1911 Construction Company, Inc.: ARDOT bid record

1911 Construction Company, Inc. submitted 11 bids on Arkansas DOT contracts in the data, from 06 APR 2022 to 23 SEP 2026, and was the low bidder on 5 of them (45%). When it was not low, its total sat a median +15% above the low bid.

Owner
Arkansas DOT
Low bid volume
$10,145,225
Latest bid
23 SEP 2026
Data through
04 NOV 2026
11Bids
5Low bids
45Win rate, percent
+15%Median gap to the low bid when not low, 6 bids

By year

YearBidsLow bidsWin rate
202211100%
20233133%
202411100%
2025100%
20265240%
1911 Construction Company, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Jefferson22100%
Lincoln22100%
Cross100%
Dallas100%
Prairie100%
Arkansas100%
Lee100%
Drew100%
Phillips11100%
1911 Construction Company, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Grubbing201111STA108 (80%)$950.00$1,700.00
Water620030MGAL116 (55%)$12.00$10.00
Unclassified excavation210213CY96 (67%)$17.00$25.00
Clearing201011STA96 (67%)$1,000.00$2,000.00
Sediment removal and disposal621111CY115 (45%)$12.00$18.14
Aggregate base course (class 7)303117TON95 (56%)$65.00$52.19
Compacted embankment210611CY95 (56%)$25.00$30.00
Removal and disposal of pipe culverts202096EACH85 (63%)$550.00$1,100.00
Soil stabilization210702TON94 (44%)$250.00$350.00
Class S concrete-roadway802012CY84 (50%)$1,550.00$1,500.00
Rock ditch checks621151CY103 (30%)$120.00$105.00
Cold milling asphalt pavement412002SY73 (43%)$32.00$8.00
1911 Construction Company, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Mobley Contractors, Inc.72 of 7
Kesser International, Inc.40 of 4
Central Arkansas Contractors, Inc.41 of 4
R. L. Persons Const., Inc.30 of 3
Robertson Contractors, Inc.31 of 3
White River Materials, Inc.21 of 2
Seagraves Construction, Inc.20 of 2
T & T Construction, LLC21 of 2
Sugg Construction, Inc.11 of 1
Capital Paving & Construction, LLC10 of 1
1911 Construction Company, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
23 SEP 2026110716PhillipsTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN1 of 8$2,994,162Low, 18% under the second
24 JUN 2026C22005DrewTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND CONSTRUCT APPROACHES ON 0.043 MILE OF 7TH STREET IN WILMAR IN DREW COUNTY3 of 6$686,551+13%
20 MAY 2026020802JeffersonTHE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 15 AND 31 WITH CHANNELIZATION IN JEFFERSON COUNTY. THIS PROJECT CONSI1 of 5$1,159,310Low, 19% under the second
08 APR 2026110751LeeTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA4 of 8$1,824,109+32%
04 MAR 2026020738ArkansasTHE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON COUNTY ROAD BENZAL LANE IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND G3 of 4$3,536,939+17%
26 FEB 2025061744PrairieTHE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE WITH ONE R.C. BOX CULVERT ON HIGHWAY 86 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF CL3 of 3$2,670,377+75%
10 APR 2024020778LincolnTHE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING STRUCTURE WITH A QUADRUPLE R.C. BOX CULVERT ON HIGHWAY 293 IN LINCOLN COUNTY. THIS PRO1 of 2$1,978,212Low, 11% under the second
20 SEP 2023020713LincolnTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A REINFORCED CONCRETE BOX CULVERT ON HIGHWAY 11 IN LINCOLN COUNTY. THIS PROJECT1 of 4$2,554,874Low, 3.0% under the second
12 APR 2023070511DallasTHE PURPOSE OF THIS PROJECT IS TO REPLACE TWO EXISTING STRUCTURES WITH TWO R.C. BOX CULVERTS ON HIGHWAY 9 IN DALLAS COUNTY. THIS PROJECT CON2 of 2$1,829,268+5.0%
11 JAN 2023FA1913CrossTHE PURPOSE OF THIS PROJECT IS TO SCARIFY AND RECOMPACT SHOULDERS ON 1.378 MILES OF COUNTY ROADS 53 AND 140 AND RECONSTRUCT APPROXIMATELY 1.2 of 4$3,548,186+2.0%
06 APR 2022C35002JeffersonTHE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 0.27 MILE OF 13TH AVENUE IN PINE BLUFF IN JEFFERSON COUNTY. THIS PROJECT CONSIST1 of 2$1,458,667Low, 43% under the second
1911 Construction Company, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy