Seagraves Construction, Inc.: ARDOT bid record
Seagraves Construction, Inc. submitted 14 bids on Arkansas DOT contracts in the data, from 29 JUN 2022 to 23 SEP 2026, and was the low bidder on 7 of them (50%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $9,571,011
- Latest bid
- 23 SEP 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 2 | 67% |
| 2023 | 3 | 3 | 100% |
| 2024 | 1 | 1 | 100% |
| 2025 | 1 | 1 | 100% |
| 2026 | 6 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Randolph | 4 | 2 | 50% |
| Greene | 2 | 1 | 50% |
| Clay | 2 | 1 | 50% |
| Mississippi | 1 | 0 | 0% |
| Jackson | 1 | 1 | 100% |
| Izard | 1 | 1 | 100% |
| Poinsett | 1 | 1 | 100% |
| Lee | 1 | 0 | 0% |
| Phillips | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Water | 620030 | MGAL | 14 | 14 (100%) | $10.00 | $10.00 |
| Seeding | 620011 | ACRE | 13 | 11 (85%) | $1,500.00 | $1,500.00 |
| Rock ditch checks | 621151 | CY | 12 | 10 (83%) | $65.00 | $105.00 |
| Silt fence | 621021 | LF | 14 | 9 (64%) | $3.95 | $3.68 |
| Aggregate base course (class 7) | 303117 | TON | 13 | 9 (69%) | $39.00 | $52.19 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 11 | 8 (73%) | $125.00 | $120.00 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 11 | 8 (73%) | $120.00 | $126.00 |
| Lime | 620001 | TON | 14 | 7 (50%) | $125.00 | $105.00 |
| Mulch cover | 620022 | ACRE | 13 | 7 (54%) | $1,197.47 | $1,150.00 |
| Sediment removal and disposal | 621111 | CY | 13 | 7 (54%) | $3.00 | $18.14 |
| Temporary seeding | 621001 | ACRE | 13 | 7 (54%) | $893.64 | $805.89 |
| Unclassified excavation | 210213 | CY | 13 | 7 (54%) | $20.00 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Robertson Contractors, Inc. | 10 | 5 of 10 |
| Mobley Contractors, Inc. | 7 | 1 of 7 |
| R. L. Persons Const., Inc. | 6 | 0 of 6 |
| West Plains BR. & Grading, LLC | 4 | 1 of 4 |
| White River Materials, Inc. | 4 | 3 of 4 |
| Kesser International, Inc. | 3 | 0 of 3 |
| Michelle'S Excavating, Inc. | 3 | 1 of 3 |
| Central Arkansas Contractors, Inc. | 3 | 2 of 3 |
| 1911 Construction Company, Inc. | 2 | 2 of 2 |
| R.L. Persons Construction, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | 110716 | Phillips | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN | 6 of 8 | $3,770,798 | +26% |
| 24 JUN 2026 | BR2814 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT | 3 of 7 | $1,590,762 | +13% |
| 08 APR 2026 | 110751 | Lee | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 6 of 8 | $1,902,503 | +37% |
| 08 APR 2026 | 101115 | Randolph | THE PURPOSE OF THIS PROJECT IS STREAM RESTORATION IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, EARTHWORK, AGGREGATE B | 2 of 4 | $1,415,954 | +73% |
| 04 MAR 2026 | 101003 | Randolph | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 3 of 5 | $4,175,434 | +21% |
| 21 JAN 2026 | FA1108 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT | 4 of 7 | $3,267,312 | +10% |
| 17 SEP 2025 | 101132 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 69 IN POINSETT COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, R | 1 of 3 | $1,257,462 | Low, 10% under the second |
| 31 JUL 2024 | 050475 | Izard | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 1 of 4 | $2,012,449 | Low, 4.0% under the second |
| 01 NOV 2023 | 101053 | Randolph | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE WITH A R.C. BOX CULVERT ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEA | 1 of 3 | $1,470,278 | Low, 4.0% under the second |
| 01 NOV 2023 | BR1113 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 60 FT. TIMBER DECK BRIDGE WITH A QUAD 11' X 11' R.C. BOX CULVERT ON 0.218 MILE OF COU | 1 of 2 | $1,200,274 | Low, 0.0% under the second |
| 17 MAY 2023 | 101130 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 34 IN GREENE COUNTY. THS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 1 of 4 | $1,340,751 | Low, 18% under the second |
| 09 NOV 2022 | 050414 | Jackson | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A REINFORCED CONCRETE BOX CULVERT ON HIGHWAY 980 IN JACKSON COUNTY. THIS PROJECT CON | 1 of 3 | $1,017,538 | Low, 20% under the second |
| 21 SEP 2022 | 100098 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A BOX CULVERT ON HIGHWAY 148 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF CLEARIN | 2 of 4 | $2,834,614 | +20% |
| 29 JUN 2022 | 101010 | Randolph | THE PURPOSE OF THIS PROJECT IS REPLACE ONE STRUCTURE ON HIGHWAY 115 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO | 1 of 3 | $1,272,259 | Low, 8.0% under the second |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.