ARDOT contract A10045 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 14.379 MILES OF HIGHWAY 50 IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF ITEM, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, St. Francis. 2 bids received; low bid $4,800,417 by Apac-Tennessee, Inc..

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
26
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Apac-Tennessee, Inc.$4,800,417Low
2Atlas Asphalt, Inc.$5,051,887+5.0%
ARDOT contract A10045: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Apac-Tennessee, Inc.2. Atlas Asphalt, Inc.
0001Removal and disposal of guardrail (202132)LF600$10.30$15.00
0002Trenching and shoulder preparation (215011)STA743$85.85$52.34
0003Aggregate base course (class 7) (303117)TON1,873$59.95$100.36
0004Tack coat (401011)GAL62,044$0.01$0.01
0005Mineral aggregate in achm binder course (1") (406161)TON6,949$106.40$100.98
0006Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON312$120.00$120.00
0007Mineral aggregate in achm surface course (1/2") (407162)TON29,447$98.90$104.94
0008Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON1,747$120.00$120.00
0009Cold milling asphalt pavement (412002)SY6,751$4.64$5.65
0010Achm patching of existing roadway (415011)TON100$277.22$150.00
0011Approach gutters (504264)CY31.80$1,461.60$2,961.77
0012Maintenance of traffic (603009)LS1$96,000$170,518
0013Signs (604003)SF734$5.15$5.00
0014Construction pavement markings (604041)LF298,484$0.17$0.16
0015Guardrail (type A) (617005)LF951$31.93$33.00
0016Guardrail terminal (type 2) (617312)EACH11$2,987.00$3,300.00
0017Thrie beam guardrail terminal (617332)EACH11$2,060.00$2,300.00
0018Silt fence (621021)LF15,000$0.25$0.05
0019Sediment removal and disposal (621111)CY556$0.10$0.37
0020Rumble stripes in asphalt shoulders (642011)LF148,522$0.14$0.06
0021Thermoplastic pavement marking white (6") (719002)LF149,242$0.77$0.76
0022Thermoplastic pavement marking yellow (6") (719102)LF149,242$0.54$0.53
0023Raised pavement markers (type II) (721002)EACH928$4.04$4.00
0024Bridge end terminal (734011)EACH1$31,544$32,000
0025Reinforcing steel-roadway (grade 60) (804003)LB2,381$3.76$3.00
0026Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$112,500$68,945
ARDOT contract A10045: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy