ARDOT contract A00103 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 4.858 MILES OF HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF FOG SEAL, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 4, 2026, Craighead. 3 bids received; low bid $1,150,126 by Atlas Asphalt, Inc..
- Owner
- Arkansas DOT
- Letting
- 04 NOV 2026
- Pay items
- 16
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Atlas Asphalt, Inc. | $1,150,126 | Low |
| 2 | Rogers Group, Inc. | $1,330,277 | +16% |
| 3 | Delta Asphalt of Arkansas, Inc. | $1,388,633 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Atlas Asphalt, Inc. | 2. Rogers Group, Inc. | 3. Delta Asphalt of Arkansas, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Fog seal (type 4) (401007) | GAL | 4,275 | $4.54 | $5.00 | $4.00 |
| 0002 | Ultrathin bonded wearing course (3/4"-type C) (407904) | TON | 7,317 | $127.84 | $137.00 | $153.25 |
| 0003 | Cold milling asphalt pavement (412002) | SY | 2,524 | $5.33 | $8.00 | $8.25 |
| 0004 | Achm patching of existing roadway (415011) | TON | 20 | $125.00 | $200.00 | $190.00 |
| 0005 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $20,504 | $61,000 | $28,000 |
| 0006 | Maintenance of traffic (603009) | LS | 1 | $1,596.77 | $40,000 | $35,000 |
| 0007 | Signs (604003) | SF | 551 | $14.40 | $20.00 | $6.50 |
| 0008 | Construction pavement markings (604041) | LF | 116,988 | $0.20 | $0.22 | $0.26 |
| 0009 | Roadway construction control (635011) | LS | 1 | $4,017.07 | $15,000 | $5,000.00 |
| 0010 | Rumble strips in asphalt shoulders (642001) | LF | 35,548 | $0.16 | $0.16 | $0.15 |
| 0011 | Centerline rumble stripes in asphalt roadways (642102) | LF | 50,401 | $0.18 | $0.16 | $0.16 |
| 0012 | Thermoplastic pavement marking white (6") (719002) | LF | 53,747 | $0.88 | $0.95 | $0.84 |
| 0013 | Thermoplastic pavement marking yellow (6") (719102) | LF | 63,241 | $0.80 | $0.85 | $0.84 |
| 0014 | Thermoplastic pavement marking (words) (719201) | EACH | 4 | $280.00 | $300.00 | $295.00 |
| 0015 | Thermoplastic pavement marking (arrows) (719202) | EACH | 4 | $240.00 | $260.00 | $280.00 |
| 0016 | Raised pavement markers (type II) (721002) | EACH | 1,282 | $5.60 | $6.80 | $7.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of November 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.