Richard Baughn Construction, Inc.: ARDOT bid record
Richard Baughn Construction, Inc. submitted 23 bids on Arkansas DOT contracts in the data, from 22 MAY 2024 to 20 MAY 2026, and was the low bidder on 2 of them (9%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $5,280,249
- Latest bid
- 20 MAY 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 2 | 0 | 0% |
| 2025 | 11 | 1 | 9% |
| 2026 | 10 | 1 | 10% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Craighead | 5 | 0 | 0% |
| Randolph | 4 | 1 | 25% |
| Jackson | 3 | 0 | 0% |
| Lawrence | 3 | 1 | 33% |
| Cross | 2 | 0 | 0% |
| Clay | 2 | 0 | 0% |
| Conway | 1 | 0 | 0% |
| Poinsett | 1 | 0 | 0% |
| Craighead, Jackson | 1 | 0 | 0% |
| Craighead, Greene | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Achm patching of existing roadway | 415011 | TON | 16 | 9 (56%) | $114.55 | $250.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 12 | 8 (67%) | $120.00 | $120.00 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 8 | 8 (100%) | $120.00 | $120.00 |
| Aggregate base course (class 7) | 303117 | TON | 15 | 6 (40%) | $42.80 | $52.19 |
| Tack coat | 401011 | GAL | 19 | 5 (26%) | $3.40 | $3.75 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 8 | 5 (63%) | $120.00 | $126.00 |
| Signs | 604003 | SF | 23 | 4 (17%) | $8.25 | $8.40 |
| Water | 620030 | MGAL | 9 | 4 (44%) | $10.00 | $10.00 |
| Temporary seeding | 621001 | ACRE | 7 | 4 (57%) | $750.00 | $805.89 |
| Cold milling asphalt pavement | 412002 | SY | 12 | 3 (25%) | $4.45 | $8.00 |
| Silt fence | 621021 | LF | 9 | 3 (33%) | $3.52 | $3.68 |
| Sediment removal and disposal | 621111 | CY | 8 | 3 (38%) | $5.00 | $18.14 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Atlas Asphalt, Inc. | 19 | 16 of 19 |
| Delta Asphalt of Arkansas, Inc. | 18 | 7 of 18 |
| Rogers Group, Inc. | 14 | 9 of 14 |
| Sugg Construction, Inc. | 9 | 4 of 9 |
| Michelle'S Excavating, Inc. | 5 | 4 of 5 |
| CK Asphalt, LLC | 2 | 1 of 2 |
| White River Materials, Inc. | 2 | 2 of 2 |
| Robertson Contractors, Inc. | 2 | 2 of 2 |
| McGeorge Contracting Co., Inc. | 1 | 1 of 1 |
| Capital Paving & Construction, LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 MAY 2026 | SA3859 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.00 MILE OF COUNTY ROAD 504 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 1 of 5 | $139,834 | Low, 17% under the second |
| 20 MAY 2026 | SA3860 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO SEAL APPROXIMATELY 0.70 MILE AND SURFACE 0.80 MILE OF COUNTY ROAD 529 IN LAWRENCE COUNTY. THIS PROJECT CON | 2 of 3 | $200,376 | +10% |
| 08 APR 2026 | A00093 | Clay | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.921 MILES OF HIGHWAY 62 IN CLAY COUN | 4 of 4 | $8,009,240 | +64% |
| 04 MAR 2026 | A00096 | Craighead, Greene | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.283 MILES OF HIGHWAY 141 IN CRAIGHEAD AND GREENE COUNTIES. THIS PROJECT CONSISTS | 3 of 4 | $5,291,544 | +33% |
| 21 JAN 2026 | A00091 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.899 MILES OF HIGHWAY 1 IN POINSETT COUNTY. THIS PROJECT CONSISTS OF ACHM | 4 of 4 | $2,365,759 | +98% |
| 21 JAN 2026 | C19007 | Cross | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 0.97 MILE OF VARIOUS CITY STREETS IN THE CITY OF CHERRY VALLEY AND 1.63 | 2 of 5 | $467,033 | +3.0% |
| 21 JAN 2026 | C38015 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.52 MILES OF VARIOUS CITY STREETS IN THE CITY OF STRAWBERRY, LOCATED IN LAWRENCE CO | 3 of 4 | $218,972 | +28% |
| 21 JAN 2026 | C76093 | Craighead, Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.55 MILES OF VARIOUS CITY STREETS IN THE CITY OF AMAGON IN JACKSON COUN | 2 of 5 | $371,308 | +2.0% |
| 21 JAN 2026 | FA1108 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT | 6 of 7 | $3,723,108 | +25% |
| 21 JAN 2026 | SA6146 | Randolph | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF CO. RDS. 2 AND 16 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF AGGREGA | 2 of 5 | $267,804 | +7.0% |
| 05 NOV 2025 | A50048 | Jackson | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.776 MILES OF HIGHWAY 367 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF REMO | 5 of 5 | $7,053,890 | +64% |
| 05 NOV 2025 | 101091 | Craighead | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 3 of 3 | $1,850,135 | +73% |
| 05 NOV 2025 | A00077 | Craighead | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 2.053 MILES OF HIGHWAY 141 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF R | 2 of 4 | $636,031 | +1.0% |
| 05 NOV 2025 | A00094 | Randolph | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 11.802 MILES OF HIGHWAYS 93 AND 231 IN RANDOLPH COUNTY. THIS PROJECT CONSI | 1 of 4 | $5,140,415 | Low, 3.0% under the second |
| 25 JUN 2025 | 100879 | Craighead | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT PARKER ROAD AND HIGHWAY 49 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEAR | 4 of 4 | $8,870,484 | +48% |
| 26 FEB 2025 | 101234 | Randolph | THE PURPOSE OF THE IS PROJECT IS TO CONSTRUCT FULL DEPTH SHOULDERS AND STRIPING TO INCLUDE A CENTER TURN LANE ON HIGHWAY 67 IN POCAHONTAS IN | 4 of 4 | $1,173,984 | +115% |
| 26 FEB 2025 | SA6145 | Randolph | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.40 MILES OF COUNTY ROAD 275 IN RANDOLH COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 4 of 5 | $422,765 | +35% |
| 15 JAN 2025 | A00072 | Craighead | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.124 MILES OF HIGHWAY 18 IN JONESBORO IN CRAIGHEAD COUNTY. THIS PROJECT CO | 3 of 3 | $2,956,751 | +46% |
| 15 JAN 2025 | C34011 | Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF VARIOUS CITY STREETS IN THE CITY OF CAMPBELL STATION IN JACKSON COUNTY | 5 of 6 | $286,469 | +13% |
| 15 JAN 2025 | SA1940 | Cross | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.43 MILES OF COUNTY ROAD 96 IN CROSS COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 3 of 6 | $437,021 | +8.0% |
| 15 JAN 2025 | SA3465 | Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.20 MILES OF COUNTY ROAD 7 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA | 4 of 7 | $376,505 | +23% |
| 06 NOV 2024 | A00059 | Craighead | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH 2' SHOULDERS ON APPROXIMATELY 4.668 MILES OF HIGHWAY 91 IN CRAIGHEAD COUNTY. THIS P | 4 of 4 | $1,394,770 | +27% |
| 22 MAY 2024 | 080711 | Conway | THE PURPOSE OF THIS PROJECT IS TO RELOCATE APPROXIMATELY 2.367 MILES OF HIGHWAY 113 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND D | 5 of 5 | $10,346,478 | +7.0% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.