ARDOT contract C76086 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.94 MILE OF VARIOUS CITY STREETS IN THE CITY OF LOUANN IN OUACHITA COUNTY, APPROXIMATELY 0.90 MILE OF VARIOUS CITY STREETS IN THE CITY OF NORPHLET AND APPROXIMATELY 1.04 MILES IN THE CITY OF SMACKOVER IN UNION COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Ouachita, Union. 1 bid received; low bid $1,031,609 by Smackover Paving Co..

Owner
Arkansas DOT
Letting
15 JAN 2025
Pay items
12
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Smackover Paving Co.$1,031,609Low
ARDOT contract C76086: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Smackover Paving Co.
0001Trenching and shoulder preparation (215001)STA3$400.00
0002Aggregate base course (class 7) (303107)TON457$126.00
0003Tack coat (401011)GAL3,726$6.00
0004Mineral aggregate in achm surface course (3/8") (407161)TON3,636$209.18
0005Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON241$186.11
0006Achm patching of existing roadway (415011)TON375$310.00
0007Maintenance of traffic (603009)LS1$9,000.00
0008Signs (604003)SF568$7.00
0009Reflectorized paint pavement marking white (4") (718001)LF6,442$0.40
0010Reflectorized paint pavement marking white (12") (718005)LF110$6.00
0011Reflectorized paint pavement marking yellow (4") (718101)LF6,442$0.40
0012Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$10,000
ARDOT contract C76086: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy