ARDOT contract A40048 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.674 MILES OF HIGHWAYS 23, 64, AND 219 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, MUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 5, 2025, Franklin. 5 bids received; low bid $3,641,446 by Blackstone Construction, LLC.

Owner
Arkansas DOT
Letting
05 NOV 2025
Pay items
23
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blackstone Construction, LLC$3,641,446Low
2Emery Sapp & Sons, Inc.$3,976,119+9.0%
3Forsgren, Inc.$4,186,393+15%
4Apac-Central, Inc.$4,378,010+20%
5Robinson Construction, LLC$5,077,819+39%
ARDOT contract A40048: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blackstone Construction, LLC2. Emery Sapp & Sons, Inc.3. Forsgren, Inc.4. Apac-Central, Inc.5. Robinson Construction, LLC
0001Aggregate base course (class 7) (303117)TON450$43.35$45.78$41.00$55.00$55.00
0002Tack coat (401011)GAL40,847$0.01$3.20$3.00$3.10$4.10
0003Mineral aggregate in achm surface course (1/2") (407162)TON24,669$98.55$114.26$110.25$117.25$128.00
0004Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON30$120.00$120.00$120.00$120.00$120.00
0005Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON1,572$120.00$120.00$120.00$120.00$120.00
0006Cold milling asphalt pavement (412002)SY219,099$1.50$1.25$2.15$2.21$2.55
0007Asphalt concrete patching for maintenance of traffic (414011)TON300$150.00$159.73$200.00$150.00$254.00
0008Achm patching of existing roadway (415011)TON1,000$185.00$118.03$150.00$150.00$265.00
0009Maintenance of traffic (603010)LS1$45,000$52,731$80,000$48,500$55,000
0010Signs (604003)SF2,580$10.00$11.11$10.40$10.50$13.35
0011Traffic drums (604023)EACH50$60.00$66.76$62.40$63.00$78.00
0012Construction pavement markings (604041)LF235,000$0.18$0.20$0.19$0.19$0.26
0013Construction pavement markings (words) (604045)EACH2$150.00$166.76$156.00$158.00$195.00
0014Mumble strips in asphalt shoulders (642301)LF34,436$0.35$0.28$0.28$0.26$0.33
0015Centerline mumble stripes in asphalt roadways (642402)LF31,812$0.35$0.28$0.29$0.26$0.35
0016Reflectorized paint pavement marking white (6") (718002)LF500$0.75$0.83$0.78$0.79$0.98
0017Reflectorized paint pavement marking yellow (6") (718102)LF450$0.75$0.83$0.78$0.79$0.98
0018Thermoplastic pavement marking white (6") (719002)LF107,000$0.75$0.83$0.78$0.79$0.98
0019Thermoplastic pavement marking white (12") (719005)LF700$5.00$5.56$5.20$5.25$5.98
0020Thermoplastic pavement marking yellow (6") (719102)LF107,000$0.75$0.83$0.78$0.79$0.92
0021Thermoplastic pavement marking (words) (719201)EACH2$400.00$444.42$416.00$420.00$520.00
0022Raised pavement markers (type II) (721002)EACH1,030$6.00$6.67$6.24$6.30$7.80
0023Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$128,232$33,390$100,000$141,000$241,000
ARDOT contract A40048: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of November 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy