (407441) | TON | 765 | $120.00 | $600.00 | $220.00 |
| 0006 | Cold milling asphalt pavement (412002) | SY | 600 | $5.00 | $10.00 | $5.50 |
| 0007 | Achm patching of existing roadway (415011) | TON | 150 | $200.00 | $200.00 | $135.00 |
| 0008 | Maintenance of traffic (603009) | LS | 1 | $26,573 | $33,000 | $15,400 |
| 0009 | Signs (604003) | SF | 571 | $6.50 | $6.50 | $6.00 |
| 0010 | Construction pavement markings (604041) | LF | 98,379 | $0.16 | $0.16 | $0.15 |
| 0011 | Roadway construction control (635011) | LS | 1 | $2,500.00 | $5,000.00 | $8,500.00 |
| 0012 | Rumble stripes in asphalt shoulders (642011) | LF | 44,690 | $0.18 | $0.15 | $0.32 |
| 0013 | Thermoplastic pavement marking white (6") (719002) | LF | 54,869 | $0.58 | $0.58 | $0.62 |
| 0014 | Thermoplastic pavement marking yellow (6") (719102) | LF | 43,510 | $0.58 | $0.58 | $0.62 |
| 0015 | Raised pavement markers (type II) (721002) | EACH | 350 | $7.00 | $7.00 | $5.00 |
| 0016 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $65,271 | $55,000 | $55,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.