ARDOT contract SA1843 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.12 MILES OF COUNTY ROADS 305 AND 12 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, AGGREGATE BASE COURSE, BASE REPLACEMENT, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on April 9, 2025, Crittenden. 2 bids received; low bid $784,105 by Apac-Tennessee, Inc..

Owner
Arkansas DOT
Letting
09 APR 2025
Pay items
13
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Apac-Tennessee, Inc.$784,105Low
2SN Contractors LLC$844,092+8.0%
ARDOT contract SA1843: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Apac-Tennessee, Inc.2. SN Contractors LLC
0001Stone backfill (207011)TON132$175.00$136.00
0002Aggregate base course (class 7) (303117)TON494$101.00$62.00
0003Prime coat (401002)GAL58$5.05$5.00
0004Tack coat (401011)GAL3,915$3.75$5.00
0005Mineral aggregate in achm surface course (1/2") (407162)TON4,510$131.75$145.00
0006Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON268$120.00$175.00
0007Maintenance of traffic (603009)LS1$24,000$27,000
0008Signs (604003)SF316$10.15$11.00
0009Geotextile fabric (type 10) (625020)SY274$10.10$10.00
0010Reflectorized paint pavement marking yellow (4") (718101)LF7,710$0.40$0.33
0011Standard sign (726002)SF72$25.38$27.50
0012Channel post sign support (type C) (729003)EACH22$86.28$93.50
0013Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$33,000$35,000
ARDOT contract SA1843: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy