ARDOT contract 110716 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF PIPE CULVERTS, STONE BACKFILL, EARTHWORK, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, EROSION CONTROL, PAVEMENT MARKING, CONSTRUCT THREE R.C. BOX CULVERTS (TOTAL LENGTH 128.50'), AND MISC ITEMS. Let by Arkansas DOT on September 23, 2026, Phillips. 8 bids received; low bid $2,994,162 by 1911 Construction Company, Inc..
- Owner
- Arkansas DOT
- Letting
- 23 SEP 2026
- Pay items
- 48
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | 1911 Construction Company, Inc. | $2,994,162 | Low |
| 2 | Robertson Contractors, Inc. | $3,533,216 | +18% |
| 3 | Central Arkansas Contractors, Inc. | $3,632,862 | +21% |
| 4 | White River Materials, Inc. | $3,716,519 | +24% |
| 5 | T & T Construction, LLC | $3,717,801 | +24% |
| 6 | Seagraves Construction, Inc. | $3,770,798 | +26% |
| 7 | Mobley Contractors, Inc. | $3,989,844 | +33% |
| 8 | Kesser International, Inc. | $4,222,227 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. 1911 Construction Company, Inc. | 2. Robertson Contractors, Inc. | 3. Central Arkansas Contractors, Inc. | 4. White River Materials, Inc. | 5. T & T Construction, LLC | 6. Seagraves Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Clearing (201011) | STA | 11 | $700.00 | $4,500.00 | $2,000.00 | $630.87 | $2,000.00 | $5,000.00 |
| 0002 | Grubbing (201111) | STA | 11 | $700.00 | $1,000.00 | $2,000.00 | $1,030.82 | $2,000.00 | $5,000.00 |
| 0003 | Removal and disposal of pipe culverts (202096) | EACH | 3 | $500.00 | $950.00 | $1,500.00 | $543.65 | $150.00 | $1,000.00 |
| 0004 | Removal of existing bridge structure (site no. 1) (205011) | LS | 1 | $40,000 | $50,000 | $45,000 | $46,375 | $25,000 | $65,000 |
| 0005 | Removal of existing bridge structure (site no. 2) (205012) | LS | 1 | $43,000 | $60,000 | $65,000 | $114,394 | $40,000 | $65,000 |
| 0006 | Removal of existing bridge structure (site no. 3) (205013) | LS | 1 | $40,000 | $50,000 | $45,000 | $77,026 | $25,000 | $65,000 |
| 0007 | Stone backfill (207011) | TON | 2,256 | $80.00 | $83.00 | $92.50 | $134.87 | $78.00 | $105.00 |
| 0008 | Unclassified excavation (210213) | CY | 11,520 | $10.00 | $22.00 | $32.50 | $29.53 | $18.00 | $26.00 |
| 0009 | Compacted embankment (210611) | CY | 7,342 | $28.00 | $31.80 | $35.00 | $49.86 | $28.00 | $32.00 |
| 0010 | Soil stabilization (210702) | TON | 100 | $25.00 | $410.00 | $350.00 | $221.69 | $600.00 | $100.00 |
| 0011 | Aggregate base course (class 7) (303117) | TON | 2,632 | $73.00 | $64.00 | $81.53 | $93.52 | $70.00 | $76.00 |
| 0012 | Tack coat (401011) | GAL | 323 | $27.40 | $23.84 | $10.00 | $0.01 | $5.00 | $23.84 |
| 0013 | Mineral aggregate in achm binder course (1") (406161) | TON | 404 | $339.00 | $290.74 | $260.00 | $290.74 | $285.00 | $290.74 |
| 0014 | Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412) | TON | 20 | $138.00 | $120.00 | $825.00 | $120.00 | $165.00 | $120.00 |
| 0015 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 750 | $243.00 | $210.64 | $260.00 | $210.64 | $288.00 | $210.64 |
| 0016 | Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442) | TON | 49 | $138.00 | $120.00 | $440.00 | $120.00 | $165.00 | $120.00 |
| 0017 | Cold milling asphalt pavement (412002) | SY | 1,644 | $32.00 | $28.00 | $30.00 | $16.58 | $27.00 | $28.00 |
| 0018 | Furnishing field office (602011) | EACH | 1 | $35,000 | $30,000 | $40,000 | $43,097 | $30,000 | $75,000 |
| 0019 | Maintenance of traffic (603010) | LS | 1 | $143,000 | $125,000 | $95,000 | $52,550 | $100,000 | $68,500 |
| 0020 | Signs (604003) | SF | 235 | $11.50 | $8.50 | $55.50 | $10.00 | $20.00 | $30.00 |
| 0021 | Barricades (604013) | LF | 64 | $28.75 | $18.00 | $38.00 | $25.00 | $50.00 | $25.00 |
| 0022 | 24" side drain (606704) | LF | 166 | $80.00 | $126.00 | $125.00 | $69.79 | $100.00 | $105.00 |
| 0023 | Selected pipe bedding (606994) | CY | 20 | $100.00 | $135.00 | $110.00 | $1.20 | $100.00 | $10.00 |
| 0024 | 4" pipe underdrains (611008) | LF | 500 | $10.00 | $27.63 | $28.00 | $1.05 | $20.00 | $1.00 |
| 0025 | Underdrain outlet protectors (611013) | EACH | 2 | $50.00 | $597.50 | $950.00 | $150.00 | $850.00 | $100.00 |
| 0026 | 24" automatic floodgates (616006) | EACH | 1 | $800.00 | $22,500 | $17,500 | $12,726 | $12,000 | $18,400 |
| 0027 | Lime (620001) | TON | 9 | $125.00 | $100.00 | $150.00 | $100.00 | $150.00 | $100.00 |
| 0028 | Seeding (620011) | ACRE | 4.34 | $1,500.00 | $1,500.00 | $1,600.00 | $1,500.00 | $1,800.00 | $1,500.00 |
| 0029 | Mulch cover (620022) | ACRE | 10.69 | $1,500.00 | $1,200.00 | $1,400.00 | $1,200.00 | $1,300.00 | $1,200.00 |
| 0030 | Water (620030) | MGAL | 573.90 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0031 | Temporary seeding (621001) | ACRE | 6.35 | $675.00 | $750.00 | $700.00 | $750.00 | $800.00 | $750.00 |
| 0032 | Silt fence (621021) | LF | 601 | $8.00 | $4.00 | $6.00 | $4.00 | $8.00 | $4.00 |
| 0033 | Sand bag ditch checks (621031) | BAG | 110 | $15.00 | $11.00 | $15.00 | $11.00 | $15.00 | $11.00 |
| 0034 | Sediment basin (621071) | CY | 133 | $12.00 | $1.00 | $50.00 | $1.02 | $10.00 | $3.00 |
| 0035 | Obliteration of sediment basin (621101) | CY | 133 | $15.00 | $1.00 | $50.00 | $1.02 | $10.00 | $3.00 |
| 0036 | Sediment removal and disposal (621111) | CY | 163 | $15.00 | $3.57 | $40.00 | $1.02 | $10.00 | $3.00 |
| 0037 | Rock ditch checks (621151) | CY | 21 | $120.00 | $225.00 | $125.00 | $157.48 | $200.00 | $102.00 |
| 0038 | Second seeding application (623001) | ACRE | 4.34 | $650.00 | $450.00 | $700.00 | $450.00 | $500.00 | $450.00 |
| 0039 | Solid sodding (624001) | SY | 139 | $15.00 | $8.90 | $12.00 | $8.90 | $13.00 | $8.90 |
| 0040 | Erosion control matting (class 3) (626003) | SY | 916 | $25.00 | $8.00 | $8.00 | $8.00 | $13.00 | $8.00 |
| 0041 | Roadway construction control (635001) | LS | 1 | $75,000 | $90,000 | $60,000 | $72,539 | $150,000 | $81,000 |
| 0042 | Reflectorized paint pavement marking white (6") (718002) | LF | 3,260 | $1.15 | $1.00 | $2.50 | $1.00 | $1.75 | $2.20 |
| 0043 | Reflectorized paint pavement marking yellow (6") (718102) | LF | 3,260 | $1.15 | $1.00 | $2.50 | $1.00 | $1.75 | $2.20 |
| 0044 | Raised pavement markers (type II) (721002) | EACH | 21 | $23.00 | $20.00 | $150.00 | $20.00 | $30.00 | $50.00 |
| 0045 | Unclassified excavation for structures-roadway (801101) | CY | 412 | $75.00 | $230.00 | $195.00 | $103.78 | $80.00 | $210.00 |
| 0046 | Class S concrete-roadway (802012) | CY | 842.64 | $1,250.00 | $1,450.00 | $1,350.00 | $1,499.29 | $1,825.00 | $1,575.00 |
| 0047 | Reinforcing steel-bridge (grade 60) (804013) | LB | 105,580 | $1.75 | $2.25 | $2.10 | $2.00 | $2.50 | $2.10 |
| 0048 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $136,000 | $168,000 | $150,000 | $98,865 | $120,000 | $175,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of September 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.