ARDOT contract A40042 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.505 MILES OF HIGHWAYS 64 AND 162 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Crawford. 3 bids received; low bid $2,381,285 by Robinson Construction, LLC.

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
18
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Robinson Construction, LLC$2,381,285Low
2Emery Sapp & Sons, Inc.$2,433,560+2.0%
3Forsgren, Inc.$2,617,345+10%
ARDOT contract A40042: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Robinson Construction, LLC2. Emery Sapp & Sons, Inc.3. Forsgren, Inc.
0001Tack coat (401011)GAL22,511$4.00$3.37$3.50
0002Mineral aggregate in achm surface course (1/2") (407162)TON13,646$104.85$125.65$128.50
0003Asphalt binder (PG 76-22) in achm surface course (1/2") (minimum bid $120.00) (407452)TON825$120.00$120.00$120.00
0004Cold milling asphalt pavement (412002)SY113,369$4.65$2.11$2.90
0005Asphalt concrete patching for maintenance of traffic (414011)TON100$135.00$75.00$190.00
0006Achm patching of existing roadway (415011)TON500$120.00$184.48$205.00
0007Maintenance of traffic (603010)LS1$24,000$57,000$60,000
0008Signs (604003)SF1,500$4.15$4.75$6.30
0009Construction pavement markings (604041)LF60,000$0.32$0.36$0.36
0010Construction pavement markings (words) (604045)EACH10$115.00$130.52$79.00
0011Construction pavement markings (arrows) (604046)EACH10$115.00$118.66$53.00
0012Thermoplastic pavement marking white (6") (719002)LF26,500$0.75$0.83$0.68
0013Thermoplastic pavement marking white (12") (719005)LF750$11.00$11.87$3.70
0014Thermoplastic pavement marking yellow (6") (719102)LF33,000$0.73$0.83$0.68
0015Thermoplastic pavement marking (words) (719201)EACH10$294.00$338.17$315.00
0016Thermoplastic pavement marking (arrows) (719202)EACH10$290.00$326.30$290.00
0017Raised pavement markers (type II) (721002)EACH1,200$3.51$4.15$7.35
0018Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$46,800$47,000$85,300
ARDOT contract A40042: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy