ARDOT letting results, July 31, 2024
8 contracts let by Arkansas DOT on July 31, 2024, $23,576,745 in low bids, a median of 2.5 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 8
- Low bids, total
- $23,576,745
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 090580 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE WELCOME CENTER FACILITY ON INTERSTATE 49 IN BENTON COUNTY. THIS PROJECT CONSISTS OF A MAINTENANCE BUILDING, WELC | Benton | 6 | Construction Services Group | $6,990,000 | $7,866,132 | +13% | ARDOT |
| 101126 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 158 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL | Craighead | 3 | Robertson Contractors, Inc. | $3,796,833 | $4,811,913 | +27% | ARDOT |
| 101120 | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 141 IN CLAY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF | Clay | 1 | Robertson Contractors, Inc. | $3,655,285 | ARDOT | ||
| 040793 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 45 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL | Sebastian | 2 | Hardrock Construction, Inc. | $3,247,118 | $4,037,300 | +24% | ARDOT |
| 050475 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEM | Izard | 4 | Seagraves Construction, Inc. | $2,012,449 | $2,086,092 | +4.0% | ARDOT |
| 090723 | THE PURPOSE OF THIS PROJECT IS TO DIAMOND GRIND THE EXISTING CONCRETE PAVEMENT ON APPROXIMATELY 5.779 MILES OF INTERSTATE 49 IN BENTON COUNTY. THIS PROJECT CONS | Benton | 4 | Diamond Surface, Inc. | $1,604,897 | $2,088,766 | +30% | ARDOT |
| 061855 | THE PURPOSE OF THIS PROJECT IS TO REPAIR EROSION ALONG HIGHWAY 5 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF FENC | Garland | 2 | Grant Garrett Excavating, Inc. | $1,252,084 | $2,488,642 | +99% | ARDOT |
| 040854 | THE PURPOSE OF THIS PROJECT IS TO INSTALL A SIGNAL AT THE INTERSECTION OF HIGHWAY 412 AND KLENC ROAD IN THE CITY OF TONTITOWN IN WASHINGTON COUNTY. THIS PROJECT | Washington | 2 | TLS Construction Group | $1,018,079 | $876,870 | -14% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.