Richard Baughn Construction, Inc.: ARDOT bid record

Richard Baughn Construction, Inc. submitted 23 bids on Arkansas DOT contracts in the data, from 22 MAY 2024 to 20 MAY 2026, and was the low bidder on 2 of them (9%). When it was not low, its total sat a median +27% above the low bid.

Owner
Arkansas DOT
Low bid volume
$5,280,249
Latest bid
20 MAY 2026
Data through
04 NOV 2026
23Bids
2Low bids
9Win rate, percent
+27%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
2024200%
20251119%
202610110%
Richard Baughn Construction, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Craighead500%
Randolph4125%
Jackson300%
Lawrence3133%
Cross200%
Clay200%
Conway100%
Poinsett100%
Craighead, Jackson100%
Craighead, Greene100%
Richard Baughn Construction, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Achm patching of existing roadway415011TON169 (56%)$114.55$250.00
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON128 (67%)$120.00$120.00
Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00)407431TON88 (100%)$120.00$120.00
Aggregate base course (class 7)303117TON156 (40%)$42.80$52.19
Tack coat401011GAL195 (26%)$3.40$3.75
Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00)406402TON85 (63%)$120.00$126.00
Signs604003SF234 (17%)$8.25$8.40
Water620030MGAL94 (44%)$10.00$10.00
Temporary seeding621001ACRE74 (57%)$750.00$805.89
Cold milling asphalt pavement412002SY123 (25%)$4.45$8.00
Silt fence621021LF93 (33%)$3.52$3.68
Sediment removal and disposal621111CY83 (38%)$5.00$18.14
Richard Baughn Construction, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Richard Baughn Construction, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
20 MAY 2026SA3859LawrenceTHE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.00 MILE OF COUNTY ROAD 504 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE 1 of 5$139,834Low, 17% under the second
20 MAY 2026SA3860LawrenceTHE PURPOSE OF THIS PROJECT IS TO SEAL APPROXIMATELY 0.70 MILE AND SURFACE 0.80 MILE OF COUNTY ROAD 529 IN LAWRENCE COUNTY. THIS PROJECT CON2 of 3$200,376+10%
08 APR 2026A00093ClayTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.921 MILES OF HIGHWAY 62 IN CLAY COUN4 of 4$8,009,240+64%
04 MAR 2026A00096Craighead, GreeneTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.283 MILES OF HIGHWAY 141 IN CRAIGHEAD AND GREENE COUNTIES. THIS PROJECT CONSISTS 3 of 4$5,291,544+33%
21 JAN 2026A00091PoinsettTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.899 MILES OF HIGHWAY 1 IN POINSETT COUNTY. THIS PROJECT CONSISTS OF ACHM 4 of 4$2,365,759+98%
21 JAN 2026C19007CrossTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 0.97 MILE OF VARIOUS CITY STREETS IN THE CITY OF CHERRY VALLEY AND 1.63 2 of 5$467,033+3.0%
21 JAN 2026C38015LawrenceTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.52 MILES OF VARIOUS CITY STREETS IN THE CITY OF STRAWBERRY, LOCATED IN LAWRENCE CO3 of 4$218,972+28%
21 JAN 2026C76093Craighead, JacksonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.55 MILES OF VARIOUS CITY STREETS IN THE CITY OF AMAGON IN JACKSON COUN2 of 5$371,308+2.0%
21 JAN 2026FA1108ClayTHE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT 6 of 7$3,723,108+25%
21 JAN 2026SA6146RandolphTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF CO. RDS. 2 AND 16 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF AGGREGA2 of 5$267,804+7.0%
05 NOV 2025A50048JacksonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.776 MILES OF HIGHWAY 367 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF REMO5 of 5$7,053,890+64%
05 NOV 2025101091CraigheadTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R3 of 3$1,850,135+73%
05 NOV 2025A00077CraigheadTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 2.053 MILES OF HIGHWAY 141 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF R2 of 4$636,031+1.0%
05 NOV 2025A00094RandolphTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 11.802 MILES OF HIGHWAYS 93 AND 231 IN RANDOLPH COUNTY. THIS PROJECT CONSI1 of 4$5,140,415Low, 3.0% under the second
25 JUN 2025100879CraigheadTHE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT PARKER ROAD AND HIGHWAY 49 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEAR4 of 4$8,870,484+48%
26 FEB 2025101234RandolphTHE PURPOSE OF THE IS PROJECT IS TO CONSTRUCT FULL DEPTH SHOULDERS AND STRIPING TO INCLUDE A CENTER TURN LANE ON HIGHWAY 67 IN POCAHONTAS IN4 of 4$1,173,984+115%
26 FEB 2025SA6145RandolphTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.40 MILES OF COUNTY ROAD 275 IN RANDOLH COUNTY. THIS PROJECT CONSISTS OF AGGREGATE 4 of 5$422,765+35%
15 JAN 2025A00072CraigheadTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.124 MILES OF HIGHWAY 18 IN JONESBORO IN CRAIGHEAD COUNTY. THIS PROJECT CO3 of 3$2,956,751+46%
15 JAN 2025C34011JacksonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF VARIOUS CITY STREETS IN THE CITY OF CAMPBELL STATION IN JACKSON COUNTY5 of 6$286,469+13%
15 JAN 2025SA1940CrossTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.43 MILES OF COUNTY ROAD 96 IN CROSS COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS3 of 6$437,021+8.0%
15 JAN 2025SA3465JacksonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.20 MILES OF COUNTY ROAD 7 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA4 of 7$376,505+23%
06 NOV 2024A00059CraigheadTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH 2' SHOULDERS ON APPROXIMATELY 4.668 MILES OF HIGHWAY 91 IN CRAIGHEAD COUNTY. THIS P4 of 4$1,394,770+27%
22 MAY 2024080711ConwayTHE PURPOSE OF THIS PROJECT IS TO RELOCATE APPROXIMATELY 2.367 MILES OF HIGHWAY 113 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND D5 of 5$10,346,478+7.0%
Richard Baughn Construction, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy