ARDOT contract 030656 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 1.94 MILES ON I-30 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING PAVEMENT, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Hempstead. 2 bids received; low bid $367,213 by Redstone Construction Group, Inc..

Owner
Arkansas DOT
Letting
21 JAN 2026
Pay items
16
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Redstone Construction Group, Inc.$367,213Low
2Rogers Group, Inc.$435,309+19%
ARDOT contract 030656: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Redstone Construction Group, Inc.2. Rogers Group, Inc.
0001Ultrathin bonded wearing course (3/4"-type C) (407904)TON1,349$190.00$215.00
0002Cold milling asphalt pavement (412002)SY667$20.00$20.00
0003Achm patching of existing roadway (415011)TON50$299.65$300.00
0004Maintenance of traffic (603010)LS1$22,796$31,000
0005Signs (604003)SF745$6.50$8.00
0006Traffic drums (604023)EACH230$28.00$34.00
0007Construction pavement markings (604041)LF23,047$0.15$0.25
0008Advance warning arrow panel (604071)DAY25$10.00$12.00
0009Portable changeable message sign (604078)WEEK5$125.00$150.00
0010Mobile speed notification system (special) (604160)EACH1$8,000.00$9,800.00
0011Roadway construction control (635011)LS1$2,510.28$15,000
0012Rumble strips in asphalt shoulders (642001)LF20,486$0.16$0.15
0013Enhanced thermoplastic pavement marking white (6") (719502)LF12,804$0.60$0.80
0014Enhanced thermoplastic pavement marking yellow (6") (719602)LF10,243$0.60$0.80
0015Raised pavement markers (type II) (721002)EACH129$4.29$8.00
0016Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$16,000$18,000
ARDOT contract 030656: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy