ARDOT contract A50048 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.776 MILES OF HIGHWAY 367 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, PORTLAND CEMENT CONCRETE BASE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, APPROACH SLABS AND GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL ITEMS, MODIFICATION OF EXISTING BACKWALLS, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 5, 2025, Jackson. 5 bids received; low bid $4,294,590 by Atlas Asphalt, Inc..

Owner
Arkansas DOT
Letting
05 NOV 2025
Pay items
36
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Atlas Asphalt, Inc.$4,294,590Low
2Rogers Group, Inc.$4,567,306+6.0%
3CK Asphalt, LLC$5,008,292+17%
4Delta Asphalt of Arkansas, Inc.$5,162,905+20%
5Richard Baughn Construction, Inc.$7,053,890+64%
ARDOT contract A50048: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Atlas Asphalt, Inc.2. Rogers Group, Inc.3. CK Asphalt, LLC4. Delta Asphalt of Arkansas, Inc.5. Richard Baughn Construction, Inc.
0001Removal and disposal of approach slabs (202051)EACH16$5,000.00$5,442.00$5,000.00$14,442$15,000
0002Removal and disposal of guardrail (202132)LF2,370$7.75$8.00$6.00$7.75$15.40
0003Flowable select material (206021)CY270$300.00$325.00$300.00$121.47$360.00
0004Stone backfill (207011)TON7,020$50.77$52.00$45.20$43.74$58.00
0005Unclassified excavation (210213)CY1,305$33.07$65.00$34.53$22.17$10.00
0006Compacted embankment (210611)CY580$17.96$67.00$23.10$24.75$28.00
0007Aggregate base course (class 7) (303117)TON4,979$30.71$42.00$32.20$45.31$46.00
0008Portland cement concrete base (6" uniform thickness) (309506)SY11,700$67.39$34.00$109.00$23.09$141.25
0009Tack coat (401011)GAL19,040$0.01$1.00$0.01$0.01$3.20
0010Mineral aggregate in achm surface course (3/8") (407161)TON11,765$84.70$77.45$98.60$131.72$108.26
0011Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON15$120.00$637.00$120.00$120.00$120.00
0012Asphalt binder (PG 70-22) in achm surface course (3/8") (minimum bid $120.00) (407441)TON776$120.00$733.00$120.00$120.00$120.00
0013Cold milling asphalt pavement (412002)SY106,332$1.02$1.25$2.10$1.86$1.69
0014Approach slabs (504031)CY436.16$900.00$980.00$1,000.00$1,470.89$1,617.00
0015Approach gutters (504264)CY142.40$2,000.00$2,200.00$2,000.00$3,090.52$3,399.00
0016Maintenance of traffic (603010)LS1$169,301$97,000$39,000$175,000$500,000
0017Signs (604003)SF1,094$6.00$8.20$6.00$6.00$9.00
0018Barricades (604013)LF32$25.00$31.00$25.00$25.00$30.00
0019Construction pavement markings (604041)LF70,935$0.16$0.16$0.16$0.16$0.15
0020Guardrail (type A) (617005)LF3,300$30.00$31.00$30.00$30.00$35.75
0021Guardrail terminal (type 2) (617312)EACH29$3,100.00$3,200.00$3,100.00$3,100.00$3,450.00
0022Thrie beam guardrail terminal (617332)EACH29$2,100.00$2,155.00$2,100.00$2,100.00$3,200.00
0023Lime (620001)TON4$100.00$105.00$100.00$100.00$3,520.00
0024Seeding (620011)ACRE2$1,350.00$1,380.00$1,350.00$1,350.00$1,450.00
0025Mulch cover (620022)ACRE2$1,050.00$1,075.00$1,050.00$1,050.00$1,200.00
0026Water (620030)MGAL204$10.00$10.25$10.00$10.00$10.00
0027Silt fence (621021)LF500$4.00$4.25$4.00$4.00$4.00
0028Rock ditch checks (621151)CY48$65.76$65.00$55.00$108.46$95.00
0029Filter sock (12") (621168)LF500$7.76$8.26$7.76$7.76$8.00
0030Thermoplastic pavement marking white (6") (719002)LF70,935$0.50$0.64$0.70$0.50$0.59
0031Thermoplastic pavement marking yellow (6") (719102)LF70,935$0.70$0.64$0.50$0.70$0.59
0032Raised pavement markers (type II) (721002)EACH440$4.50$5.40$4.50$4.50$5.00
0033Bridge end terminal (734011)EACH3$28,000$29,000$28,000$28,000$30,500
0034Reinforcing steel-roadway (grade 60) (804003)LB14,304$3.00$3.20$3.00$3.00$3.00
0035Modification of existing backwalls (912543)EACH6$15,000$16,333$15,000$44,419$34,000
0036Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$128,362$179,000$195,000$168,000$275,000
ARDOT contract A50048: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of November 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy