ARDOT letting results, April 10, 2024
27 contracts let by Arkansas DOT on April 10, 2024, $59,185,429 in low bids, a median of 2 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 27
- Low bids, total
- $59,185,429
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| AX0005 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 17.444 MILES OF HIGHWAY 35 IN CLEVELAND AND DREW COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL | Cleveland, Drew | 1 | Pine Bluff Sand & Gravel Co. | $11,605,437 | ARDOT | ||
| 061614 | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 86 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL I | Prairie | 4 | Capital Paving & Construction, LLC | $9,394,382 | $9,959,749 | +6.0% | ARDOT |
| 070537 | THE PURPOSE OF THIS PROJECT IS TO SPOT LEVEL, PATCH, AND OVERLAY WITH 2' SHOULDER ON APPROXIMATELY 8.335 MILES ON HIGHWAY 114 IN CLEVELAND COUNTY. THIS PROJECT | Cleveland | 2 | Pine Bluff Sand & Gravel Co. | $5,245,267 | $5,813,631 | +11% | ARDOT |
| A30035 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.668 MILES OF HIGHWAY 278 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF | Nevada | 2 | Jet Asphalt & Rock Co., Inc. | $5,225,210 | $7,824,175 | +50% | ARDOT |
| 090602 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 15.338 MILES OF HIGHWAY 7 IN BOONE COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, | Boone | 3 | Apac-Central, Inc. | $4,474,240 | $4,967,412 | +11% | ARDOT |
| A10020 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.713 MILES ON HIGHWAY 1 AND OVERLAY APPROXIMATELY 0.606 MILES OF HIGHWAY 44 IN LEE COUNTY. THI | Lee | 1 | Apac-Tennessee, Inc. | $4,428,661 | ARDOT | ||
| 040912 | THE PURPOSE OF THIS PROJECT IS TO INSTALL AND REPLACE SIGNS ON INTERSTATE 40 IN CRAWFORD AND FRANKLIN COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, | Crawford, Franklin | 1 | Creative Design Concepts, Inc. | $3,281,914 | ARDOT | ||
| A00063 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.777 MILES OF HIGHWAYS 77 AND 140 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, | Mississippi | 2 | Atlas Asphalt, Inc. | $2,242,243 | $2,456,271 | +10% | ARDOT |
| 020778 | THE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING STRUCTURE WITH A QUADRUPLE R.C. BOX CULVERT ON HIGHWAY 293 IN LINCOLN COUNTY. THIS PROJECT CONSISTS OF CLE | Lincoln | 2 | 1911 Construction Company, Inc. | $1,978,212 | $2,199,345 | +11% | ARDOT |
| A30032 | THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 3.947 MILES OF HIGHWAY 196 IN MILLER COUNTY. THIS PROJECT CONSISTS OF A | Miller | 1 | Redstone Const. Group, Inc. | $1,159,037 | ARDOT | ||
| SA5741 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 2.76 MILES OF COUNTY ROADS 56 & 57 IN POLK COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM | Polk | 1 | Blackstone Construction, LLC | $1,056,411 | ARDOT | ||
| C04024 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.30 MILES OF NEW HOPE ROAD IN THE CITY OF ROGERS IN BENTON COUNTY. THIS PROJECT CONSISTS OF ACHM SURFAC | Benton | 3 | Emery Sapp & Sons, Inc. | $1,046,723 | $1,197,973 | +14% | ARDOT |
| A70017 | THE PURPOSE OF THIS PROJECT IS TO APPLY AN ULTRATHIN BONDED WEARING COURSE TO APPROXIMATELY 3.367 MILES OF HIGHWAY 7 IN CLARK COUNTY. THIS PROJECT CONSISTS OF A | Clark | 2 | Redstone Const. Group, Inc. | $921,256 | $1,037,020 | +13% | ARDOT |
| SA1666 | THE PURPOSE OF THIS PROJECT IS TO SEAL APPROXIMATELY 20.15 MILES OF VARIOUS COUNTY ROADS IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF FOG SEAL, ASPHALT SURFACE | Craighead | 2 | Salt Creek Paving & Const. Co., Inc. | $885,829 | $1,021,501 | +15% | ARDOT |
| SA1149 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 2.11 MILES OF CO. RD. 53 IN CLAY COUNTY. THIS PROJECT CONSISTS OF SHAPING ROADWAY SECTION, AGGREGATE BAS | Clay | 3 | Sugg Construction, Inc. | $786,308 | $919,447 | +17% | ARDOT |
| C17011 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.78 MILES OF LUCIAN WOOD ROAD IN THE CITY OF CEDARVILLE IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AG | Crawford | 3 | Emery Sapp & Sons, Inc. | $612,624 | $740,559 | +21% | ARDOT |
| SA4655 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 11.92 MILES OF COUNTY ROADS 13, 25, AND 26 IN MILLER COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TR | Miller | 1 | Salt Creek Paving & Const. Co., Inc. | $604,622 | ARDOT | ||
| SA6648 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF CO. RD. LANDFILL ROAD IN SEVIER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, AC | Sevier | 1 | Tri State Asphalt, Inc. | $598,537 | ARDOT | ||
| SA4140 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF COUNTY ROAD 29 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACH | Little River | 1 | Tri State Asphalt, Inc. | $542,915 | ARDOT | ||
| SA4346 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.04 MILES OF COUNTY ROAD 88, 615 & 617 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE | Lonoke | 2 | CK Asphalt, LLC | $503,103 | $541,842 | +8.0% | ARDOT |
| SA4942 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.50 MILES OF COUNTY ROAD 20 IN MONTGOMERY COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE COURSE, ACHM | Montgomery | 2 | Blackstone Construction, LLC | $465,186 | $469,463 | +1.0% | ARDOT |
| SA5450 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.13 MILES OF COUNTY ROADS 19 AND 288 IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, | Phillips | 2 | Atlas Asphalt, Inc. | $395,592 | $495,857 | +25% | ARDOT |
| SA7540 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 2.01 MILES OF COUNTY ROAD 40 IN YELL COUNTY. THIS PROJECT CONSISTS OF SOIL STABILIZATION, SCARIFYING AND | Yell | 1 | Salt Creek Paving & Const. Co., Inc. | $389,377 | ARDOT | ||
| SA6446 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.37 MILES OF COUNTY ROAD 9 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, PAVEMENT MAR | Searcy | 2 | Apac-Central, Inc. | $389,095 | $420,760 | +8.0% | ARDOT |
| SA7448 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 8.30 MILES OF COUNTY ROADS 17, 18, AND 19 IN WOODRUFF COUNTY. THIS PROJECT CONSISTS OF ASPHALT | Woodruff | 2 | Salt Creek Paving & Const. Co., Inc. | $364,051 | $406,106 | +12% | ARDOT |
| SA5033 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 3.23 MILES OF COUNTY ROADS 37 AND 42 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE | Nevada | 1 | Salt Creek Paving & Const. Co., Inc. | $329,809 | ARDOT | ||
| C04022 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.00 MILE OF VARIOUS CITY STREETS IN THE CITY OF SULPHUR SPRINGS IN BENTON COUNTY. THIS PROJECT CONSISTS | Benton | 3 | Emery Sapp & Sons, Inc. | $259,388 | $341,178 | +32% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.