ARDOT contract A30046 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO DO A CONCRETE PAVEMENT REPAIR ON INTERSTATE 30 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE PAVEMENT FOR PATCHING, MAINTENANCE OF TRAFFIC, RAISED PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on August 12, 2026, Miller. 4 bids received; low bid $1,295,377 by Emery Sapp & Sons, Inc..
- Owner
- Arkansas DOT
- Letting
- 12 AUG 2026
- Pay items
- 15
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Emery Sapp & Sons, Inc. | $1,295,377 | Low |
| 2 | Weaver-Bailey Contractors, Inc. | $1,473,929 | +14% |
| 3 | Ti-Zack Concrete, LLC | $1,501,664 | +16% |
| 4 | Redstone Construction Group, Inc. | $1,915,990 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Emery Sapp & Sons, Inc. | 2. Weaver-Bailey Contractors, Inc. | 3. Ti-Zack Concrete, LLC | 4. Redstone Construction Group, Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Removal and disposal of concrete pavement for patching (507002) | SY | 1,550 | $63.00 | $260.07 | $96.80 | $295.00 |
| 0002 | Portland cement concrete pavement patching (14" uniform thickness) (507234) | SY | 1,550 | $532.00 | $445.86 | $710.92 | $485.00 |
| 0003 | Joint rehabilitation (type A) (509001) | LF | 3,500 | $8.00 | $6.52 | $6.60 | $12.00 |
| 0004 | Joint rehabilitation (type B) (509002) | LF | 6,500 | $5.00 | $7.04 | $6.60 | $12.50 |
| 0005 | Maintenance of traffic (603010) | LS | 1 | $113,000 | $146,850 | $9,350.00 | $415,000 |
| 0006 | Signs (604003) | SF | 732 | $19.00 | $16.50 | $16.50 | $15.00 |
| 0007 | Traffic drums (604023) | EACH | 437 | $76.00 | $66.00 | $27.50 | $60.00 |
| 0008 | Advance warning arrow panel (604071) | DAY | 86 | $19.00 | $16.50 | $165.00 | $15.00 |
| 0009 | Portable changeable message sign (604078) | WEEK | 15 | $319.00 | $275.00 | $550.00 | $250.00 |
| 0010 | Mobile speed notification system (special) (604160) | EACH | 1 | $18,000 | $13,200 | $16,500 | $12,000 |
| 0011 | Roadway construction control (635011) | LS | 1 | $51,000 | $29,000 | $38,500 | $9,500.00 |
| 0012 | Enhanced thermoplastic pavement marking white (6") (719502) | LF | 900 | $17.00 | $5.34 | $7.05 | $15.00 |
| 0013 | Enhanced thermoplastic pavement marking yellow (6") (719602) | LF | 60 | $17.00 | $5.34 | $7.05 | $15.00 |
| 0014 | Raised pavement markers (type II) (721002) | EACH | 4 | $192.00 | $82.50 | $11.00 | $150.00 |
| 0015 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $60,000 | $70,187 | $66,000 | $90,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of August 12, 2026. Compiled by Mirage Metrics.