ARDOT contract C04028 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.96 MILE OF VARIOUS CITY STREETS IN THE CITY OF GATEWAY IN BENTON COUNTY. THIS PROJECT CONSISTS OF SCARIFYING AND RECOMPACTING ROADWAY, AGGREGATE BASE COURSE, ACHM BINDER COURSE, ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on April 9, 2025, Benton. 3 bids received; low bid $288,393 by Apac-Central, Inc..

Owner
Arkansas DOT
Letting
09 APR 2025
Pay items
13
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Apac-Central, Inc.$288,393Low
2Grant Garrett Excavating, Inc.$290,567+1.0%
3Emery Sapp & Sons, Inc.$319,342+11%
ARDOT contract C04028: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Apac-Central, Inc.2. Grant Garrett Excavating, Inc.3. Emery Sapp & Sons, Inc.
0001Scarifying and recompacting roadway (216201)STA25$625.00$777.43$682.92
0002Aggregate base course (class 7) (303107)TON202$65.00$52.21$48.04
0003Tack coat (401011)GAL926$4.10$3.89$3.26
0004Mineral aggregate in achm binder course (1") (406161)TON875$85.00$99.11$105.55
0005Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON42$120.00$120.00$120.00
0006Mineral aggregate in achm surface course (3/8") (407161)TON1,088$101.00$109.72$122.55
0007Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON71$120.00$120.00$120.00
0008Achm patching of existing roadway (415011)TON150$225.00$143.10$183.27
0009Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$10,000$5,821.17$6,681.80
0010Maintenance of traffic (603009)LS1$10,000$5,285.99$11,321
0011Signs (604003)SF72$48.00$53.43$53.97
0012Standard sign (726002)SF12$34.00$38.00$38.38
0013Channel post sign support (type C) (729003)EACH4$101.00$112.80$113.94
ARDOT contract C04028: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy