ARDOT contract A50052 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 5.996 MILES OF HIGHWAY 14 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE ISLANDS, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 4, 2026, Independence. 2 bids received; low bid $1,628,560 by Atlas Asphalt, Inc..

Owner
Arkansas DOT
Letting
04 NOV 2026
Pay items
19
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Atlas Asphalt, Inc.$1,628,560Low
2CK Asphalt, LLC$1,777,381+9.0%
ARDOT contract A50052: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Atlas Asphalt, Inc.2. CK Asphalt, LLC
0001Removal and disposal of concrete islands (202047)SY55$80.12$100.00
0002Aggregate base course (class 7) (303117)TON2,944$27.18$29.50
0003Tack coat (401011)GAL12,152$3.65$1.00
0004Mineral aggregate in achm surface course (3/8") (407161)TON12,934$91.40$38.81
0005Asphalt binder (PG 70-22) in achm surface course (3/8") (minimum bid $120.00) (407441)TON826$120.00$1,060.00
0006Cold milling asphalt pavement (412002)SY17,793$1.41$2.25
0007Achm patching of existing roadway (415011)TON250$100.00$155.00
0008Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$22,820$34,850
0009Maintenance of traffic (603009)LS1$11,443$42,000
0010Signs (604003)SF456$8.00$8.00
0011Construction pavement markings (604041)LF63,318$0.24$0.24
0012Roadway construction control (635011)LS1$4,242.93$5,500.00
0013Reflectorized paint pavement marking white (10") (718004)LF525$4.00$4.00
0014Thermoplastic pavement marking white (6") (719002)LF63,912$0.82$0.85
0015Thermoplastic pavement marking white (24") (719006)LF15$24.00$28.00
0016Thermoplastic pavement marking yellow (6") (719102)LF63,318$0.82$0.85
0017Thermoplastic pavement marking (yield line) (719200)LF40$15.00$15.00
0018Thermoplastic pavement marking (words) (719201)EACH2$290.00$290.00
0019Raised pavement markers (type II) (721002)EACH441$7.00$8.00
ARDOT contract A50052: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of November 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy