ARDOT contract A80046 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.513 MILES OF HIGHWAY 225 IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF GUARDRAIL, EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE AND SURFACE COURSES, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT AND CONCRETE PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, EXTENDING A REINFORCED CONCRETE PIPE CULVERT, GUARDRAIL, EROSION CONTROL ITEMS, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Faulkner. 2 bids received; low bid $4,070,029 by Rogers Group, Inc..
- Owner
- Arkansas DOT
- Letting
- 21 JAN 2026
- Pay items
- 64
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $4,070,029 | Low |
| 2 | CK Asphalt, LLC | $4,758,439 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. CK Asphalt, LLC |
|---|---|---|---|---|---|
| 0001 | Clearing (201012) | STA | 3 | $1,200.00 | $1,200.00 |
| 0002 | Grubbing (201112) | STA | 3 | $1,000.00 | $1,200.00 |
| 0003 | Removal and disposal of guardrail (202132) | LF | 436 | $7.00 | $6.00 |
| 0004 | Stone backfill (207011) | TON | 87 | $64.00 | $55.00 |
| 0005 | Unclassified excavation (210213) | CY | 697 | $40.00 | $14.25 |
| 0006 | Shaping ditch (210323) | LF | 1,340 | $25.00 | $6.50 |
| 0007 | Compacted embankment (210611) | CY | 1,040 | $30.00 | $36.74 |
| 0008 | Trenching and shoulder preparation (215011) | STA | 657 | $65.00 | $120.00 |
| 0009 | Aggregate base course (class 7) (303117) | TON | 977 | $45.00 | $29.75 |
| 0010 | Aggregate surface course (class D-8) (303308) | TON | 3,943 | $35.00 | $29.75 |
| 0011 | Tack coat (401011) | GAL | 41,120 | $1.00 | $2.80 |
| 0012 | Mineral aggregate in achm binder course (1") (406161) | TON | 6,137 | $40.00 | $37.51 |
| 0013 | Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412) | TON | 289 | $550.00 | $1,000.00 |
| 0014 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 24,228 | $44.00 | $93.12 |
| 0015 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 18 | $450.00 | $120.00 |
| 0016 | Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442) | TON | 1,639 | $525.00 | $120.00 |
| 0017 | Cold milling asphalt pavement (412002) | SY | 2,772 | $6.00 | $5.00 |
| 0018 | Cold milling concrete pavement (412101) | SY | 124 | $30.00 | $9.00 |
| 0019 | Achm patching of existing roadway (415011) | TON | 225 | $180.00 | $125.00 |
| 0020 | Approach gutters (504264) | CY | 40.88 | $1,700.00 | $1,550.00 |
| 0021 | Maintenance of traffic (603009) | LS | 1 | $107,000 | $42,000 |
| 0022 | 24" temporary culvert (603024) | LF | 350 | $120.00 | $88.00 |
| 0023 | Signs (604003) | SF | 1,841 | $5.00 | $5.00 |
| 0024 | Traffic drums (604023) | EACH | 106 | $28.00 | $22.00 |
| 0025 | Construction pavement markings (604041) | LF | 275,698 | $0.15 | $0.15 |
| 0026 | Removal of construction pavement markings (604055) | LF | 17,648 | $0.17 | $0.17 |
| 0027 | Removal of permanent pavement markings (604061) | LF | 17,600 | $0.17 | $0.17 |
| 0028 | Vertical panels (604083) | EACH | 50 | $34.00 | $25.00 |
| 0029 | Concrete ditch paving (type B) (605012) | SY | 584 | $120.00 | $140.00 |
| 0030 | 24" reinforced concrete pipe culverts (class III) (605606) | LF | 96 | $200.00 | $188.00 |
| 0031 | 24" flared end sections for reinforced concrete pipe culverts (605858) | EACH | 4 | $1,500.00 | $1,600.00 |
| 0032 | Culvert clean out (606002) | EACH | 11 | $800.00 | $1,200.00 |
| 0033 | Guardrail (type A) (617005) | LF | 1,020 | $30.00 | $30.00 |
| 0034 | Guardrail terminal (type 2) (617312) | EACH | 8 | $3,100.00 | $3,100.00 |
| 0035 | Thrie beam guardrail terminal (617332) | EACH | 4 | $2,100.00 | $2,100.00 |
| 0036 | Lime (620001) | TON | 5 | $100.00 | $100.00 |
| 0037 | Seeding (620011) | ACRE | 2.25 | $1,375.00 | $1,375.00 |
| 0038 | Mulch cover (620022) | ACRE | 2.75 | $925.00 | $925.00 |
| 0039 | Water (620030) | MGAL | 245.90 | $10.00 | $10.00 |
| 0040 | Temporary seeding (621001) | ACRE | 0.50 | $1,200.00 | $1,200.00 |
| 0041 | Silt fence (621021) | LF | 3,600 | $3.50 | $3.50 |
| 0042 | Sand bag ditch checks (621031) | BAG | 660 | $10.00 | $10.00 |
| 0043 | Sediment removal and disposal (621111) | CY | 80 | $20.00 | $3.00 |
| 0044 | Rock ditch checks (621151) | CY | 120 | $128.00 | $55.00 |
| 0045 | Filter sock (18") (621169) | LF | 440 | $12.50 | $12.50 |
| 0046 | Second seeding application (623001) | ACRE | 2.25 | $300.00 | $300.00 |
| 0047 | Solid sodding (624001) | SY | 487 | $5.50 | $5.50 |
| 0048 | Roadway construction control (635011) | LS | 1 | $25,000 | $17,500 |
| 0049 | Mailboxes (637001) | EACH | 184 | $50.00 | $65.00 |
| 0050 | Mailbox supports (single) (637017) | EACH | 176 | $150.00 | $200.00 |
| 0051 | Mailbox supports (double) (637018) | EACH | 4 | $175.00 | $250.00 |
| 0052 | Rumble stripes in asphalt shoulders (642011) | LF | 96,062 | $0.15 | $0.23 |
| 0053 | Portable traffic signal system - actuated (701603) | WEEK | 4 | $900.00 | $1,500.00 |
| 0054 | Thermoplastic pavement marking white (6") (719002) | LF | 130,662 | $0.59 | $0.62 |
| 0055 | Thermoplastic pavement marking yellow (6") (719102) | LF | 127,388 | $0.59 | $0.61 |
| 0056 | Raised pavement markers (type II) (721002) | EACH | 829 | $4.00 | $4.00 |
| 0057 | Standard sign (726002) | SF | 132 | $20.00 | $20.00 |
| 0058 | Channel post sign support (type U-1) (729005) | EACH | 22 | $85.00 | $95.00 |
| 0059 | Unclassified excavation for structures-roadway (801101) | CY | 160 | $150.00 | $125.00 |
| 0060 | Class S concrete-roadway (802012) | CY | 206.72 | $1,500.00 | $1,885.00 |
| 0061 | Reinforcing steel-roadway (grade 60) (804003) | LB | 24,608 | $1.75 | $2.05 |
| 0062 | Filter blanket (816003) | SY | 325 | $10.00 | $7.50 |
| 0063 | Dumped riprap (816111) | CY | 195 | $128.00 | $55.00 |
| 0064 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $150,000 | $172,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.