ARDOT contract A90033 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.796 MILES OF HIGHWAYS 59 AND 59B IN BENTON COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF ITEM, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, RUMBLE STRIPS, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Benton. 4 bids received; low bid $3,895,792 by Robinson Construction, LLC.

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
23
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Robinson Construction, LLC$3,895,792Low
2Emery Sapp & Sons, Inc.$4,027,149+3.0%
3Grant Garrett Excavating, Inc.$4,278,847+10%
4Apac-Central, Inc.$4,964,367+27%
ARDOT contract A90033: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Robinson Construction, LLC2. Emery Sapp & Sons, Inc.3. Grant Garrett Excavating, Inc.4. Apac-Central, Inc.
0001Removal and disposal of guardrail (202132)LF650$9.65$10.71$10.72$24.50
0002Aggregate base course (class 7) (303117)TON932$33.00$35.93$43.09$50.00
0003Tack coat (401011)GAL44,248$3.21$3.25$3.63$4.00
0004Mineral aggregate in achm surface course (1/2") (407162)TON27,028$108.85$113.17$119.07$130.00
0005Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON1,603$125.00$120.00$120.00$120.00
0006Cold milling asphalt pavement (412002)SY69,092$2.70$2.43$2.96$4.25
0007Achm patching of existing roadway (415011)TON150$225.00$204.76$251.30$245.00
0008Maintenance of traffic (603010)LS1$35,000$51,331$80,903$170,000
0009Signs (604003)SF1,016$5.80$5.95$5.96$5.70
0010Construction pavement markings (604041)LF164,935$0.28$0.30$0.30$0.40
0011Construction pavement markings (words) (604045)EACH10$150.00$118.99$250.00$56.30
0012Construction pavement markings (arrows) (604046)EACH92$105.00$101.14$101.32$39.40
0013Guardrail (type A) (617005)LF450$36.00$35.70$35.76$33.80
0014Guardrail terminal (type 2) (617312)EACH4$3,000.00$3,450.74$3,456.52$3,261.00
0015Thrie beam guardrail terminal (617332)EACH4$2,050.00$2,379.82$2,383.80$2,811.00
0016Rumble strips in asphalt shoulders (642001)LF48,228$0.29$0.07$0.30$0.19
0017Thermoplastic pavement marking white (6") (719002)LF80,898$0.66$0.77$0.77$0.80
0018Thermoplastic pavement marking white (12") (719005)LF749$3.96$4.16$4.17$5.60
0019Thermoplastic pavement marking yellow (6") (719102)LF84,037$0.72$0.83$0.83$0.80
0020Thermoplastic pavement marking (words) (719201)EACH10$295.00$339.12$339.70$225.00
0021Thermoplastic pavement marking (arrows) (719202)EACH92$265.00$315.33$315.85$141.00
0022Raised pavement markers (type II) (721002)EACH1,560$4.00$4.16$4.17$8.00
0023Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$55,000$59,004$42,000$230,000
ARDOT contract A90033: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy