ARDOT contract C76086 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.94 MILE OF VARIOUS CITY STREETS IN THE CITY OF LOUANN IN OUACHITA COUNTY, APPROXIMATELY 0.90 MILE OF VARIOUS CITY STREETS IN THE CITY OF NORPHLET AND APPROXIMATELY 1.04 MILES IN THE CITY OF SMACKOVER IN UNION COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Ouachita, Union. 1 bid received; low bid $1,031,609 by Smackover Paving Co..
- Owner
- Arkansas DOT
- Letting
- 15 JAN 2025
- Pay items
- 12
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Smackover Paving Co. | $1,031,609 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Smackover Paving Co. |
|---|---|---|---|---|
| 0001 | Trenching and shoulder preparation (215001) | STA | 3 | $400.00 |
| 0002 | Aggregate base course (class 7) (303107) | TON | 457 | $126.00 |
| 0003 | Tack coat (401011) | GAL | 3,726 | $6.00 |
| 0004 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 3,636 | $209.18 |
| 0005 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 241 | $186.11 |
| 0006 | Achm patching of existing roadway (415011) | TON | 375 | $310.00 |
| 0007 | Maintenance of traffic (603009) | LS | 1 | $9,000.00 |
| 0008 | Signs (604003) | SF | 568 | $7.00 |
| 0009 | Reflectorized paint pavement marking white (4") (718001) | LF | 6,442 | $0.40 |
| 0010 | Reflectorized paint pavement marking white (12") (718005) | LF | 110 | $6.00 |
| 0011 | Reflectorized paint pavement marking yellow (4") (718101) | LF | 6,442 | $0.40 |
| 0012 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.