ARDOT contract 101003 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH SLABS AND GUTTERS, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, GUARDRAIL, EROSION CONTROL, PAVEMENT MARKINGS, AND MISC. ITEMS. Let by Arkansas DOT on March 4, 2026, Randolph. 5 bids received; low bid $3,436,888 by Robertson Contractors, Inc..
- Owner
- Arkansas DOT
- Letting
- 04 MAR 2026
- Pay items
- 90
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Robertson Contractors, Inc. | $3,436,888 | Low |
| 2 | West Plains BR. & Grading, LLC | $3,472,000 | +1.0% |
| 3 | Seagraves Construction, Inc. | $4,175,434 | +21% |
| 4 | Mobley Contractors, Inc. | $4,539,552 | +32% |
| 5 | Graylee Construction, LLC | $5,984,465 | +74% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Robertson Contractors, Inc. | 2. West Plains BR. & Grading, LLC | 3. Seagraves Construction, Inc. | 4. Mobley Contractors, Inc. | 5. Graylee Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Clearing (201011) | STA | 30 | $1,500.00 | $275.00 | $200.00 | $1,705.16 | $1,544.00 |
| 0002 | Grubbing (201111) | STA | 30 | $1,000.00 | $275.00 | $200.00 | $1,420.96 | $1,544.00 |
| 0003 | Removal and disposal of fence (202011) | LF | 2,466 | $2.00 | $1.35 | $2.00 | $3.46 | $3.52 |
| 0004 | Removal and disposal of pipe culverts (202096) | EACH | 6 | $650.00 | $600.00 | $500.00 | $1,192.85 | $690.00 |
| 0005 | Removal and disposal of guardrail (202132) | LF | 104 | $10.00 | $14.00 | $5.00 | $34.41 | $11.91 |
| 0006 | Removal of existing bridge structure (site no. 1) (205011) | LS | 1 | $30,000 | $20,000 | $65,000 | $75,889 | $55,350 |
| 0007 | Unclassified excavation (210213) | CY | 5,901 | $16.00 | $19.00 | $10.00 | $27.69 | $59.25 |
| 0008 | Compacted embankment (210611) | CY | 27,187 | $20.50 | $22.00 | $18.00 | $28.85 | $53.84 |
| 0009 | Soil stabilization (210702) | TON | 50 | $150.00 | $75.00 | $20.00 | $262.50 | $620.40 |
| 0010 | Aggregate base course (class 7) (303117) | TON | 5,637 | $32.00 | $38.00 | $25.00 | $43.53 | $74.97 |
| 0011 | Tack coat (401011) | GAL | 1,053 | $5.00 | $5.00 | $6.50 | $5.25 | $5.70 |
| 0012 | Mineral aggregate in achm binder course (1") (406161) | TON | 897 | $111.13 | $111.13 | $120.00 | $110.25 | $105.69 |
| 0013 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 44 | $120.00 | $120.00 | $120.00 | $126.00 | $1,945.91 |
| 0014 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 1,627 | $116.90 | $116.90 | $125.00 | $115.50 | $106.47 |
| 0015 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 97 | $120.00 | $120.00 | $125.00 | $126.00 | $1,920.19 |
| 0016 | Cold milling asphalt pavement (412002) | SY | 644 | $13.83 | $17.00 | $20.00 | $26.25 | $10.88 |
| 0017 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 13 | $150.00 | $150.00 | $250.00 | $276.57 | $369.23 |
| 0018 | Achm patching of existing roadway (415011) | TON | 10 | $350.00 | $150.00 | $250.00 | $157.50 | $381.00 |
| 0019 | Approach slabs (504031) | CY | 54.60 | $1,085.00 | $715.00 | $1,650.00 | $1,371.15 | $1,013.20 |
| 0020 | Approach gutters (504264) | CY | 17 | $1,150.00 | $860.00 | $1,550.00 | $1,584.48 | $1,754.12 |
| 0021 | Furnishing field office (602011) | EACH | 1 | $15,000 | $25,000 | $70,000 | $51,373 | $45,600 |
| 0022 | Maintenance of traffic (603009) | LS | 1 | $75,000 | $208,526 | $105,000 | $278,242 | $332,921 |
| 0023 | 24" temporary culvert (603024) | LF | 25 | $150.00 | $92.50 | $95.00 | $249.57 | $99.60 |
| 0024 | Signs (604003) | SF | 337 | $7.25 | $7.25 | $9.00 | $9.45 | $9.17 |
| 0025 | Barricades (604013) | LF | 32 | $16.00 | $16.00 | $20.00 | $21.00 | $37.50 |
| 0026 | Traffic drums (604023) | EACH | 72 | $25.00 | $25.00 | $30.00 | $31.50 | $42.13 |
| 0027 | Furnishing and installing precast concrete barrier (604031) | LF | 2,006 | $46.00 | $55.00 | $75.00 | $58.54 | $70.97 |
| 0028 | Relocating precast concrete barrier (max. bid 25% of item number ) (604036) | LF | 480 | $10.00 | $12.00 | $15.00 | $12.60 | $15.00 |
| 0029 | Construction pavement markings (604041) | LF | 32,392 | $0.20 | $0.20 | $0.45 | $0.42 | $1.20 |
| 0030 | Removable construction pavement markings (604051) | LF | 764 | $2.45 | $2.45 | $3.90 | $3.15 | $5.51 |
| 0031 | Removal of construction pavement markings (604055) | LF | 1,648 | $1.06 | $1.06 | $1.00 | $1.58 | $1.50 |
| 0032 | Vertical panels (604083) | EACH | 19 | $25.00 | $25.00 | $37.00 | $38.85 | $31.20 |
| 0033 | Concrete ditch paving (type B) (605012) | SY | 213 | $170.00 | $125.00 | $125.00 | $154.09 | $219.60 |
| 0034 | 18" side drain (606703) | LF | 36 | $105.00 | $70.00 | $75.00 | $172.77 | $78.48 |
| 0035 | 24" side drain (606704) | LF | 162 | $130.00 | $85.00 | $90.00 | $167.08 | $107.75 |
| 0036 | 36" side drain (606706) | LF | 92 | $165.00 | $140.00 | $110.00 | $199.25 | $194.48 |
| 0037 | Selected pipe bedding (606994) | CY | 50 | $35.00 | $35.00 | $25.00 | $20.40 | $21.60 |
| 0038 | 4" pipe underdrains (611008) | LF | 2,000 | $2.59 | $1.85 | $5.00 | $17.14 | $13.20 |
| 0039 | Underdrain outlet protectors (611013) | EACH | 9 | $544.53 | $350.00 | $750.00 | $1,185.81 | $823.33 |
| 0040 | Pavement repair over culverts (asphalt) (615022) | TON | 9 | $350.00 | $350.00 | $250.00 | $770.22 | $474.00 |
| 0041 | Guardrail (type A) (617005) | LF | 450 | $31.00 | $30.00 | $39.32 | $31.50 | $42.27 |
| 0042 | Guardrail terminal (type 2) (617312) | EACH | 4 | $3,300.00 | $3,200.00 | $3,733.50 | $3,360.00 | $4,260.00 |
| 0043 | Thrie beam guardrail terminal (617332) | EACH | 4 | $3,125.00 | $2,200.00 | $2,620.84 | $2,310.00 | $3,300.00 |
| 0044 | Wire fence (type C) (619027) | LF | 1,545 | $8.25 | $8.25 | $6.89 | $8.66 | $10.74 |
| 0045 | Lime (620001) | TON | 18 | $75.00 | $75.00 | $95.00 | $78.75 | $90.00 |
| 0046 | Seeding (620011) | ACRE | 9.09 | $1,350.00 | $1,350.00 | $1,285.00 | $1,417.50 | $1,858.00 |
| 0047 | Mulch cover (620022) | ACRE | 41.81 | $950.00 | $950.00 | $987.00 | $997.50 | $1,170.00 |
| 0048 | Water (620030) | MGAL | 1,596.40 | $5.00 | $5.00 | $5.00 | $5.25 | $6.00 |
| 0049 | Temporary seeding (621001) | ACRE | 32.72 | $700.00 | $700.00 | $837.64 | $735.00 | $840.00 |
| 0050 | Silt fence (621021) | LF | 6,611 | $3.50 | $3.50 | $3.68 | $3.68 | $4.20 |
| 0051 | Sand bag ditch checks (621031) | BAG | 678 | $9.50 | $9.50 | $12.96 | $9.98 | $11.40 |
| 0052 | Sediment basin (621071) | CY | 586 | $1.77 | $3.25 | $5.00 | $28.95 | $23.34 |
| 0053 | Obliteration of sediment basin (621101) | CY | 510 | $2.04 | $3.50 | $5.00 | $11.02 | $15.34 |
| 0054 | Sediment removal and disposal (621111) | CY | 921 | $0.56 | $0.05 | $5.00 | $12.21 | $15.44 |
| 0055 | Rock ditch checks (621151) | CY | 178 | $85.00 | $73.00 | $65.00 | $126.75 | $107.39 |
| 0056 | Filter sock (12") (621168) | LF | 640 | $7.76 | $7.76 | $7.89 | $8.15 | $9.60 |
| 0057 | Triangular silt dike (621181) | LF | 243 | $13.00 | $13.00 | $13.68 | $13.65 | $18.00 |
| 0058 | Second seeding application (623001) | ACRE | 9.09 | $300.00 | $300.00 | $395.00 | $315.00 | $372.00 |
| 0059 | Solid sodding (624001) | SY | 144 | $7.20 | $7.20 | $13.63 | $7.56 | $9.00 |
| 0060 | Roadway construction control (635001) | LS | 1 | $35,000 | $20,000 | $85,000 | $51,877 | $81,000 |
| 0061 | Bridge construction control (636001) | LS | 1 | $30,000 | $20,000 | $95,000 | $21,687 | $96,000 |
| 0062 | Mailboxes (637001) | EACH | 1 | $50.00 | $50.00 | $75.00 | $78.75 | $420.00 |
| 0063 | Mailbox supports (single) (637017) | EACH | 1 | $150.00 | $150.00 | $195.00 | $204.75 | $375.60 |
| 0064 | Reflectorized paint pavement marking white (6") (718002) | LF | 5,824 | $0.47 | $0.47 | $0.45 | $1.05 | $0.60 |
| 0065 | Reflectorized paint pavement marking yellow (6") (718102) | LF | 5,824 | $0.47 | $0.47 | $0.45 | $1.05 | $0.60 |
| 0066 | Raised pavement markers (type II) (721002) | EACH | 37 | $5.80 | $5.80 | $20.00 | $26.25 | $24.00 |
| 0067 | Temporary impact attenuation barrier (731071) | EACH | 2 | $5,000.00 | $5,000.00 | $5,500.00 | $7,758.56 | $12,000 |
| 0068 | Temporary impact attenuation barrier (repair) (731072) | EACH | 2 | $1,000.00 | $1,000.00 | $500.00 | $525.00 | $1,200.00 |
| 0069 | Temporary impact attenuation barrier (relocation) (731075) | EACH | 2 | $4,000.00 | $4,000.00 | $3,500.00 | $3,675.00 | $2,400.00 |
| 0070 | Class S concrete-bridge (802112) | CY | 55.70 | $1,750.00 | $1,650.00 | $2,150.00 | $2,784.17 | $1,570.30 |
| 0071 | Class S(AE) concrete-bridge (802122) | CY | 174 | $1,775.00 | $1,500.00 | $2,650.00 | $2,118.83 | $1,915.52 |
| 0072 | Class 2 protective surface treatment (803004) | SY | 560.20 | $8.00 | $10.00 | $15.00 | $8.40 | $7.85 |
| 0073 | Reinforcing steel-roadway (grade 60) (804003) | LB | 5,196 | $2.40 | $2.00 | $2.55 | $2.63 | $3.35 |
| 0074 | Reinforcing steel-bridge (grade 60) (804013) | LB | 6,100 | $2.55 | $2.50 | $2.55 | $2.62 | $2.55 |
| 0075 | Epoxy coated reinforcing steel (grade 60) (804023) | LB | 41,610 | $2.20 | $1.85 | $2.55 | $2.08 | $1.97 |
| 0076 | Steel shell piling (18" diameter) (805124) | LF | 370 | $280.00 | $250.00 | $345.00 | $281.27 | $236.38 |
| 0077 | Steel shell piling (24" diameter) (805127) | LF | 272 | $375.00 | $405.00 | $385.00 | $379.81 | $410.29 |
| 0078 | Preboring (805504) | LF | 476 | $490.00 | $390.00 | $810.00 | $383.07 | $460.61 |
| 0079 | Pile encasement (805513) | LF | 72 | $250.00 | $270.00 | $255.00 | $536.76 | $350.83 |
| 0080 | Structural steel in beam spans (A709, GR. 50W) (807017) | LB | 67,650 | $3.60 | $4.50 | $4.55 | $5.24 | $4.51 |
| 0081 | Painting structural steel (807301) | TON | 10.60 | $1,700.00 | $1,700.00 | $12,500 | $1,785.00 | $2,521.10 |
| 0082 | Bridge name plate (type D) (812004) | EACH | 1 | $1,000.00 | $500.00 | $4,500.00 | $961.69 | $3,000.00 |
| 0083 | Filter blanket (816003) | SY | 1,394 | $3.80 | $5.00 | $6.00 | $6.17 | $5.35 |
| 0084 | Dumped riprap (816111) | CY | 728 | $80.00 | $70.00 | $75.00 | $83.31 | $140.97 |
| 0085 | 24" reinforced concrete pipe culverts (class III) (605606) | LF | 83 | $130.00 | ||||
| 0087 | 24" aluminum coated corrugated steel pipe culverts (16 gauge) (605706) | LF | 89 | $100.00 | $125.00 | $135.39 | $163.48 | |
| 0092 | 24" flared end sections for reinforced concrete pipe culverts (605858) | EACH | 2 | $2,200.00 | ||||
| 0093 | 24" flared end sections for corrugated steel pipe culverts (605859) | EACH | 2 | $1,300.00 | $600.00 | $1,751.67 | $840.00 | |
| 0094 | 16' steel gates (619332) | EACH | 2 | $800.00 | $800.00 | $1,000.00 | $840.00 | $1,020.00 |
| 0096 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $163,000 | $165,000 | $194,000 | $204,739 | $261,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way