ARDOT contract 040746 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 1.431 MILES OF HIGHWAY 112, CONSTRUCT A PEDESTRIAN TUNNEL, CONSTRUCT THREE ROUNDABOUTS, AND MOVE CITY UTILITIES IN FAYETTEVILLE IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, FLOWABLE SELECT MATERIAL, EARTHWORK, SELECT GRANULAR BACKFILL, AGGREGATE BASE COURSE, PORTLAND CEMENT CONCRETE BASE, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, PORTLAND CEMENT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, CONCRETE DITCH PAVING, MINOR DRAINAGE, EROSION CONTROL, CONCRETE ISLAND, WALKS, AND CURB, WHEELCHAIR RAMPS, TRAFFIC SIGNAL ITEMS, ILLUMINATION ITEMS, SIGNING ITEMS, UTILITY ITEMS, PAVEMENT MARKING, CONSTRUCT ONE QUAD. R.C. BOX CULVERT (35.00'), PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on October 15, 2025, Washington. 3 bids received; low bid $43,941,618 by Apac-Central, Inc..
- Owner
- Arkansas DOT
- Letting
- 15 OCT 2025
- Pay items
- 297
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Apac-Central, Inc. | $43,941,618 | Low |
| 2 | Crossland Construction Co., Inc. | $46,738,488 | +6.0% |
| 3 | Emery Sapp & Sons, Inc. | $52,476,461 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Apac-Central, Inc. | 2. Crossland Construction Co., Inc. | 3. Emery Sapp & Sons, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Clearing (201011) | STA | 92 | $725.00 | $16,800 | $1,500.00 |
| 0002 | Grubbing (201111) | STA | 92 | $900.00 | $8,200.00 | $1,500.00 |
| 0003 | Clearing and grubbing trees (201311) | EACH | 17 | $6,741.97 | $5,783.00 | $5,000.00 |
| 0004 | Removal and disposal of curb (202001) | LF | 154 | $3.85 | $3.87 | $7.84 |
| 0005 | Removal and disposal of curb and gutter (202003) | LF | 3,468 | $3.85 | $3.75 | $7.24 |
| 0006 | Removal and disposal of fence (202011) | LF | 9,460 | $1.96 | $1.77 | $3.12 |
| 0007 | Removal and disposal of gates (202017) | EACH | 8 | $257.02 | $323.00 | $277.64 |
| 0008 | Removal and disposal of fence posts (202022) | EACH | 3 | $335.29 | $92.00 | $185.10 |
| 0009 | Removal and disposal of concrete pavement (202042) | SY | 19 | $8.57 | $18.47 | $30.00 |
| 0010 | Removal and disposal of concrete islands (202047) | SY | 12 | $7.71 | $20.86 | $41.32 |
| 0011 | Removal and disposal of concrete driveways (202062) | SY | 1,730 | $8.57 | $6.77 | $7.91 |
| 0012 | Removal and disposal of walks (202072) | SY | 2,608 | $8.57 | $5.23 | $4.91 |
| 0013 | Removal and disposal of sign foundations (202084) | EACH | 5 | $954.00 | $946.00 | $1,093.90 |
| 0014 | Removal and disposal of junction boxes (202092) | EACH | 3 | $965.80 | $559.00 | $1,398.11 |
| 0015 | Removal and disposal of drop inlets (202093) | EACH | 11 | $965.80 | $559.00 | $1,398.11 |
| 0016 | Removal and disposal of pipe culverts (202096) | EACH | 40 | $1,287.73 | $664.00 | $1,805.55 |
| 0017 | Removal and disposal of box culverts (202097) | EACH | 2 | $965.80 | $19,603 | $4,963.79 |
| 0018 | Removal and disposal of headwalls (202099) | EACH | 1 | $1,287.73 | $1,620.00 | $863.15 |
| 0019 | Removal and disposal of signs (202191) | EACH | 6 | $530.00 | $296.00 | $607.73 |
| 0020 | Removal and disposal of asbestos-cement water line (202510) | LF | 1,900 | $26.01 | $26.42 | $84.11 |
| 0021 | Removal and disposal of fence (202511) | LF | 550 | $3.13 | $4.37 | $11.66 |
| 0022 | Removal and disposal of manholes (202690) | EACH | 6 | $1,931.61 | $559.00 | $1,398.11 |
| 0023 | Removal and salvage of fire hydrant (202916) | EACH | 11 | $699.83 | $540.00 | $1,270.50 |
| 0024 | Flowable select material (206021) | CY | 26 | $62.66 | $335.23 | $315.69 |
| 0025 | Flowable select material (206031) | CY | 190 | $95.88 | $228.27 | $315.22 |
| 0026 | Unclassified excavation (210213) | CY | 18,535 | $14.00 | $4.47 | $40.83 |
| 0027 | Select granular backfill (210433) | CY | 6,400 | $50.52 | $77.01 | $106.06 |
| 0028 | Compacted embankment (210611) | CY | 217,648 | $24.75 | $22.78 | $34.50 |
| 0029 | Soil stabilization (210702) | TON | 100 | $741.62 | $907.19 | $1,150.91 |
| 0030 | Aggregate base course (class 7) (303117) | TON | 3,181 | $50.00 | $27.26 | $39.47 |
| 0031 | Portland cement concrete base (6" uniform thickness) (309506) | SY | 271 | $78.00 | $123.70 | $80.39 |
| 0032 | Portland cement concrete base (6 1/2" uniform thickness) (309517) | SY | 13 | $432.00 | $214.89 | $154.37 |
| 0033 | Tack coat (401011) | GAL | 10,504 | $3.00 | $2.80 | $3.98 |
| 0034 | Mineral aggregate in achm base course (1 1/2") (405161) | TON | 18,321 | $109.00 | $104.30 | $107.75 |
| 0035 | Asphalt binder (PG 70-22) in achm base course (1 1/2") (minimum bid $120.00) (405412) | TON | 803 | $120.00 | $129.22 | $120.00 |
| 0036 | Mineral aggregate in achm binder course (1") (406161) | TON | 13,770 | $110.00 | $106.04 | $108.54 |
| 0037 | Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412) | TON | 634 | $120.00 | $129.22 | $120.00 |
| 0038 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 13,864 | $125.00 | $119.78 | $135.25 |
| 0039 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 62 | $120.00 | $129.22 | $120.00 |
| 0040 | Asphalt binder (PG 76-22) in achm surface course (1/2") (minimum bid $120.00) (407452) | TON | 807 | $120.00 | $129.22 | $120.00 |
| 0041 | Cold milling asphalt pavement (412002) | SY | 6,343 | $6.00 | $4.06 | $4.83 |
| 0042 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 40 | $580.00 | $193.45 | $330.00 |
| 0043 | Achm patching of existing roadway (415011) | TON | 40 | $580.00 | $257.25 | $330.00 |
| 0044 | Portland cement concrete pavement (8" uniform thickness) (501208) | SY | 2,332.48 | $139.00 | $98.21 | $95.11 |
| 0045 | Portland cement concrete driveway (505011) | SY | 3,997.15 | $95.00 | $105.11 | $79.27 |
| 0046 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $1,994,000 | $2,150,000 | $2,450,000 |
| 0047 | Furnishing field office (602011) | EACH | 1 | $18,000 | $35,758 | $492,000 |
| 0048 | Maintenance of traffic (603010) | LS | 1 | $375,000 | $364,304 | $717,000 |
| 0049 | 18" temporary culvert (603018) | LF | 280 | $66.75 | $80.04 | $96.20 |
| 0050 | Signs (604003) | SF | 1,139 | $13.50 | $12.92 | $14.58 |
| 0051 | Construction project information sign update (604010) | EACH | 10 | $56.00 | $54.00 | $60.77 |
| 0052 | Barricades (604013) | LF | 200 | $28.00 | $26.92 | $30.39 |
| 0053 | Traffic drums (604023) | EACH | 308 | $56.00 | $54.00 | $60.77 |
| 0054 | Traffic cone (604026) | EACH | 98 | $22.50 | $22.00 | $24.31 |
| 0055 | Furnishing and installing precast concrete barrier (604031) | LF | 1,540 | $60.00 | $64.25 | $70.49 |
| 0056 | Relocating precast concrete barrier (max. bid 25% of item number ) (604036) | LF | 93 | $15.00 | $15.98 | $17.50 |
| 0057 | Construction pavement markings (604041) | LF | 119,041 | $0.90 | $0.86 | $0.97 |
| 0058 | Construction pavement markings (words) (604045) | EACH | 13 | $280.00 | $269.00 | $303.86 |
| 0059 | Construction pavement markings (arrows) (604046) | EACH | 64 | $112.00 | $108.00 | $121.54 |
| 0060 | Removal of construction pavement markings (604055) | LF | 50,461 | $0.91 | $0.92 | $1.03 |
| 0061 | Removal of construction pavement markings (words) (604056) | EACH | 4 | $140.00 | $135.00 | $151.93 |
| 0062 | Removal of construction pavement markings (arrows) (604057) | EACH | 17 | $112.00 | $108.00 | $121.54 |
| 0063 | Vertical panels (604083) | EACH | 308 | $67.00 | $65.00 | $72.92 |
| 0064 | Concrete ditch paving (type B) (605012) | SY | 867 | $87.00 | $135.33 | $117.21 |
| 0065 | 18" reinforced concrete pipe culverts (class III) (605601) | LF | 580 | $87.00 | $105.09 | $118.39 |
| 0066 | 18" reinforced concrete pipe culverts (class IV) (605603) | LF | 284 | $82.71 | $107.50 | $125.28 |
| 0067 | 30" reinforced concrete pipe culverts (class III) (605611) | LF | 30 | $119.55 | $169.44 | $186.81 |
| 0068 | 30" reinforced concrete pipe culverts (class IV) (605613) | LF | 34 | $139.30 | $198.15 | $198.71 |
| 0069 | 30" reinforced concrete pipe culverts (class V) (605614) | LF | 78 | $255.88 | $179.95 | $162.53 |
| 0070 | 36" reinforced concrete pipe culverts (class III) (605616) | LF | 108 | $170.00 | $189.84 | $207.84 |
| 0071 | 36" reinforced concrete pipe culverts (class IV) (605618) | LF | 738 | $189.97 | $201.48 | $227.73 |
| 0072 | 42" reinforced concrete pipe culverts (class III) (605621) | LF | 74 | $205.44 | $207.07 | $267.41 |
| 0073 | 54" reinforced concrete pipe culverts (class III) (605631) | LF | 126 | $285.22 | $266.94 | $376.29 |
| 0074 | 60" reinforced concrete pipe culverts (class III) (605636) | LF | 360 | $328.46 | $312.68 | $481.08 |
| 0075 | 60" reinforced concrete pipe culverts (class IV) (605638) | LF | 144 | $356.26 | $341.54 | $454.47 |
| 0076 | 44" X 27" reinforced concrete arch pipe culverts (class III) (605761) | LF | 50 | $201.79 | $221.28 | $271.59 |
| 0077 | 30" flared end sections for reinforced concrete pipe culverts (605860) | EACH | 1 | $2,030.34 | $3,128.00 | $2,621.76 |
| 0078 | 36" flared end sections for reinforced concrete pipe culverts (605862) | EACH | 1 | $3,862.51 | $3,258.00 | $3,874.46 |
| 0079 | 60" flared end sections for reinforced concrete pipe culverts (605870) | EACH | 4 | $6,981.54 | $9,835.00 | $10,261 |
| 0080 | 44" X 27" flared end sections for reinforced concrete arch pipe culverts (605887) | EACH | 1 | $4,189.56 | $5,027.00 | $4,894.44 |
| 0081 | 12" side drain (606701) | LF | 1,200 | $42.76 | $64.02 | $107.30 |
| 0082 | 18" side drain (606703) | LF | 498 | $65.94 | $76.49 | $103.61 |
| 0083 | 24" side drain (606704) | LF | 250 | $92.92 | $91.77 | $116.39 |
| 0084 | 42" side drain (606707) | LF | 225 | $189.94 | $173.34 | $237.33 |
| 0085 | 22" X 14" side drain (606738) | LF | 100 | $113.92 | $94.14 | $162.98 |
| 0086 | Selected pipe bedding (606994) | CY | 1,550 | $65.79 | $106.33 | $96.42 |
| 0087 | Drop inlets (type C) (609013) | EACH | 10 | $12,981 | $14,137 | $16,823 |
| 0088 | Drop inlets (type E) (609015) | EACH | 1 | $11,375 | $12,447 | $13,690 |
| 0089 | Drop inlets (type MO) (609134) | EACH | 168 | $8,818.62 | $11,685 | $11,713 |
| 0090 | Drop inlets (type ST) (609138) | EACH | 1 | $12,533 | $13,177 | $13,531 |
| 0091 | Junction boxes (type E) (609215) | EACH | 1 | $11,375 | $103,173 | $12,940 |
| 0092 | Drop inlet extensions (4') (609311) | EACH | 110 | $955.23 | $3,928.00 | $949.17 |
| 0093 | Drop inlet extensions (8') (609312) | EACH | 11 | $1,467.28 | $5,718.00 | $1,892.06 |
| 0094 | Yard drains (609511) | EACH | 12 | $1,172.13 | $3,179.00 | $2,856.29 |
| 0095 | 4" pipe underdrains (611008) | LF | 4,000 | $22.43 | $15.08 | $20.45 |
| 0096 | Underdrain outlet protectors (611013) | EACH | 35 | $973.06 | $928.00 | $2,040.87 |
| 0097 | Pavement repair over culverts (asphalt) (615022) | TON | 37 | $400.00 | $258.32 | $330.00 |
| 0098 | Pavement repair over culverts (concrete) (615031) | CY | 335 | $188.84 | $630.15 | $407.59 |
| 0099 | Wire fence (type D) (619028) | LF | 1,620 | $15.38 | $13.42 | $14.60 |
| 0100 | Wire fence (type D-1) (619029) | LF | 3,897 | $15.91 | $11.90 | $12.94 |
| 0101 | Rail wood fence (619031) | LF | 100 | $29.61 | $64.53 | $70.19 |
| 0102 | Board fence (619032) | LF | 100 | $31.73 | $46.35 | $50.42 |
| 0103 | 4' steel chain link fence (619144) | LF | 50 | $33.84 | $32.56 | $35.42 |
| 0104 | 6' steel chain link fence (619146) | LF | 100 | $38.08 | $42.24 | $45.94 |
| 0105 | Steel fence (619299) | LF | 100 | $52.88 | $88.00 | $35.42 |
| 0106 | Lime (620001) | TON | 47 | $47.72 | $50.28 | $54.69 |
| 0107 | Seeding (620011) | ACRE | 23.06 | $1,312.33 | $1,384.00 | $1,504.28 |
| 0108 | Mulch cover (620022) | ACRE | 91.97 | $1,045.71 | $1,215.00 | $1,198.66 |
| 0109 | Water (620030) | MGAL | 4,100.50 | $5.29 | $5.59 | $15.80 |
| 0110 | Temporary seeding (621001) | ACRE | 68.91 | $836.87 | $825.00 | $959.28 |
| 0111 | Silt fence (621021) | LF | 15,196 | $3.57 | $3.78 | $4.11 |
| 0112 | Sand bag ditch checks (621031) | BAG | 1,711 | $10.99 | $12.00 | $12.59 |
| 0113 | Sediment basin (621071) | CY | 1,039 | $22.21 | $45.14 | $7.66 |
| 0114 | Obliteration of sediment basin (621101) | CY | 1,039 | $22.21 | $25.95 | $7.66 |
| 0115 | Sediment removal and disposal (621111) | CY | 2,134 | $26.44 | $14.88 | $33.25 |
| 0116 | Rock ditch checks (621151) | CY | 1,348 | $117.70 | $146.81 | $52.06 |
| 0117 | Filter sock (12") (621168) | LF | 5,858 | $8.84 | $8.78 | $10.16 |
| 0118 | Second seeding application (623001) | ACRE | 23.06 | $503.67 | $363.00 | $577.34 |
| 0119 | Solid sodding (624001) | SY | 27,160 | $4.42 | $4.61 | $5.08 |
| 0120 | Erosion control matting (class 3) (626003) | SY | 246 | $8.84 | $7.65 | $10.16 |
| 0121 | Concrete island (632011) | SY | 1,872 | $152.00 | $119.38 | $103.30 |
| 0122 | Concrete walks (633011) | SY | 13,835 | $76.00 | $65.83 | $86.83 |
| 0123 | Concrete walks (type special) (633017) | SY | 1,268 | $1,035.00 | $1,178.88 | $653.24 |
| 0124 | Hand railing (633201) | LF | 3,233 | $87.00 | $95.54 | $103.43 |
| 0125 | Concrete combination curb and gutter (type A) (1' 6") (634201) | LF | 32,042 | $23.00 | $20.92 | $27.44 |
| 0126 | Concrete combination curb and gutter (type E-1) (2' 0") (634501) | LF | 1,615 | $34.00 | $27.68 | $30.39 |
| 0127 | Roadway construction control (635001) | LS | 1 | $425,000 | $334,000 | $480,000 |
| 0128 | Mailboxes (637001) | EACH | 10 | $84.00 | $84.00 | $91.16 |
| 0129 | Mailbox supports (single) (637017) | EACH | 8 | $238.00 | $251.00 | $273.48 |
| 0130 | Mailbox supports (double) (637018) | EACH | 1 | $233.00 | $246.00 | $267.40 |
| 0131 | Wheelchair ramps (type 2) (641019) | SY | 33 | $715.00 | $338.62 | $124.72 |
| 0132 | Wheelchair ramps (type 3) (641020) | SY | 281 | $208.00 | $477.20 | $298.76 |
| 0133 | System local controller TS2-type 2, E-net (8 phases) (701227) | EACH | 2 | $38,803 | $39,407 | $48,618 |
| 0134 | Ethernet switch, T100 hardened (8-port) (701722) | EACH | 2 | $1,290.00 | $1,307.00 | $1,823.17 |
| 0135 | E-net cable (exterior cat 5E) (701751) | LF | 178 | $5.70 | $5.73 | $4.86 |
| 0136 | Local radio (E-net 5.8) with antenna (702304) | EACH | 1 | $1,091.00 | $1,108.00 | $1,823.17 |
| 0137 | Traffic signal head, LED, (3 section, 1 way) (706039) | EACH | 9 | $1,268.00 | $1,287.00 | $1,701.63 |
| 0138 | Traffic signal head, LED, (4 section, 1 way) (706043) | EACH | 5 | $2,110.00 | $2,142.00 | $1,944.71 |
| 0139 | Central control unit (707006) | EACH | 1 | $6,500.00 | $26,920 | $6,684.94 |
| 0140 | Pole mounted assembly (707007) | EACH | 8 | $1,466.00 | $1,488.00 | $1,336.99 |
| 0141 | Countdown pedestrian signal head, LED (707015) | EACH | 8 | $1,068.00 | $1,085.00 | $1,215.44 |
| 0142 | Traffic signal cable (5C/12 A.W.G.) (708007) | LF | 1,947 | $6.22 | $6.31 | $4.56 |
| 0143 | Traffic signal cable (5C/14 A.W.G.) (708008) | LF | 3,169 | $5.49 | $5.59 | $4.25 |
| 0144 | Traffic signal cable (7C/14 A.W.G.) (708012) | LF | 1,229 | $6.67 | $6.76 | $4.56 |
| 0145 | Traffic signal cable (20C/14 A.W.G.) (708038) | LF | 730 | $13.90 | $14.07 | $7.90 |
| 0146 | Electrical conductors-in-conduit (1C/8 A.W.G., E.G.C.) (708207) | LF | 917 | $4.00 | $4.01 | $2.43 |
| 0147 | Electrical conductors-in-conduit (1C/12 A.W.G., E.G.C.) (708211) | LF | 55 | $3.23 | $3.27 | $2.13 |
| 0148 | Electrical conductors-in-conduit (2C/8 A.W.G., E.G.C.) (708212) | LF | 6,051 | $4.70 | $4.01 | $4.86 |
| 0149 | Electrical conductors-in-conduit (2C/6 A.W.G.) (708217) | LF | 101 | $4.70 | $4.70 | $4.86 |
| 0150 | Electrical conductors-in-conduit (2C/6 A.W.G., E.G.C.) (708240) | LF | 1,335 | $4.60 | $4.62 | $6.08 |
| 0151 | Electrical conductors for luminaires (708451) | LF | 5,536 | $4.70 | $4.75 | $3.04 |
| 0152 | Galvanized steel conduit (2") (709004) | LF | 50 | $62.90 | $63.83 | $48.62 |
| 0153 | Galvanized steel conduit (3") (709005) | LF | 60 | $73.23 | $74.37 | $60.77 |
| 0154 | PVC coated galvanized steel conduit (1.5") (709040) | LF | 253 | $112.38 | $114.12 | $60.77 |
| 0155 | Non-metallic conduit (2") (710004) | LF | 7,398 | $13.20 | $13.48 | $21.88 |
| 0156 | Non-metallic conduit (3") (710005) | LF | 409 | $44.00 | $44.47 | $54.69 |
| 0157 | Concrete pull box (type 2) (711004) | EACH | 2 | $1,245.00 | $1,264.00 | $1,458.54 |
| 0158 | Concrete pull box (type 2 HD) (711105) | EACH | 5 | $1,440.00 | $1,461.00 | $3,038.61 |
| 0159 | Concrete pull box (type 2 HD) (711117) | EACH | 67 | $2,305.00 | $2,342.00 | $3,038.61 |
| 0160 | Span wire assembly (713011) | EACH | 1 | $4,000.00 | $4,057.00 | $10,331 |
| 0161 | Traffic signal mast arm and pole with foundation (52') (714052) | EACH | 1 | $46,033 | $46,748 | $51,049 |
| 0162 | LED luminaire assembly (714724) | EACH | 4 | $1,344.00 | $1,365.00 | $1,215.44 |
| 0163 | Submersible luminaire (1,500 lumens, LED) (714732) | EACH | 6 | $1,138.00 | $1,154.00 | $2,430.90 |
| 0164 | LED roadway illumination pole (10,000 lumens, pendant, shoe base, 20') (714830) | EACH | 11 | $10,614 | $10,779 | $12,762 |
| 0165 | LED roadway illumination pole (20,000 lumens, cobra head, shoe base, 45') (714832) | EACH | 1 | $9,311.00 | $9,457.00 | $15,193 |
| 0166 | LED roadway illumination pole (39,000 lumens, cobra head, shoe base, 45') (714834) | EACH | 1 | $9,603.00 | $9,753.00 | $15,193 |
| 0167 | LED roadway illumination pole (20,000 lumens, cobra head, shoe base, 40’) (714844) | EACH | 32 | $9,033.00 | $9,173.00 | $15,193 |
| 0168 | LED roadway illumination pole (20,000 lumens, cobra head, shoe base, 50’) (714845) | EACH | 1 | $9,728.00 | $9,879.00 | $15,801 |
| 0169 | LED roadway illumination pole (27,000 lumens, cobra head, breakaway T-base, 40’) (714846) | EACH | 1 | $10,104 | $10,262 | $15,193 |
| 0170 | LED roadway illumination pole (39,000 lumens, cobra head, shoe base, 40’) (714847) | EACH | 17 | $9,330.00 | $9,475.00 | $15,193 |
| 0171 | LED roadway illumination pole (39,000 lumens, cobra head, shoe base, 50’) (714848) | EACH | 1 | $10,020 | $10,176 | $15,801 |
| 0172 | Traffic signal pedestal pole with foundation (715011) | EACH | 3 | $11,120 | $11,290 | $7,900.38 |
| 0173 | Service point assembly (2 circuits) (715102) | EACH | 1 | $7,025.00 | $7,135.00 | $7,292.67 |
| 0174 | Pedestal type service point assembly (100 amp) (715111) | EACH | 3 | $20,984 | $24,702 | $14,585 |
| 0175 | Removal of traffic signal equipment (715704) | LS | 1 | $27,490 | $27,917 | $12,154 |
| 0176 | Treated wood pole (class 2, 45') (716245) | EACH | 2 | $3,434.00 | $3,488.00 | $9,115.84 |
| 0177 | Reflectorized paint pavement marking white (12") (718005) | LF | 422 | $3.40 | $3.23 | $3.65 |
| 0178 | Reflectorized paint pavement marking yellow (12") (718105) | LF | 3,255 | $3.40 | $3.23 | $3.65 |
| 0179 | Thermoplastic pavement marking white (6") (719002) | LF | 12,405 | $1.32 | $1.35 | $1.52 |
| 0180 | Thermoplastic pavement marking white (8") (719003) | LF | 788 | $3.40 | $3.23 | $3.65 |
| 0181 | Thermoplastic pavement marking white (12") (719005) | LF | 4,121 | $9.00 | $8.61 | $9.72 |
| 0182 | Thermoplastic pavement marking white (48") (719008) | LF | 2,786 | $17.00 | $16.15 | $18.23 |
| 0183 | Thermoplastic pavement marking yellow (6") (719102) | LF | 7,012 | $1.32 | $1.35 | $1.52 |
| 0184 | Thermoplastic pavement marking yellow (8") (719103) | LF | 3,216 | $3.40 | $3.23 | $3.65 |
| 0185 | Thermoplastic pavement marking (yield line) (719200) | LF | 259 | $22.50 | $21.54 | $24.31 |
| 0186 | Thermoplastic pavement marking (words) (719201) | EACH | 6 | $336.00 | $323.00 | $364.63 |
| 0187 | Thermoplastic pavement marking (arrows) (719202) | EACH | 54 | $448.00 | $431.00 | $486.18 |
| 0188 | Raised pavement markers (type II) (721002) | EACH | 188 | $22.50 | $22.00 | $24.31 |
| 0189 | Standard sign (726002) | SF | 1,679 | $30.67 | $32.30 | $36.46 |
| 0190 | 18" street name sign (726012) | EACH | 1 | $979.00 | $861.00 | $972.36 |
| 0191 | Omni-directional breakaway sign supports (type G-1) (730499) | EACH | 107 | $2,650.88 | $2,800.00 | $3,160.16 |
| 0192 | Omni-directional breakaway sign supports (type G-2) (730500) | EACH | 2 | $2,968.99 | $3,123.00 | $3,524.80 |
| 0193 | Omni-directional breakaway sign supports (type G-3) (730501) | EACH | 5 | $3,287.09 | $3,446.00 | $3,889.43 |
| 0194 | Omni-directional breakaway sign supports (type G2-1) (730502) | EACH | 14 | $2,968.98 | $3,123.00 | $3,524.80 |
| 0195 | Omni-directional breakaway sign supports (type G2-4) (730505) | EACH | 1 | $2,968.98 | $3,123.00 | $3,524.80 |
| 0196 | Temporary impact attenuation barrier (731071) | EACH | 3 | $8,218.00 | $11,418 | $9,419.69 |
| 0197 | Temporary impact attenuation barrier (repair) (731072) | EACH | 5 | $530.00 | $538.00 | $607.73 |
| 0198 | Temporary impact attenuation barrier (relocation) (731075) | EACH | 2 | $3,980.00 | $7,111.00 | $4,557.91 |
| 0199 | 360-degree camera (733010) | EACH | 2 | $4,994.00 | $6,138.00 | $12,154 |
| 0200 | Advanced detection camera (733011) | EACH | 2 | $4,024.00 | $4,910.00 | $12,154 |
| 0201 | Video detection system relocation (733014) | EACH | 1 | $1,400.00 | $7,118.00 | $7,292.67 |
| 0202 | Shelf mounted processor (733016) | EACH | 1 | $35,025 | $45,290 | $42,541 |
| 0203 | Video cable (exterior cat 5E) (733035) | LF | 1,850 | $6.45 | $3.77 | $4.86 |
| 0204 | Video monitor (CLR) (733042) | EACH | 1 | $2,026.00 | $1,015.00 | $1,458.54 |
| 0205 | Unclassified excavation for structures-roadway (801101) | CY | 8,478 | $125.00 | $26.88 | $178.85 |
| 0206 | Class S concrete-roadway (802012) | CY | 2,489.39 | $1,350.00 | $1,411.73 | $1,074.08 |
| 0207 | Architectural finish (802229) | SF | 23,462 | $10.42 | $12.15 | $6.77 |
| 0208 | Textured coating finish (802951) | SY | 1,962 | $6.40 | $13.86 | $15.07 |
| 0209 | Reinforcing steel-roadway (grade 60) (804003) | LB | 323,557 | $3.25 | $1.10 | $1.50 |
| 0210 | Filter blanket (816003) | SY | 97 | $4.43 | $4.50 | $5.37 |
| 0211 | Dumped riprap (816111) | CY | 49 | $60.12 | $105.46 | $126.10 |
| 0212 | 6" X 6" tapping sleeve, 6" tapping valve with box (904129) | EACH | 3 | $7,782.61 | $8,313.00 | $9,235.55 |
| 0213 | 8" X 8" tapping sleeve, 8" tapping valve with box (904136) | EACH | 5 | $9,244.74 | $9,847.00 | $11,286 |
| 0214 | 12" X 12" tapping sleeve 12" tapping valve with box (904138) | EACH | 1 | $25,916 | $27,306 | $27,732 |
| 0215 | 2" polyethylene casing (904141) | LF | 340 | $2.61 | $2.75 | $26.05 |
| 0216 | 6" gate valve with box (904150) | EACH | 2 | $2,682.30 | $2,927.00 | $2,745.57 |
| 0217 | 8" gate valve with box (904151) | EACH | 10 | $3,554.29 | $3,842.00 | $3,636.66 |
| 0218 | Single water meter setting (inc. meter box and shut off valve) (904170) | EACH | 24 | $2,196.37 | $2,284.00 | $2,323.33 |
| 0219 | Cut and cap existing water main (2") (904182) | EACH | 2 | $1,021.18 | $1,781.00 | $7,308.45 |
| 0220 | Cut and cap existing water main (24") (904186) | EACH | 2 | $6,924.81 | $7,869.00 | $15,543 |
| 0221 | Cut and cap existing water main (6") (904187) | EACH | 21 | $1,800.02 | $2,084.00 | $8,203.39 |
| 0222 | Cut and cap existing water main (8") (904188) | EACH | 13 | $2,330.98 | $2,503.00 | $7,906.39 |
| 0223 | 4" PVC SCH 40 sewer service (904204) | LF | 160 | $40.20 | $50.09 | $134.38 |
| 0224 | 8" PVC SDR-26 sewer main (904208) | LF | 3,100 | $53.60 | $63.19 | $61.07 |
| 0225 | 8" restrained joint ductile iron pipe sewer main, class 50 (904209) | LF | 600 | $143.00 | $156.61 | $149.83 |
| 0226 | Manhole, 0' to 6' depth (4' diameter) (904219) | EACH | 28 | $7,792.00 | $8,697.52 | $11,876 |
| 0227 | Manhole, extra depth (4' diameter) (904222) | LF | 157 | $430.26 | $450.05 | $823.46 |
| 0228 | Core existing manhole and connect sewer main (904231) | EACH | 5 | $2,744.43 | $2,819.00 | $3,009.59 |
| 0229 | Plug existing sanitary sewer (8") (904280) | EACH | 13 | $858.86 | $1,117.00 | $490.83 |
| 0230 | Abandon existing manhole (904501) | EACH | 11 | $2,070.00 | $3,826.00 | $3,008.04 |
| 0231 | Jack and bore 24" steel encasement pipe (904877) | LF | 720 | $1,338.00 | $1,442.44 | $1,414.97 |
| 0232 | 36" cut and plug main (904906) | EACH | 6 | $37,930 | $40,270 | $33,436 |
| 0233 | 8" anchor collar and appurtenances (904913) | EACH | 2 | $4,077.00 | $4,740.00 | $3,898.02 |
| 0234 | Fill abandoned sewer mains with flowable fill (abandon-in-place) (904937) | LF | 1,290 | $7.30 | $27.08 | $16.42 |
| 0235 | Fill abandoned water mains with flowable fill (abandon-in-place) (904938) | LF | 2,509 | $23.30 | $18.68 | $15.30 |
| 0236 | Fire hydrant assembly (904957) | EACH | 26 | $10,980 | $11,779 | $12,539 |
| 0237 | Ductile iron fittings (904960) | LB | 54,900 | $17.75 | $19.27 | $21.04 |
| 0238 | Concrete blocking (905228) | CY | 250 | $190.26 | $440.16 | $349.30 |
| 0239 | Temporary erosion control (906156) | LS | 1 | $17,400 | $18,717 | $38,384 |
| 0240 | Trench safety (906241) | LS | 1 | $73,301 | $76,367 | $103,544 |
| 0241 | Ductile iron pipe water main (_", class 250) (911610) | LF | 3,050 | $768.00 | $840.91 | $761.49 |
| 0242 | Polyethylene wrap (_" pipe, double wrap) (911611) | LF | 3,050 | $13.97 | $14.66 | $15.84 |
| 0243 | 12" butterfly valve with box (911624) | EACH | 28 | $9,360.81 | $10,053 | $9,546.85 |
| 0244 | 36" butterfly valve with box (911625) | EACH | 3 | $50,920 | $53,728 | $50,843 |
| 0245 | Connect to existing water main (_") (911626) | EACH | 4 | $1,254.71 | $1,529.00 | $7,483.44 |
| 0246 | Connect to existing asbestos-cement water main (_") (911627) | EACH | 2 | $3,220.00 | $3,584.00 | $8,568.47 |
| 0247 | Exploratory excavation (_" diameter) (911628) | EACH | 2 | $26,275 | $27,492 | $2,368.59 |
| 0248 | Concrete thrust collar on 36" water main (911629) | EACH | 2 | $9,957.00 | $16,251 | $36,256 |
| 0249 | Cut-in connection on existing _" water main (911630) | EACH | 2 | $229,024 | $116,600 | $235,966 |
| 0250 | 2" combination air release valve and enclosure (911631) | EACH | 4 | $5,700.23 | $5,956.00 | $6,282.69 |
| 0251 | 4" combination air release valve and enclosure (911632) | EACH | 1 | $5,448.87 | $5,668.00 | $20,156 |
| 0252 | _" water service connection or tap (911633) | EACH | 25 | $866.00 | $950.00 | $360.93 |
| 0253 | _" copper tubing, type K (911634) | LF | 1,145 | $39.80 | $51.20 | $63.54 |
| 0254 | Double water meter setting (inc. meter box and shutoff valve) (911635) | EACH | 2 | $2,609.00 | $2,760.00 | $3,915.92 |
| 0255 | Relocate _" backflow preventer (911636) | EACH | 4 | $836.00 | $4,450.00 | $3,592.95 |
| 0256 | Bypass pumping for sanitary sewage (911637) | LS | 1 | $38,788 | $41,921 | $670,151 |
| 0257 | Sanitary sewer trenching and backfilling, 4-8' deep (911638) | LF | 30 | $91.28 | $149.14 | $264.80 |
| 0258 | Sanitary sewer trenching and backfilling, 8'-12' deep (911639) | LF | 2,528 | $51.33 | $69.41 | $81.06 |
| 0259 | Sanitary sewer trenching and backfilling, 12'-16' deep (911640) | LF | 490 | $85.74 | $122.24 | $147.49 |
| 0260 | Manhole, 0' to 6' depth (8' diameter) (911641) | EACH | 1 | $18,595 | $22,934 | $16,240 |
| 0261 | Manhole, extra depth (8' diameter) (911642) | LF | 17 | $632.91 | $657.74 | $1,670.42 |
| 0262 | Manhole drop (911643) | EACH | 4 | $3,442.02 | $3,525.00 | $10,747 |
| 0263 | PVC pipe water main (_", AWWA C900, class 305, DR 14) (911644) | LF | 10,700 | $117.50 | $141.17 | $163.06 |
| 0264 | Reconnect sanitary sewer service (4" to 6") (911645) | EACH | 12 | $1,775.75 | $1,820.00 | $917.67 |
| 0265 | Removal and disposal of water line (6" to 24") (911646) | LF | 265 | $18.80 | $19.10 | $54.53 |
| 0266 | Removal and disposal of water line (larger than 24") (911647) | LF | 285 | $22.15 | $22.50 | $47.24 |
| 0267 | Cut and cap existing water main (12") (911648) | EACH | 14 | $2,378.00 | $2,445.00 | $8,736.68 |
| 0268 | Plug existing sanitary sewer (4") (911649) | EACH | 1 | $1,844.96 | $1,893.00 | $1,027.52 |
| 0269 | Plug existing sanitary sewer (6") (911650) | EACH | 3 | $1,387.09 | $1,412.00 | $513.76 |
| 0270 | Plug existing sanitary sewer (10") (911651) | EACH | 2 | $1,517.91 | $1,550.00 | $513.76 |
| 0271 | 18" steel encasement pipe (bored) (911652) | LF | 680 | $1,299.00 | $1,403.76 | $1,599.17 |
| 0272 | 18" steel encasement pipe (open cut method) (911653) | LF | 180 | $214.81 | $223.57 | $209.43 |
| 0273 | 20" steel encasement pipe (bored) (911654) | LF | 400 | $1,326.47 | $1,429.96 | $1,407.83 |
| 0274 | 20" steel encasement pipe (open cut method) (911655) | LF | 410 | $304.51 | $316.70 | $309.39 |
| 0275 | 24" steel encasement pipe (open cut method) (911656) | LF | 180 | $387.81 | $403.26 | $414.22 |
| 0276 | 54" steel encasement pipe (bored) (911657) | LF | 150 | $2,379.77 | $2,565.44 | $3,279.92 |
| 0277 | 54" steel encasement pipe (open cut method) (911658) | LF | 130 | $836.53 | $873.16 | $871.28 |
| 0278 | Cut and cap existing asbestos-cement W ater main (__") (911659) | EACH | 20 | $1,933.47 | $2,241.00 | $12,480 |
| 0279 | Concrete collar (911660) | EACH | 11 | $1,852.79 | $2,124.00 | $21,932 |
| 0280 | Removal and disposal of concrete water vault and valve (911661) | EACH | 1 | $2,741.61 | $2,777.00 | $2,583.07 |
| 0281 | Removal and salvage of flared end sections (911662) | EACH | 1 | $1,157.48 | $1,174.00 | $792.22 |
| 0282 | 18" reinforced concrete pipe culverts (class III) (605601) | LF | 7,110 | $75.96 | $106.72 | $96.93 |
| 0285 | 24" reinforced concrete pipe culverts (class III) (605606) | LF | 991 | $87.18 | $119.02 | $117.05 |
| 0288 | 30" reinforced concrete pipe culverts (class III) (605611) | LF | 666 | $119.60 | $142.55 | $140.41 |
| 0291 | 36" reinforced concrete pipe culverts (class III) (605616) | LF | 808 | $170.00 | $188.59 | $212.05 |
| 0294 | 42" reinforced concrete pipe culverts (class III) (605621) | LF | 662 | $212.70 | $217.57 | $237.92 |
| 0297 | 48" reinforced concrete pipe culverts (class III) (605626) | LF | 118 | $235.80 | $255.99 | $238.01 |
| 0300 | 54" reinforced concrete pipe culverts (class III) (605631) | LF | 980 | $285.20 | $293.78 | $340.38 |
| 0303 | 60" reinforced concrete pipe culverts (class III) (605636) | LF | 716 | $337.69 | $341.56 | $394.35 |
| 0306 | 44" X 27" reinforced concrete arch pipe culverts (class III) (605761) | LF | 146 | $192.92 | $210.94 | $253.34 |
| 0309 | 51" X 31" reinforced concrete arch pipe culverts (class III) (605762) | LF | 192 | $236.86 | $238.25 | $293.85 |
| 0312 | 59" X 36" reinforced concrete arch pipe culverts (class III) (605763) | LF | 36 | $236.86 | $322.63 | $350.23 |
| 0315 | 18" flared end sections for reinforced concrete pipe culverts (605856) | EACH | 3 | $1,463.01 | $2,253.00 | $1,703.28 |
| 0317 | 30" flared end sections for reinforced concrete pipe culverts (605860) | EACH | 2 | $2,286.00 | $2,756.00 | $2,304.87 |
| 0319 | 4' steel chain link fence (619131) | LF | 1,648 | $33.84 | $32.56 | $35.42 |
| 0321 | 5' steel chain link fence (619132) | LF | 398 | $35.96 | $34.62 | $37.65 |
| 0323 | 16' steel gates (619332) | EACH | 2 | $1,988.16 | $1,244.00 | $1,352.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of October 15, 2025. Compiled by Mirage Metrics.