ARDOT contract 020738 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON COUNTY ROAD BENZAL LANE IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEM, EARTHWORK, AGGREGATE BASE COURSE, APPROACH SLABS AND GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, PAVEMENT MARKING, CONSTRUCT A CONTINUOUS R. C. UNIT (140'), AND MISC. ITEMS. Let by Arkansas DOT on March 4, 2026, Arkansas. 4 bids received; low bid $3,033,588 by Mobley Contractors, Inc..
- Owner
- Arkansas DOT
- Letting
- 04 MAR 2026
- Pay items
- 50
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mobley Contractors, Inc. | $3,033,588 | Low |
| 2 | Robertson Contractors, Inc. | $3,290,312 | +8.0% |
| 3 | 1911 Construction Company, Inc. | $3,536,939 | +17% |
| 4 | Manhattan Road & Bridge Co. | $4,173,301 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mobley Contractors, Inc. | 2. Robertson Contractors, Inc. | 3. 1911 Construction Company, Inc. | 4. Manhattan Road & Bridge Co. |
|---|---|---|---|---|---|---|---|
| 0001 | Clearing (201011) | STA | 6 | $2,003.23 | $4,500.00 | $2,500.00 | $11,500 |
| 0002 | Grubbing (201111) | STA | 6 | $1,784.64 | $2,500.00 | $2,500.00 | $11,500 |
| 0003 | Removal and disposal of guardrail (202132) | LF | 179 | $19.92 | $10.00 | $15.60 | $100.00 |
| 0004 | Removal of existing bridge structure (site no. 1) (205011) | LS | 1 | $275,975 | $55,000 | $50,000 | $300,000 |
| 0005 | Unclassified excavation (210213) | CY | 239 | $90.93 | $40.00 | $20.00 | $60.00 |
| 0006 | Compacted embankment (210611) | CY | 1,480 | $52.78 | $48.00 | $35.00 | $105.00 |
| 0007 | Soil stabilization (210702) | TON | 200 | $65.63 | $300.00 | $300.00 | $100.00 |
| 0008 | Aggregate base course (class 7) (303117) | TON | 602 | $118.55 | $78.00 | $80.00 | $105.00 |
| 0009 | Approach slabs (504031) | CY | 79.64 | $953.05 | $1,185.00 | $1,250.00 | $2,500.00 |
| 0010 | Approach gutters (504264) | CY | 21.44 | $1,494.18 | $1,450.00 | $2,000.00 | $3,000.00 |
| 0011 | Furnishing field office (602011) | EACH | 1 | $36,023 | $30,000 | $35,000 | $55,000 |
| 0012 | Maintenance of traffic (603009) | LS | 1 | $210,511 | $75,000 | $35,000 | $75,000 |
| 0013 | Signs (604003) | SF | 227 | $15.75 | $10.00 | $15.00 | $10.55 |
| 0014 | Barricades (604013) | LF | 32 | $52.50 | $20.00 | $30.00 | $21.10 |
| 0015 | Guardrail (type A) (617005) | LF | 200 | $31.50 | $30.00 | $52.00 | $31.75 |
| 0016 | Terminal anchor posts (type 1) (617105) | EACH | 4 | $2,047.50 | $1,950.00 | $3,500.00 | $2,100.00 |
| 0017 | Thrie beam guardrail terminal (617332) | EACH | 4 | $2,415.00 | $2,300.00 | $3,500.00 | $2,500.00 |
| 0018 | Lime (620001) | TON | 1 | $315.00 | $125.00 | $390.00 | $315.75 |
| 0019 | Seeding (620011) | ACRE | 0.32 | $5,932.50 | $395.00 | $7,300.00 | $5,950.00 |
| 0020 | Mulch cover (620022) | ACRE | 0.64 | $5,932.50 | $3,950.00 | $7,300.00 | $5,950.00 |
| 0021 | Water (620030) | MGAL | 39.10 | $10.50 | $10.00 | $13.00 | $10.55 |
| 0022 | Temporary seeding (621001) | ACRE | 0.32 | $3,937.50 | $2,875.00 | $4,875.00 | $3,950.00 |
| 0023 | Silt fence (621021) | LF | 1,600 | $4.20 | $3.86 | $6.00 | $4.25 |
| 0024 | Sand bag ditch checks (621031) | BAG | 198 | $12.60 | $11.37 | $15.00 | $12.65 |
| 0025 | Sediment basin (621071) | CY | 100 | $5.25 | $5.20 | $17.00 | $275.00 |
| 0026 | Obliteration of sediment basin (621101) | CY | 100 | $5.25 | $5.20 | $17.00 | $175.00 |
| 0027 | Sediment removal and disposal (621111) | CY | 387 | $5.25 | $3.00 | $20.00 | $25.00 |
| 0028 | Rock ditch checks (621151) | CY | 15 | $218.75 | $215.00 | $120.00 | $1,200.00 |
| 0029 | Filter sock (18") (621169) | LF | 5,500 | $11.99 | $11.68 | $15.60 | $12.05 |
| 0030 | Wattle (20") (621173) | LF | 90 | $15.75 | $14.29 | $18.00 | $15.85 |
| 0031 | Second seeding application (623001) | ACRE | 0.32 | $1,680.00 | $829.50 | $2,000.00 | $1,685.00 |
| 0032 | Erosion control matting (class 3) (626003) | SY | 2,667 | $7.35 | $5.65 | $10.00 | $7.50 |
| 0033 | Roadway construction control (635001) | LS | 1 | $46,280 | $55,000 | $65,000 | $75,000 |
| 0034 | Reflectorized paint pavement marking white (6") (718002) | LF | 420 | $2.10 | $6.00 | $8.00 | $6.50 |
| 0035 | Reflectorized paint pavement marking yellow (6") (718102) | LF | 420 | $2.10 | $6.00 | $8.00 | $6.50 |
| 0036 | Unclassified excavation for structures-bridge (801001) | CY | 3 | $506.67 | $650.00 | $860.00 | $750.00 |
| 0037 | Class S concrete-bridge (802112) | CY | 67 | $3,000.30 | $2,665.00 | $1,760.00 | $7,300.00 |
| 0038 | Class S(AE) concrete-bridge (802122) | CY | 295.20 | $2,221.13 | $2,890.00 | $3,400.00 | $2,700.00 |
| 0039 | Class 2 protective surface treatment (803004) | SY | 408.40 | $8.40 | $16.50 | $13.00 | $8.50 |
| 0040 | Reinforcing steel-roadway (grade 60) (804003) | LB | 11,652 | $2.49 | $2.55 | $3.15 | $2.50 |
| 0041 | Reinforcing steel-bridge (grade 60) (804013) | LB | 8,570 | $3.33 | $2.80 | $2.50 | $2.75 |
| 0042 | Epoxy coated reinforcing steel (grade 60) (804023) | LB | 77,290 | $2.03 | $2.60 | $3.25 | $2.50 |
| 0043 | Steel shell piling (18" diameter) (805124) | LF | 620 | $233.97 | $325.00 | $305.00 | $240.00 |
| 0044 | Steel shell piling (24" diameter) (805127) | LF | 1,235 | $257.78 | $415.00 | $435.00 | $300.00 |
| 0045 | Pile encasement (805513) | LF | 227 | $249.40 | $325.00 | $362.00 | $750.00 |
| 0046 | Metal bridge railing (type 2T42) (806018) | LF | 318 | $461.04 | $556.00 | $565.00 | $500.00 |
| 0047 | Bridge name plate (type D) (812004) | EACH | 1 | $2,827.27 | $3,500.00 | $2,830.00 | $9,500.00 |
| 0048 | Filter blanket (816003) | SY | 448 | $17.71 | $8.00 | $7.00 | $55.00 |
| 0049 | Foundation protection riprap (816131) | TON | 1,145 | $98.13 | $145.00 | $192.00 | $150.00 |
| 0050 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $138,436 | $156,000 | $160,000 | $192,600 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of March 4, 2026. Compiled by Mirage Metrics.