ARDOT contract SA6949 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO SURFACE 0.18 MILE OF HERPEL ROAD IN STONE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, RECONSTRUCTED BASE COURSE, ACHM SURFACE COURSE, COLD MILLING, PAVEMENT MARKINGS, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on September 23, 2026, Stone. 1 bid received; low bid $138,633 by Atlas Asphalt, Inc..

Owner
Arkansas DOT
Letting
23 SEP 2026
Pay items
17
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Atlas Asphalt, Inc.$138,633Low
ARDOT contract SA6949: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Atlas Asphalt, Inc.
0001Aggregate base course (class 7) (303117)TON29$68.69
0002Reconstructed base course (305001)STA10$782.59
0003Tack coat (401011)GAL23$4.00
0004Mineral aggregate in achm surface course (1/2") (407162)TON599$150.71
0005Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON38$120.00
0006Cold milling asphalt pavement (412002)SY437$20.00
0007Maintenance of traffic (603009)LS1$9,091.68
0008Signs (604003)SF212$10.00
0009Barricades (604013)LF32$20.00
0010Reflectorized paint pavement marking white (4") (718001)LF274$2.00
0011Reflectorized paint pavement marking white (24") (718006)LF27$5.00
0012Reflectorized paint pavement marking yellow (4") (718101)LF2,036$2.00
0013Reflectorized paint pavement marking (words) (718201)EACH1$300.00
0014Reflectorized paint pavement marking (yield line) (718206)LF14$10.00
0015Standard sign (726002)SF56.70$30.00
0016Channel post sign support (type A) (729001)EACH9$100.00
0017Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$5,500.00
ARDOT contract SA6949: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of September 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy