ARDOT contract A80050 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.159 MILES OF HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 4, 2026, Van Buren. 3 bids received; low bid $4,945,792 by CK Asphalt, LLC.
- Owner
- Arkansas DOT
- Letting
- 04 NOV 2026
- Pay items
- 22
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | CK Asphalt, LLC | $4,945,792 | Low |
| 2 | Rogers Group, Inc. | $5,169,623 | +5.0% |
| 3 | Atlas Asphalt, Inc. | $5,778,564 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. CK Asphalt, LLC | 2. Rogers Group, Inc. | 3. Atlas Asphalt, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Aggregate surface course (class D-8) (303308) | TON | 400 | $28.50 | $44.00 | $37.15 |
| 0002 | Tack coat (401011) | GAL | 23,708 | $1.00 | $1.00 | $0.01 |
| 0003 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 24,268 | $93.38 | $60.00 | $118.25 |
| 0004 | Asphalt binder (PG 76-22) in achm surface course (1/2") (minimum bid $120.00) (407452) | TON | 1,494 | $120.00 | $805.00 | $120.00 |
| 0005 | Ultrathin bonded wearing course (3/4"-type C) (407904) | TON | 12,118 | $115.60 | $107.00 | $129.20 |
| 0006 | Cold milling asphalt pavement (412002) | SY | 239,776 | $1.80 | $1.05 | $2.28 |
| 0007 | Achm patching of existing roadway (415011) | TON | 400 | $155.00 | $175.00 | $125.00 |
| 0008 | Maintenance of traffic (603009) | LS | 1 | $68,500 | $200,000 | $109,219 |
| 0009 | Signs (604003) | SF | 791 | $16.00 | $17.50 | $16.00 |
| 0010 | Construction pavement markings (604041) | LF | 313,484 | $0.35 | $0.30 | $0.30 |
| 0011 | Construction pavement markings (words) (604045) | EACH | 13 | $100.00 | $110.00 | $100.00 |
| 0012 | Construction pavement markings (arrows) (604046) | EACH | 11 | $80.00 | $85.00 | $80.00 |
| 0013 | Roadway construction control (635011) | LS | 1 | $12,500 | $15,000 | $5,816.05 |
| 0014 | Rumble strips in asphalt shoulders (642001) | LF | 101,587 | $0.20 | $0.12 | $0.06 |
| 0015 | Thermoplastic pavement marking white (6") (719002) | LF | 138,673 | $0.64 | $0.70 | $0.64 |
| 0016 | Thermoplastic pavement marking white (24") (719006) | LF | 1,230 | $14.40 | $16.00 | $14.40 |
| 0017 | Thermoplastic pavement marking yellow (6") (719102) | LF | 174,811 | $0.64 | $0.70 | $0.64 |
| 0018 | Thermoplastic pavement marking (words) (719201) | EACH | 13 | $280.00 | $310.00 | $280.00 |
| 0019 | Thermoplastic pavement marking (arrows) (719202) | EACH | 11 | $220.00 | $240.00 | $220.00 |
| 0020 | Thermoplastic pavement marking (yield line) (719210) | LF | 18 | $20.00 | $22.00 | $20.00 |
| 0021 | Raised pavement markers (type II) (721002) | EACH | 5,247 | $4.80 | $5.25 | $4.80 |
| 0022 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $95,000 | $240,000 | $72,202 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of November 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.