ARDOT letting results, August 10, 2022
8 contracts let by Arkansas DOT on August 10, 2022, $133,438,593 in low bids, a median of 2.5 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 8
- Low bids, total
- $133,438,593
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 020678 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 8.252 MILES OF TWO LANE ROADWAY WITH BRIDGE STRUCTURES ON HIGHWAY 569 IN DREW COUNTY. THIS PROJECT CON | Drew | 2 | WL Bass Construction, Inc. | $61,897,828 | $70,544,173 | +14% | ARDOT |
| 070442 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 4.302 MILES OF HIGHWAYS 67 AND 51 IN CLARK COUNTY. THIS PROJECT CONSIST OF TWO PAVING ALTERNATES, ALTE | Clark | 3 | McGeorge Contracting Co., Inc. | $56,113,030 | $61,964,951 | +10% | ARDOT |
| 020588 | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE AND TO WIDEN HIGHWAY 190, INCLUDING CURB, GUTTER, AND SIDEWALKS, IN PINE BLUFF, JEFFERSON COUNTY. HIGHWAY 190 | Jefferson | 1 | Mobley Contractors, Inc. | $5,344,054 | ARDOT | ||
| 061473 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE COMPOSITE W-BEAM UNIT (TOTAL LENGTH 136.17') AND OVERLAY APPROXIMATELY 0.262 MILE OF HIGHWAY 165 IN LONOKE COUNT | Lonoke | 3 | Robertson Contractors, Inc. | $4,052,206 | $4,286,040 | +6.0% | ARDOT |
| 061472 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.221 MILE OF AND CONSTRUCT ONE COMPOSITE W-BEAM UNIT (TOTAL LENGTH 146.3 ') ON HIGHWAY 161 IN PULASKI A | Lonoke, Pulaski | 4 | Robertson Contractors, Inc. | $3,448,527 | $3,625,841 | +5.0% | ARDOT |
| A00018 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 5.222 MILES OF HIGHWAY 14 AT HARRISBURG IN POINSETT COUNTY. THIS PROJECT CON | Poinsett | 3 | Atlas Asphalt, Inc. | $1,999,608 | $2,272,447 | +14% | ARDOT |
| SA6444 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.30 MILES OF COUNTY ROAD 69 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTED BASE COURSE, ACHM | Searcy | 2 | Atlas Asphalt, Inc. | $339,089 | $3,264,395 | +863% | ARDOT |
| SA4551 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.18 MILES OF COUNTY ROAD 24 IN MARION COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURF | Marion | 2 | Atlas Asphalt, Inc. | $244,251 | $254,812 | +4.0% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.