ARDOT contract A20038 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.277 MILES OF HIGHWAY 167 IN GRANT COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Grant. 2 bids received; low bid $5,267,592 by Cranford Construction Co..

Owner
Arkansas DOT
Letting
21 JAN 2026
Pay items
24
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cranford Construction Co.$5,267,592Low
2Redstone Construction Group, Inc.$6,456,216+23%
ARDOT contract A20038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cranford Construction Co.2. Redstone Construction Group, Inc.
0001Aggregate base course (class 7) (303117)TON2,338$43.53$42.29
0002Tack coat (401011)GAL63,730$0.01$0.01
0003Mineral aggregate in achm surface course (1/2") (407162)TON38,467$92.01$112.25
0004Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON2,499$120.00$120.00
0005Cold milling asphalt pavement (412002)SY372,413$1.72$2.62
0006Asphalt concrete patching for maintenance of traffic (414011)TON210$188.83$251.92
0007Achm patching of existing roadway (415011)TON750$148.10$200.00
0008Maintenance of traffic (603010)LS1$175,003$83,152
0009Signs (604003)SF1,316$4.50$4.50
0010Construction project information sign update (604010)EACH2$50.00$50.00
0011Construction pavement markings (604041)LF436,426$0.14$0.14
0012Roadway construction control (635011)LS1$3,285.29$10,550
0013Rumble strips in asphalt shoulders (642001)LF138,430$0.14$0.18
0014Loop wiring class III (1C/16 A.W.G.) (704036)LF10,058$10.00$12.15
0015Reflectorized paint pavement marking white (10") (718004)LF500$1.80$1.80
0016Reflectorized paint pavement marking yellow (10") (718104)LF2,000$1.80$1.80
0017Thermoplastic pavement marking white (6") (719002)LF126,695$0.59$0.59
0018Thermoplastic pavement marking white (8") (719003)LF1,581$2.00$2.00
0019Thermoplastic pavement marking white (12") (719005)LF300$8.00$8.00
0020Thermoplastic pavement marking yellow (6") (719102)LF91,518$0.58$0.58
0021Thermoplastic pavement marking (words) (719201)EACH27$275.00$275.00
0022Thermoplastic pavement marking (arrows) (719202)EACH27$250.00$250.00
0023Raised pavement markers (type II) (721002)EACH1,182$4.15$4.15
0024Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$12,331$95,360
ARDOT contract A20038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy