ARDOT contract C20006 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.20 MILES OF VARIOUS CITY STREETS IN THE CITY OF CARTHAGE IN DALLAS COUNTY. THIS PROJECT CONSISTS OF SHAPING DITCH, SCARIFYING AND RECOMPACTING ROADWAY, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ACHM PATCHING, MAINTENANCE OF TRAFFIC, INSTALLATION OF PIPE CULVERTS AND MISC. ITEMS. Let by Arkansas DOT on April 8, 2026, Dallas. 3 bids received; low bid $366,900 by Redstone Construction Group, Inc..

Owner
Arkansas DOT
Letting
08 APR 2026
Pay items
12
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Redstone Construction Group, Inc.$366,900Low
2Cranford Construction Co.$499,390+36%
3Smackover Paving Co.$542,647+48%
ARDOT contract C20006: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Redstone Construction Group, Inc.2. Cranford Construction Co.3. Smackover Paving Co.
0001Shaping ditch (210322)STA3$1,200.00$1,365.66$1,100.00
0002Scarifying and recompacting roadway (216201)STA34$400.00$1,096.95$750.00
0003Aggregate base course (class 7) (303117)TON1,800$55.40$66.20$71.00
0004Tack coat (401012)GAL695$4.00$4.07$6.00
0005Mineral aggregate in achm surface course (3/8") (407161)TON1,359$136.50$163.75$195.00
0006Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON95$120.00$120.00$300.00
0007Achm patching of existing roadway (415011)TON65$303.39$403.59$400.00
0008Maintenance of traffic (603009)LS1$7,500.00$46,878$3,000.00
0009Signs (604003)SF456$8.28$6.00$7.00
001024" reinforced concrete pipe culverts (class III) (606026)LF4$800.00$1,799.97$545.00
001118" aluminum coated corrugated steel pipe culverts (16 gauge) (606220)LF24$150.00$323.61$2,000.00
0012Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$12,500$11,258$6,000.00
ARDOT contract C20006: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy