ARDOT contract 101234 bid tabulation
THE PURPOSE OF THE IS PROJECT IS TO CONSTRUCT FULL DEPTH SHOULDERS AND STRIPING TO INCLUDE A CENTER TURN LANE ON HIGHWAY 67 IN POCAHONTAS IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, AGGREGATE BASE COURSE, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, PORTLAND CEMENT CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, EROSION CONTROL, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Randolph. 4 bids received; low bid $546,313 by Atlas Asphalt, Inc..
- Owner
- Arkansas DOT
- Letting
- 26 FEB 2025
- Pay items
- 29
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Atlas Asphalt, Inc. | $546,313 | Low |
| 2 | Delta Asphalt of Arkansas, Inc. | $771,802 | +41% |
| 3 | Rogers Group, Inc. | $842,557 | +54% |
| 4 | Richard Baughn Construction, Inc. | $1,173,984 | +115% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Atlas Asphalt, Inc. | 2. Delta Asphalt of Arkansas, Inc. | 3. Rogers Group, Inc. | 4. Richard Baughn Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Unclassified excavation (210213) | CY | 1,695 | $18.04 | $18.57 | $35.00 | $50.00 |
| 0002 | Aggregate base course (class 7) (303117) | TON | 897 | $28.35 | $36.91 | $72.00 | $90.00 |
| 0003 | Tack coat (401011) | GAL | 2,769 | $3.50 | $4.45 | $1.00 | $3.65 |
| 0004 | Mineral aggregate in achm base course (1 1/2") (405161) | TON | 984 | $86.39 | $114.95 | $95.00 | $244.00 |
| 0005 | Asphalt binder (PG 64-22) in achm base course (1 1/2") (minimum bid $120.00) (405402) | TON | 38 | $120.00 | $120.00 | $600.00 | $120.00 |
| 0006 | Mineral aggregate in achm binder course (1") (406161) | TON | 576 | $88.26 | $121.95 | $105.00 | $216.33 |
| 0007 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 25 | $120.00 | $120.00 | $600.00 | $120.00 |
| 0008 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 2,218 | $93.84 | $129.10 | $113.00 | $164.72 |
| 0009 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 124 | $120.00 | $120.00 | $600.00 | $120.00 |
| 0010 | Cold milling asphalt pavement (412002) | SY | 533 | $10.02 | $28.71 | $13.00 | $45.33 |
| 0011 | Portland cement concrete driveway (505011) | SY | 35.56 | $350.85 | $483.64 | $570.00 | $188.00 |
| 0012 | Maintenance of traffic (603009) | LS | 1 | $27,327 | $29,000 | $50,000 | $75,000 |
| 0013 | Signs (604003) | SF | 240 | $6.00 | $8.00 | $8.50 | $12.00 |
| 0014 | Traffic drums (604023) | EACH | 134 | $23.00 | $25.00 | $27.00 | $33.00 |
| 0015 | Vertical panels (604083) | EACH | 50 | $23.00 | $40.00 | $43.00 | $48.00 |
| 0016 | Silt fence (621021) | LF | 5,650 | $1.21 | $4.50 | $5.00 | $4.84 |
| 0017 | Sediment removal and disposal (621111) | CY | 215 | $1.01 | $93.70 | $50.00 | $2.00 |
| 0018 | Rock ditch checks (621151) | CY | 18 | $64.01 | $140.64 | $150.00 | $140.00 |
| 0019 | Roadway construction control (635001) | LS | 1 | $9,663.03 | $20,000 | $10,000 | $30,000 |
| 0020 | Mailboxes (637001) | EACH | 3 | $289.52 | $50.00 | $55.00 | $275.00 |
| 0021 | Mailbox supports (single) (637017) | EACH | 3 | $289.52 | $185.00 | $200.00 | $275.00 |
| 0022 | Rumble stripes in asphalt shoulders (642011) | LF | 3,045 | $0.83 | $4.08 | $0.90 | $3.00 |
| 0023 | Thermoplastic pavement marking white (6") (719002) | LF | 5,020 | $1.50 | $1.50 | $1.50 | $1.60 |
| 0024 | Thermoplastic pavement marking white (12") (719005) | LF | 15 | $12.00 | $12.00 | $13.00 | $4.00 |
| 0025 | Thermoplastic pavement marking yellow (6") (719102) | LF | 6,506 | $1.50 | $1.50 | $1.50 | $1.60 |
| 0026 | Thermoplastic pavement marking (words) (719201) | EACH | 1 | $275.00 | $275.00 | $300.00 | $315.00 |
| 0027 | Thermoplastic pavement marking (arrows) (719202) | EACH | 2 | $290.00 | $290.00 | $315.00 | $300.00 |
| 0028 | Raised pavement markers (type II) (721002) | EACH | 54 | $8.00 | $8.00 | $8.50 | $90.00 |
| 0029 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $22,486 | $34,000 | $40,000 | $35,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.