ARDOT contract 100881 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 1B TO FIVE LANES IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, PORTLAND CEMENT CONCRETE BASE, ACHM BASE, BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, PORTLAND CEMENT CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, GUARDRAIL, EROSION CONTROL, CONCRETE ISLAND, WALKS, CONCRETE CURB AND GUTTER, WHEELCHAIR RAMPS, TRAFFIC SIGNAL ITEMS, PAVEMENT MARKERS AND MISC ITEMS. Let by Arkansas DOT on January 21, 2026, Craighead. 3 bids received; low bid $5,870,408 by Rogers Group, Inc..
- Owner
- Arkansas DOT
- Letting
- 21 JAN 2026
- Pay items
- 170
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $5,870,408 | Low |
| 2 | White River Materials, Inc. | $6,095,468 | +4.0% |
| 3 | Delta Asphalt of Arkansas, Inc. | $6,499,045 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. White River Materials, Inc. | 3. Delta Asphalt of Arkansas, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Clearing (201011) | STA | 11 | $2,500.00 | $4,192.93 | $995.33 |
| 0002 | Grubbing (201111) | STA | 11 | $2,500.00 | $2,790.45 | $1,220.41 |
| 0003 | Removal and disposal of curb (202001) | LF | 937 | $19.00 | $13.68 | $4.65 |
| 0004 | Removal and disposal of curb and gutter (202003) | LF | 503 | $19.00 | $12.81 | $8.67 |
| 0005 | Removal and disposal of fence (202011) | LF | 417 | $6.25 | $15.17 | $10.46 |
| 0006 | Removal and disposal of gates (202017) | EACH | 2 | $320.00 | $300.53 | $780.89 |
| 0007 | Removal and disposal of concrete slabs (202030) | SY | 6 | $525.00 | $83.34 | $623.75 |
| 0008 | Removal and disposal of concrete pavement (202042) | SY | 242 | $49.00 | $44.69 | $18.02 |
| 0009 | Removal and disposal of concrete islands (202047) | SY | 29 | $47.00 | $37.32 | $129.05 |
| 0010 | Removal and disposal of concrete driveways (202062) | SY | 579 | $26.00 | $35.70 | $18.83 |
| 0011 | Removal and disposal of concrete headwalls and wingwalls (202078) | EACH | 8 | $1,300.00 | $1,986.77 | $1,362.95 |
| 0012 | Removal and disposal of sign foundations (202084) | EACH | 8 | $1,000.00 | $636.20 | $1,362.95 |
| 0013 | Removal and disposal of drop inlets (202093) | EACH | 6 | $2,000.00 | $2,383.92 | $1,974.40 |
| 0014 | Removal and disposal of pipe culverts (202096) | EACH | 18 | $2,000.00 | $2,763.21 | $1,871.24 |
| 0015 | Removal and disposal of headwalls (202099) | EACH | 2 | $1,200.00 | $861.31 | $2,180.72 |
| 0016 | Removal and disposal of luminaire poles (202151) | EACH | 1 | $1,600.00 | $636.22 | $1,411.88 |
| 0017 | Removal and disposal of swimming pool (202169) | EACH | 1 | $5,300.00 | $2,004.03 | $4,361.44 |
| 0018 | Removal and disposal of signs (202191) | EACH | 36 | $525.00 | $719.11 | $225.11 |
| 0019 | Removal and disposal of mailboxes (202200) | EACH | 6 | $180.00 | $209.10 | $229.93 |
| 0020 | Unclassified excavation (210213) | CY | 3,471 | $45.00 | $55.70 | $44.85 |
| 0021 | Compacted embankment (210611) | CY | 6,351 | $47.00 | $62.89 | $41.60 |
| 0022 | Soil stabilization (210702) | TON | 100 | $570.00 | $655.79 | $436.02 |
| 0023 | Aggregate base course (class 7) (303117) | TON | 1,845 | $52.00 | $98.85 | $41.58 |
| 0024 | Portland cement concrete base (5" uniform thickness) (309505) | SY | 616 | $100.00 | $110.00 | $175.00 |
| 0025 | Tack coat (401011) | GAL | 3,023 | $1.00 | $0.01 | $4.39 |
| 0026 | Mineral aggregate in achm base course (1 1/2") (405161) | TON | 1,997 | $78.00 | $101.27 | $106.75 |
| 0027 | Asphalt binder (PG 64-22) in achm base course (1 1/2") (minimum bid $120.00) (405402) | TON | 81 | $550.00 | $120.00 | $120.00 |
| 0028 | Mineral aggregate in achm binder course (1") (406161) | TON | 1,009 | $80.00 | $103.12 | $118.00 |
| 0029 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 43 | $550.00 | $120.00 | $550.00 |
| 0030 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 195 | $75.00 | $115.06 | $138.22 |
| 0031 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 3,398 | $65.00 | $112.16 | $120.85 |
| 0032 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 11 | $550.00 | $120.00 | $800.00 |
| 0033 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 3 | $600.00 | $120.00 | $800.00 |
| 0034 | Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442) | TON | 184 | $750.00 | $120.00 | $800.00 |
| 0035 | Cold milling asphalt pavement (412002) | SY | 2,011 | $6.00 | $3.93 | $9.50 |
| 0036 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 10 | $225.00 | $250.00 | $423.33 |
| 0037 | Achm patching of existing roadway (415011) | TON | 10 | $185.00 | $250.00 | $405.01 |
| 0038 | Portland cement concrete driveway (505011) | SY | 958.49 | $145.00 | $104.95 | $150.00 |
| 0039 | Furnishing field office (602011) | EACH | 1 | $75,000 | $126,272 | $33,114 |
| 0040 | Maintenance of traffic (603010) | LS | 1 | $150,000 | $163,664 | $450,000 |
| 0041 | Signs (604003) | SF | 412 | $6.25 | $8.00 | $6.00 |
| 0042 | Traffic drums (604023) | EACH | 92 | $26.00 | $25.00 | $25.00 |
| 0043 | Furnishing and installing precast concrete barrier (604031) | LF | 186 | $75.00 | $78.81 | $72.00 |
| 0044 | Relocating precast concrete barrier (max. bid 25% of item number ) (604036) | LF | 266 | $18.75 | $19.00 | $18.00 |
| 0045 | Construction pavement markings (604041) | LF | 16,724 | $0.40 | $0.36 | $0.35 |
| 0046 | Construction pavement markings (words) (604045) | EACH | 2 | $135.00 | $125.00 | $125.00 |
| 0047 | Construction pavement markings (arrows) (604046) | EACH | 6 | $110.00 | $100.00 | $100.00 |
| 0048 | Removal of construction pavement markings (604055) | LF | 8,144 | $0.33 | $0.30 | $1.20 |
| 0049 | Removal of permanent pavement markings (604061) | LF | 8,144 | $0.33 | $0.30 | $1.20 |
| 0050 | Vertical panels (604083) | EACH | 31 | $33.00 | $30.00 | $32.00 |
| 0051 | Concrete ditch paving (type B) (605012) | SY | 93 | $165.00 | $95.15 | $250.00 |
| 0052 | 12" side drain (606701) | LF | 40 | $150.00 | $68.94 | $117.84 |
| 0053 | 18" side drain (606703) | LF | 40 | $160.00 | $83.86 | $125.99 |
| 0054 | Selected pipe bedding (606994) | CY | 200 | $27.00 | $26.26 | $49.98 |
| 0055 | Drop inlets (type C) (609013) | EACH | 3 | $6,200.00 | $11,639 | $7,582.29 |
| 0056 | Drop inlets (type E) (609015) | EACH | 3 | $6,200.00 | $8,332.18 | $6,893.19 |
| 0057 | Drop inlets (type MO) (609134) | EACH | 20 | $6,200.00 | $8,404.08 | $5,985.39 |
| 0058 | Drop inlets (type ST) (609138) | EACH | 3 | $6,200.00 | $8,280.83 | $8,164.10 |
| 0059 | Drop inlets (type special) (609144) | EACH | 4 | $11,000 | $4,588.74 | $11,222 |
| 0060 | Junction boxes (type E) (609215) | EACH | 6 | $6,200.00 | $11,962 | $7,130.45 |
| 0061 | Drop inlet extensions (4') (609311) | EACH | 10 | $4,200.00 | $1,713.37 | $3,457.48 |
| 0062 | Drop inlet extensions (8') (609312) | EACH | 1 | $7,500.00 | $2,012.63 | $5,411.12 |
| 0063 | Yard drains (609511) | EACH | 3 | $3,700.00 | $3,513.10 | $3,829.97 |
| 0064 | 4" pipe underdrains (611008) | LF | 4,741 | $26.00 | $19.24 | $18.49 |
| 0065 | Underdrain outlet protectors (611013) | EACH | 27 | $525.00 | $1,284.00 | $1,202.00 |
| 0066 | Guardrail (type A) (617005) | LF | 175 | $34.00 | $32.00 | $32.00 |
| 0067 | Terminal anchor posts (type 1) (617105) | EACH | 1 | $1,875.00 | $3,100.00 | $1,750.00 |
| 0068 | Guardrail terminal (type 2) (617312) | EACH | 1 | $3,200.00 | $1,750.00 | $3,100.00 |
| 0069 | Lime (620001) | TON | 3 | $105.00 | $100.00 | $100.00 |
| 0070 | Seeding (620011) | ACRE | 1.60 | $1,600.00 | $1,500.00 | $1,500.00 |
| 0071 | Mulch cover (620022) | ACRE | 3.20 | $1,300.00 | $1,250.00 | $1,250.00 |
| 0072 | Water (620030) | MGAL | 295.20 | $10.75 | $10.00 | $10.00 |
| 0073 | Temporary seeding (621001) | ACRE | 1.60 | $1,050.00 | $1,000.00 | $1,000.00 |
| 0074 | Silt fence (621021) | LF | 3,875 | $3.75 | $3.50 | $3.50 |
| 0075 | Sand bag ditch checks (621031) | BAG | 468 | $10.75 | $10.00 | $10.00 |
| 0076 | Drop inlet silt fence (621051) | LF | 300 | $13.50 | $12.50 | $12.50 |
| 0077 | Sediment basin (621071) | CY | 600 | $27.00 | $0.50 | $19.12 |
| 0078 | Obliteration of sediment basin (621101) | CY | 600 | $13.50 | $0.50 | $12.45 |
| 0079 | Sediment removal and disposal (621111) | CY | 819 | $0.27 | $4.78 | $9.58 |
| 0080 | Rock ditch checks (621151) | CY | 41 | $185.00 | $110.74 | $98.06 |
| 0081 | Filter sock (12") (621168) | LF | 519 | $9.00 | $8.50 | $8.50 |
| 0082 | Filter sock (18") (621169) | LF | 3,578 | $12.00 | $8.52 | $11.20 |
| 0083 | Wattle (20") (621173) | LF | 90 | $10.50 | $10.00 | $10.00 |
| 0084 | Second seeding application (623001) | ACRE | 1.60 | $375.00 | $350.00 | $350.00 |
| 0085 | Solid sodding (624001) | SY | 7,883 | $5.00 | $6.46 | $4.90 |
| 0086 | Gabions (629001) | CY | 13 | $830.00 | $697.47 | $928.21 |
| 0087 | Concrete island (632011) | SY | 69 | $160.00 | $120.88 | $100.00 |
| 0088 | Concrete walks (633011) | SY | 731 | $103.00 | $67.93 | $90.00 |
| 0089 | Concrete walks (type special) (633017) | SY | 217 | $1,000.00 | $783.26 | $150.00 |
| 0090 | Hand railing (633201) | LF | 391 | $120.00 | $102.58 | $110.00 |
| 0091 | Concrete combination curb and gutter (type A) (1' 6") (634201) | LF | 4,226 | $34.00 | $28.86 | $30.00 |
| 0092 | Roadway construction control (635001) | LS | 1 | $75,000 | $250,422 | $172,000 |
| 0093 | Mailboxes (637001) | EACH | 7 | $53.00 | $50.00 | $50.00 |
| 0094 | Mailbox supports (single) (637017) | EACH | 5 | $150.00 | $150.00 | $150.00 |
| 0095 | Mailbox supports (double) (637018) | EACH | 1 | $175.00 | $200.00 | $175.00 |
| 0096 | Wheelchair ramps (type 1) (641018) | SY | 63 | $375.00 | $110.47 | $150.00 |
| 0097 | Wheelchair ramps (type 2) (641019) | SY | 12 | $500.00 | $446.97 | $200.00 |
| 0098 | Wheelchair ramps (type 3) (641020) | SY | 122 | $375.00 | $637.68 | $170.00 |
| 0099 | System local controller TS2-type 2, E-net (8 phases) (701227) | EACH | 3 | $44,000 | $39,425 | $39,425 |
| 0100 | Ethernet switch, T100 hardened (8-port) (701722) | EACH | 3 | $4,500.00 | $5,956.50 | $5,956.50 |
| 0101 | E-net cable (exterior cat 5E) (701751) | LF | 294 | $4.25 | $3.90 | $3.90 |
| 0102 | Cellular modem (702094) | EACH | 2 | $4,800.00 | $3,879.00 | $3,879.00 |
| 0103 | Local radio (E-net 5.8) with antenna (702304) | EACH | 2 | $4,800.00 | $6,336.25 | $6,336.25 |
| 0104 | Local radio with antenna relocation (702309) | EACH | 1 | $530.00 | $2,400.00 | $2,400.00 |
| 0105 | Battery backup system (702335) | EACH | 1 | $13,000 | $12,131 | $12,131 |
| 0106 | Traffic signal head, LED, (3 section, 1 way) (706039) | EACH | 36 | $1,700.00 | $1,613.25 | $1,613.25 |
| 0107 | Traffic signal head, LED, (4 section, 1 way) (706043) | EACH | 4 | $1,900.00 | $1,977.75 | $1,977.75 |
| 0108 | Relocation of traffic signal head (706103) | EACH | 6 | $475.00 | $875.00 | $875.00 |
| 0109 | Central control unit (707006) | EACH | 2 | $4,800.00 | $5,433.75 | $5,433.75 |
| 0110 | Pole mounted assembly (707007) | EACH | 6 | $1,300.00 | $1,648.00 | $1,648.00 |
| 0111 | Countdown pedestrian signal head, LED (707015) | EACH | 6 | $1,300.00 | $1,741.25 | $1,741.25 |
| 0112 | Traffic signal cable (5C/12 A.W.G.) (708007) | LF | 487 | $4.25 | $5.05 | $5.05 |
| 0113 | Traffic signal cable (5C/14 A.W.G.) (708008) | LF | 2,831 | $4.00 | $3.50 | $3.50 |
| 0114 | Traffic signal cable (7C/14 A.W.G.) (708012) | LF | 2,443 | $4.75 | $4.40 | $4.40 |
| 0115 | Traffic signal cable (20C/14 A.W.G.) (708038) | LF | 898 | $7.50 | $9.50 | $9.50 |
| 0116 | Electrical conductors-in-conduit (1C/8 A.W.G., E.G.C.) (708207) | LF | 1,194 | $2.10 | $4.50 | $4.50 |
| 0117 | Electrical conductors-in-conduit (1C/12 A.W.G., E.G.C.) (708211) | LF | 617 | $2.10 | $2.90 | $2.90 |
| 0118 | Electrical conductors-in-conduit (2C/6 A.W.G.) (708217) | LF | 164 | $4.80 | $6.30 | $6.30 |
| 0119 | Electrical conductors for luminaires (708451) | LF | 1,508 | $1.70 | $3.25 | $3.25 |
| 0120 | Galvanized steel conduit (2") (709004) | LF | 75 | $32.00 | $55.05 | $55.05 |
| 0121 | Galvanized steel conduit (3") (709005) | LF | 60 | $54.00 | $73.10 | $73.10 |
| 0122 | Non-metallic conduit (2") (710004) | LF | 126 | $21.00 | $28.75 | $28.75 |
| 0123 | Non-metallic conduit (3") (710005) | LF | 891 | $54.00 | $32.85 | $32.85 |
| 0124 | Concrete pull box (type 1 HD) (711104) | EACH | 3 | $1,900.00 | $1,620.00 | $1,620.00 |
| 0125 | Concrete pull box (type 2 HD) (711105) | EACH | 13 | $2,700.00 | $1,869.00 | $1,869.00 |
| 0126 | Span wire assembly (713011) | EACH | 1 | $10,500 | $15,960 | $15,960 |
| 0127 | Traffic signal mast arm and pole with foundation (0') (714003) | EACH | 1 | $23,500 | $16,400 | $16,400 |
| 0128 | Traffic signal mast arm and pole with foundation (30') (714030) | EACH | 1 | $42,000 | $24,640 | $24,640 |
| 0129 | Traffic signal mast arm and pole with foundation (56') (714056) | EACH | 1 | $49,000 | $40,460 | $40,460 |
| 0130 | Traffic signal mast arm and pole with foundation (60') (714060) | EACH | 1 | $51,000 | $46,340 | $46,340 |
| 0131 | Traffic signal mast arm and pole with foundation (62') (714062) | EACH | 1 | $53,000 | $48,503 | $48,503 |
| 0132 | Traffic signal mast arm and pole with foundation (68') (714068) | EACH | 1 | $59,000 | $53,070 | $53,070 |
| 0133 | Traffic signal mast arm and pole with foundation (34'-42') (714615) | EACH | 1 | $55,000 | $51,280 | $51,280 |
| 0134 | LED luminaire assembly (714724) | EACH | 7 | $1,300.00 | $1,064.00 | $1,064.00 |
| 0135 | Traffic signal pedestal pole with foundation (715011) | EACH | 4 | $6,300.00 | $5,206.00 | $5,206.00 |
| 0136 | Service point assembly (2 circuits) (715102) | EACH | 3 | $6,300.00 | $6,497.00 | $6,497.00 |
| 0137 | Removal of traffic signal equipment (715704) | LS | 1 | $21,000 | $17,195 | $17,195 |
| 0138 | Treated wood pole (class 2, 45') (716245) | EACH | 5 | $9,500.00 | $7,750.00 | $7,750.00 |
| 0139 | Thermoplastic pavement marking white (6") (719002) | LF | 6,438 | $1.20 | $1.12 | $0.90 |
| 0140 | Thermoplastic pavement marking white (12") (719005) | LF | 1,814 | $6.00 | $5.50 | $10.00 |
| 0141 | Thermoplastic pavement marking yellow (6") (719102) | LF | 6,097 | $1.20 | $1.12 | $0.90 |
| 0142 | Thermoplastic pavement marking yellow (12") (719105) | LF | 157 | $5.50 | $5.15 | $10.00 |
| 0143 | Thermoplastic pavement marking (words) (719201) | EACH | 11 | $300.00 | $275.00 | $250.00 |
| 0144 | Thermoplastic pavement marking (arrows) (719202) | EACH | 22 | $275.00 | $250.00 | $220.00 |
| 0145 | Raised pavement markers (type II) (721002) | EACH | 126 | $7.30 | $6.75 | $10.00 |
| 0146 | 18" street name sign (726012) | EACH | 7 | $1,050.00 | $1,189.50 | $1,189.50 |
| 0147 | Temporary impact attenuation barrier (731071) | EACH | 3 | $23,000 | $6,356.98 | $9,500.97 |
| 0148 | Temporary impact attenuation barrier (repair) (731072) | EACH | 3 | $1,000.00 | $1,500.00 | $1,000.00 |
| 0149 | Video detector rotation (733005) | EACH | 2 | $475.00 | $565.50 | $565.50 |
| 0150 | Video detector (IP) (733008) | EACH | 7 | $6,300.00 | $5,264.00 | $5,264.00 |
| 0151 | Hybrid video/radar detector (733009) | EACH | 4 | $13,200 | $12,165 | $12,165 |
| 0152 | Video cable (exterior cat 5E) (733035) | LF | 2,676 | $4.75 | $2.50 | $2.50 |
| 0153 | Video monitor (CLR) (733042) | EACH | 3 | $1,050.00 | $1,869.00 | $1,869.00 |
| 0154 | Central control unit (8 channel) (733105) | EACH | 3 | $48,000 | $44,282 | $44,282 |
| 0155 | Unclassified excavation for structures-roadway (801101) | CY | 996 | $52.00 | $21.26 | $30.00 |
| 0156 | Class S concrete-roadway (802012) | CY | 360.95 | $1,800.00 | $1,219.26 | $2,885.00 |
| 0157 | Architectural finish (802229) | SF | 778 | $25.00 | $18.72 | $21.00 |
| 0158 | Textured coating finish (802951) | SY | 58 | $160.00 | $203.55 | $337.18 |
| 0159 | Reinforcing steel-roadway (grade 60) (804003) | LB | 48,027 | $2.60 | $2.58 | $3.50 |
| 0160 | Filter blanket (816003) | SY | 110 | $16.00 | $6.85 | $59.98 |
| 0161 | Dumped riprap (816111) | CY | 50 | $280.00 | $92.86 | $225.39 |
| 0162 | 18" reinforced concrete pipe culverts (class III) (605601) | LF | 1,992 | $70.00 | $66.96 | |
| 0163 | 18" smooth lined polymer precoated metallic coated corrugated steel pipe (605723) | LF | 1,992 | $126.41 | ||
| 0165 | 24" reinforced concrete pipe culverts (class III) (605606) | LF | 572 | $85.00 | $76.98 | |
| 0166 | 24" smooth lined polymer precoated metallic coated corrugated steel pipe (605726) | LF | 572 | $169.58 | ||
| 0168 | 18" flared end sections for reinforced concrete pipe culverts (605856) | EACH | 1 | $2,600.00 | $3,808.00 | |
| 0169 | 18" flared end sections for corrugated steel pipe culverts (605857) | EACH | 1 | $1,459.31 | ||
| 0170 | 24" flared end sections for reinforced concrete pipe culverts (605858) | EACH | 1 | $2,800.00 | $4,942.75 | |
| 0171 | 24" flared end sections for corrugated steel pipe culverts (605859) | EACH | 1 | $1,659.31 | ||
| 0172 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $250,000 | $287,627 | $300,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.