Capital Paving & Construction, LLC: ARDOT bid record
Capital Paving & Construction, LLC submitted 21 bids on Arkansas DOT contracts in the data, from 10 AUG 2022 to 04 NOV 2026, and was the low bidder on 4 of them (19%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $30,300,985
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 10 | 4 | 40% |
| 2025 | 2 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Independence | 2 | 0 | 0% |
| Boone | 2 | 0 | 0% |
| Lonoke, Pulaski | 1 | 0 | 0% |
| White | 1 | 0 | 0% |
| Cross | 1 | 0 | 0% |
| Jackson | 1 | 0 | 0% |
| Van Buren | 1 | 1 | 100% |
| Prairie | 1 | 1 | 100% |
| Conway | 1 | 0 | 0% |
| Craighead | 1 | 0 | 0% |
| Monroe | 1 | 0 | 0% |
| Lee, Monroe | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Approach slabs | 504031 | CY | 13 | 9 (69%) | $711.08 | $890.73 |
| Reinforcing steel-roadway (grade 60) | 804003 | LB | 17 | 7 (41%) | $2.12 | $2.40 |
| Water | 620030 | MGAL | 21 | 6 (29%) | $6.18 | $10.00 |
| Aggregate base course (class 7) | 303117 | TON | 20 | 6 (30%) | $44.34 | $52.19 |
| Cold milling asphalt pavement | 412002 | SY | 19 | 6 (32%) | $19.27 | $8.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 18 | 6 (33%) | $144.00 | $120.00 |
| Reinforcing steel-bridge (grade 60) | 804013 | LB | 14 | 6 (43%) | $2.15 | $2.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 20 | 5 (25%) | $145.75 | $124.55 |
| Unclassified excavation | 210213 | CY | 20 | 5 (25%) | $21.41 | $25.00 |
| Rock ditch checks | 621151 | CY | 19 | 5 (26%) | $113.00 | $105.00 |
| Traffic drums | 604023 | EACH | 18 | 5 (28%) | $32.00 | $33.00 |
| Asphalt concrete patching for maintenance of traffic | 414011 | TON | 16 | 5 (31%) | $246.00 | $262.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mobley Contractors, Inc. | 11 | 6 of 11 |
| Robertson Contractors, Inc. | 8 | 4 of 8 |
| White River Materials, Inc. | 4 | 4 of 4 |
| Thomco, Inc. | 3 | 2 of 3 |
| Bluff City Construction Co., LLC | 3 | 0 of 3 |
| McMillen, Inc. | 3 | 0 of 3 |
| McGeorge Contracting Co., Inc. | 3 | 3 of 3 |
| Bobby Kennedy Construction Co. | 2 | 1 of 2 |
| West Plains BR. & Grading, LLC | 2 | 1 of 2 |
| R. L. Persons Const., Inc. | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | 050439 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 25 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 3 of 5 | $5,154,911 | +24% |
| 23 SEP 2026 | 070458 | Columbia | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE FOUR LANE MEDIAN STRUCTURE ON HIGHWAY 82 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF CLEARI | 2 of 7 | $28,810,764 | +7.0% |
| 12 AUG 2026 | 030531 | Little River | THE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI | 3 of 6 | $21,478,287 | +26% |
| 24 JUN 2026 | 061748 | Garland | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 600 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 3 of 5 | $1,958,281 | +3.0% |
| 17 SEP 2025 | 070509 | Clark | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 67 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 4 of 6 | $22,258,833 | +16% |
| 21 MAY 2025 | 090581 | Boone | THE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A | 6 of 6 | $15,993,781 | +40% |
| 06 NOV 2024 | 110717 | St. Francis | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE, REPLACE ONE BRIDGE WITH RC BOX CULVERT, AND MILL AND POLYMER OVERLAY ONE BRIDGE ON HIG | 1 of 4 | $6,711,300 | Low, 4.0% under the second |
| 06 NOV 2024 | 101017 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 118 AND COMPLETE FRONTAGE ROAD CONNECTION IN POINSETT COUNTY. THIS PROJE | 2 of 3 | $16,505,505 | +8.0% |
| 18 SEP 2024 | 110706 | Monroe | THE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING BRIDGE ON HIGHWAY 17 IN MONROE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 2 of 2 | $3,884,339 | 0.0% |
| 18 SEP 2024 | 110715 | Lee, Monroe | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE ON HIGHWAY 78 IN LEE COUNTY, REPLACE ONE BRIDGE STRUCTURE WITH A RC BOX CULVE | 1 of 2 | $9,808,675 | Low, 19% under the second |
| 18 SEP 2024 | 101172 | Clay | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW ACCESS-CONTROLLED DIVIDED HIGHWAY FOR APPROXIMATELY 4.019 MILES IN CLAY COUNTY. THIS PROJE | 3 of 4 | $58,500,000 | +5.0% |
| 31 JUL 2024 | 101126 | Craighead | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 158 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 2 of 3 | $4,811,913 | +27% |
| 22 MAY 2024 | 080711 | Conway | THE PURPOSE OF THIS PROJECT IS TO RELOCATE APPROXIMATELY 2.367 MILES OF HIGHWAY 113 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND D | 2 of 5 | $9,853,000 | +1.0% |
| 10 APR 2024 | 061614 | Prairie | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 86 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 1 of 4 | $9,394,382 | Low, 6.0% under the second |
| 10 APR 2024 | 090602 | Boone | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 15.338 MILES OF HIGHWAY 7 IN BOONE COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SH | 3 of 3 | $5,859,000 | +31% |
| 28 FEB 2024 | 080614 | Van Buren | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A BRIDGE ON HIGHWAY 16 IN CLINTON IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF | 1 of 4 | $4,386,628 | Low, 9.0% under the second |
| 17 MAY 2023 | 050466 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 167 IN INDEPENDENCE COUNTY OF APPROXIMATELY 0.080 MILE. THIS PROJECT CONSISTS OF | 3 of 4 | $867,983 | +30% |
| 12 APR 2023 | 050416 | Jackson | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 224 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING TRE | 2 of 4 | $1,320,884 | +19% |
| 11 JAN 2023 | FA1913 | Cross | THE PURPOSE OF THIS PROJECT IS TO SCARIFY AND RECOMPACT SHOULDERS ON 1.378 MILES OF COUNTY ROADS 53 AND 140 AND RECONSTRUCT APPROXIMATELY 1. | 3 of 4 | $3,707,827 | +6.0% |
| 21 SEP 2022 | 050342 | White | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 31 IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 4 of 6 | $11,522,603 | +5.0% |
| 10 AUG 2022 | 061472 | Lonoke, Pulaski | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.221 MILE OF AND CONSTRUCT ONE COMPOSITE W-BEAM UNIT (TOTAL LENGTH 146.3 ') ON HIGH | 4 of 4 | $4,271,882 | +24% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.