ARDOT contract 110751 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, STONE BACKFILL, EARTHWORK, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, EROSION CONTROL, PAVEMENT MARKINGS, CONSTRUCT ONE RC BOX CULVERT (51.25') AND MISC ITEMS. Let by Arkansas DOT on April 8, 2026, Lee. 8 bids received; low bid $1,385,874 by White River Materials, Inc..

Owner
Arkansas DOT
Letting
08 APR 2026
Pay items
54
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1White River Materials, Inc.$1,385,874Low
2Central Arkansas Contractors, Inc.$1,609,814+16%
3Weaver-Bailey Contractors, Inc.$1,728,833+25%
41911 Construction Company, Inc.$1,824,109+32%
5Mobley Contractors, Inc.$1,832,841+32%
6Seagraves Construction, Inc.$1,902,503+37%
7Bluff City Construction Co., LLC$2,057,220+48%
8Robertson Contractors, Inc.$2,104,660+52%
ARDOT contract 110751: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. White River Materials, Inc.2. Central Arkansas Contractors, Inc.3. Weaver-Bailey Contractors, Inc.4. 1911 Construction Company, Inc.5. Mobley Contractors, Inc.6. Seagraves Construction, Inc.
0001Clearing (201011)STA10$623.74$1,200.00$1,027.58$900.00$2,755.15$4,000.00
0002Grubbing (201111)STA10$606.76$1,200.00$656.10$850.00$2,692.19$4,000.00
0003Removal and disposal of pipe culverts (202096)EACH3$239.69$650.00$1,059.77$500.00$2,190.84$1,000.00
0004Removal and disposal of headwalls (202099)EACH2$672.50$1,000.00$1,500.35$400.00$2,295.77$2,500.00
0005Removal of existing bridge structure (site no. 1) (205011)LS1$42,000$50,000$61,210$45,000$41,040$50,000
0006Stone backfill (207011)TON524$69.88$46.77$67.48$79.00$85.27$80.00
0007Unclassified excavation (210213)CY8,269$16.57$17.50$15.87$17.50$22.59$18.00
0008Compacted embankment (210611)CY5,460$19.14$20.00$23.75$21.00$25.43$23.00
0009Soil stabilization (210702)TON50$397.60$200.00$462.19$200.00$262.50$25.00
0010Aggregate base course (class 7) (303117)TON1,787$57.29$48.50$54.94$72.50$70.64$69.00
0011Tack coat (401011)GAL412$4.00$8.80$8.80$9.00$8.40$8.00
0012Mineral aggregate in achm binder course (1") (406161)TON78$138.34$178.55$178.55$185.00$170.44$162.32
0013Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON4$120.00$132.00$132.00$135.00$126.00$120.00
0014Mineral aggregate in achm surface course (1/2") (407162)TON563$138.34$178.55$178.55$185.00$170.44$162.32
0015Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON35$120.00$132.00$132.00$135.00$126.00$120.00
0016Cold milling asphalt pavement (412002)SY444$17.00$34.00$26.87$30.00$25.65$24.43
0017Asphalt concrete patching for maintenance of traffic (414011)TON10$150.00$150.00$322.92$155.00$141.75$350.00
0018Achm patching of existing roadway (415011)TON39$150.00$415.00$405.55$455.00$420.00$400.00
0019Furnishing field office (602011)EACH1$16,671$20,000$43,392$28,000$40,849$45,000
0020Maintenance of traffic (603009)LS1$52,724$25,000$56,900$35,000$136,719$55,000
002196" temporary culvert (603096)LF168$495.27$392.50$484.25$500.00$393.25$405.00
0022Signs (604003)SF360$8.00$20.00$8.25$9.50$8.40$7.50
0023Barricades (604013)LF96$23.00$35.00$17.60$26.50$24.15$16.00
0024Traffic drums (604023)EACH22$23.00$50.00$27.50$26.50$24.15$25.00
0025Construction pavement markings (604041)LF11,516$0.14$0.28$0.15$0.20$0.15$0.31
0026Removal of construction pavement markings (604055)LF8,316$0.17$0.34$0.19$0.23$0.18$0.65
0027Removal of permanent pavement markings (604061)LF1,680$0.17$0.34$0.19$0.23$0.18$0.65
0028Concrete ditch paving (type A) (605011)SY172$101.33$195.50$183.39$300.00$183.34$140.00
002930" reinforced concrete pipe culverts (class III) (605611)LF4$749.52$140.00$1,655.97$140.00$514.78$200.00
003030" flared end sections for reinforced concrete pipe culverts (605860)EACH2$3,420.60$840.00$3,191.40$1,700.00$2,477.18$1,500.00
003118" side drain (606703)LF40$53.21$54.00$114.83$71.00$121.97$105.00
003236" side drain (606706)LF38$135.13$125.00$219.65$170.00$177.04$145.00
0033Selected pipe bedding (606994)CY10$208.76$92.00$144.63$100.00$228.43$10.00
00344" pipe underdrains (611008)LF440$1.64$5.50$21.33$10.00$18.23$5.00
0035Underdrain outlet protectors (611013)EACH4$293.16$650.00$1,277.55$6.50$1,213.40$100.00
0036Lime (620001)TON5$150.00$137.00$165.00$150.00$157.50$125.00
0037Seeding (620011)ACRE2.26$1,400.00$1,531.00$1,540.00$1,595.00$1,470.00$1,329.47
0038Mulch cover (620022)ACRE8.99$1,000.00$1,200.00$1,100.00$1,398.00$1,050.00$1,164.19
0039Water (620030)MGAL369.60$10.00$10.00$11.00$10.00$10.50$10.00
0040Temporary seeding (621001)ACRE6.73$750.00$982.00$825.00$1,073.00$787.50$893.64
0041Silt fence (621021)LF2,831$3.50$4.50$3.85$4.20$3.68$3.48
0042Sediment removal and disposal (621111)CY136$2.82$12.00$37.66$15.00$24.54$5.00
0043Rock ditch checks (621151)CY116$105.77$104.00$167.72$120.00$80.65$125.00
0044Second seeding application (623001)ACRE2.26$450.00$546.00$495.00$600.00$472.50$495.00
0045Solid sodding (624001)SY135$11.00$8.25$12.10$9.00$11.55$7.37
0046Erosion control matting (class 3) (626003)SY63$15.00$9.50$16.50$11.00$15.75$8.98
0047Roadway construction control (635001)LS1$48,150$23,500$41,330$35,000$19,375$75,000
0048Reflectorized paint pavement marking white (6") (718002)LF1,892$0.16$0.34$0.18$0.22$0.17$1.57
0049Reflectorized paint pavement marking yellow (6") (718102)LF1,892$0.16$0.34$0.18$0.22$0.17$1.57
0050Raised pavement markers (type II) (721002)EACH55$4.00$245.00$4.40$4.90$4.20$9.05
0051Unclassified excavation for structures-roadway (801101)CY170$100.00$250.00$184.45$140.00$355.32$150.00
0052Class S concrete-roadway (802012)CY374.35$1,000.00$1,400.00$1,393.77$1,600.00$1,190.71$1,620.00
0053Reinforcing steel-roadway (grade 60) (804003)LB46,023$1.85$1.92$1.48$2.75$2.18$2.25
0054Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$46,064$75,000$82,325$86,000$75,133$90,000
ARDOT contract 110751: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.