ARDOT contract 061856 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO IMPROVE APPROXIMATELY 0.197 MILE OF A Y-INTERSECTION ON HIGHWAYS 63 AND 70 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, STONE BACKFILL, EARTHWORK, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, CULVERT CLEAN OUT, EROSION CONTROL, CONCRETE ISLAND, RUMBLE STRIPES, PAVEMENT MARKING, THERMOPLASTIC RUMBLE BAR, AND MISC. ITEMS. Let by Arkansas DOT on April 9, 2025, Prairie. 6 bids received; low bid $311,111 by CK Asphalt, LLC.

Owner
Arkansas DOT
Letting
09 APR 2025
Pay items
41
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1CK Asphalt, LLC$311,111Low
2Rogers Group, Inc.$375,962+21%
3Atlas Asphalt, Inc.$463,260+49%
4Redstone Construction Group, Inc.$470,035+51%
5Delta Asphalt of Arkansas, Inc.$515,949+66%
6Mobley Contractors, Inc.$585,223+88%
ARDOT contract 061856: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. CK Asphalt, LLC2. Rogers Group, Inc.3. Atlas Asphalt, Inc.4. Redstone Construction Group, Inc.5. Delta Asphalt of Arkansas, Inc.6. Mobley Contractors, Inc.
0001Clearing (201011)STA2$3,300.00$1,500.00$1,647.45$1,886.12$1,295.39$1,790.05
0002Grubbing (201111)STA2$3,300.00$1,500.00$1,647.45$1,886.12$1,295.39$1,790.05
0003Stone backfill (207011)TON50$65.00$95.00$119.60$160.00$264.55$106.99
0004Unclassified excavation (210213)CY16$90.00$200.00$156.10$300.00$342.70$163.09
0005Compacted embankment (210611)CY434$36.00$75.00$63.77$82.35$34.24$66.97
0006Aggregate base course (class 7) (303117)TON363$46.20$80.00$81.24$90.43$74.92$100.64
0007Tack coat (401011)GAL1,380$0.01$1.00$5.00$4.79$4.39$1.05
0008Mineral aggregate in achm binder course (1") (406161)TON133$89.00$100.00$203.09$180.00$195.56$110.25
0009Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON7$120.00$700.00$120.00$120.00$120.00$761.25
0010Mineral aggregate in achm surface course (1/2") (407162)TON933$108.00$100.00$163.70$100.00$131.48$110.25
0011Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON49$120.00$700.00$120.00$1,200.00$1,000.00$761.25
0012Cold milling asphalt pavement (412002)SY800$6.23$8.00$3.97$12.87$18.91$8.40
0013Asphalt concrete patching for maintenance of traffic (414011)TON10$220.00$275.00$200.00$200.00$778.92$262.50
0014Achm patching of existing roadway (415011)TON10$220.00$300.00$200.00$250.00$484.39$288.75
0015Maintenance of traffic (603009)LS1$7,500.00$21,000$51,297$42,657$45,000$158,883
0016Signs (604003)SF223$8.00$8.50$4.00$8.73$4.00$8.40
0017Traffic drums (604023)EACH25$25.00$26.00$25.00$25.00$25.00$26.25
0018Construction pavement markings (604041)LF594$0.20$0.81$0.81$0.80$0.80$0.21
0019Vertical panels (604083)EACH20$28.00$30.00$23.00$28.00$23.00$29.40
0020Culvert clean out (606002)EACH2$1,500.00$3,383.00$5,904.77$5,250.00$646.94$4,719.86
0021Lime (620001)TON0.30$200.00$750.00$475.00$475.00$750.00$498.75
0022Seeding (620011)ACRE0.15$4,500.00$16,500$9,950.00$9,950.00$16,500$10,448
0023Mulch cover (620022)ACRE0.15$4,500.00$16,500$9,950.00$9,950.00$16,500$10,448
0024Water (620030)MGAL15.30$10.00$10.00$10.00$10.00$10.00$10.50
0025Silt fence (621021)LF155$3.50$10.00$6.89$6.89$10.00$7.23
0026Sand bag ditch checks (621031)BAG110$12.00$12.00$14.75$14.75$12.00$15.49
0027Sediment removal and disposal (621111)CY16$0.10$25.00$0.38$10.74$326.53$53.32
0028Wattle (20") (621173)LF45$10.00$26.75$16.85$16.85$26.75$17.69
0029Second seeding application (623001)ACRE0.15$1,500.00$3,500.00$4,950.00$4,950.00$3,500.00$5,197.50
0030Concrete island (632011)SY427$150.00$150.00$152.40$177.50$152.40$226.01
0031Roadway construction control (635001)LS1$21,000$10,000$22,868$13,460$45,000$18,624
0032Centerline rumble stripes in asphalt roadways (642102)LF700$6.50$0.41$3.59$0.40$19.70$0.42
0033Thermoplastic pavement marking white (6") (719002)LF2,284$0.90$0.75$0.73$0.72$0.72$0.95
0034Thermoplastic pavement marking white (12") (719005)LF27$3.50$8.00$8.08$8.00$8.00$3.68
0035Thermoplastic pavement marking yellow (6") (719102)LF2,259$0.90$0.75$0.73$0.72$0.72$0.95
0036Thermoplastic pavement marking yellow (12") (719105)LF518$18.00$8.00$8.08$8.00$8.00$3.68
0037Thermoplastic pavement marking (words) (719201)EACH1$325.00$250.00$252.53$250.00$250.00$341.25
0038Thermoplastic pavement marking (arrows) (719202)EACH1$325.00$200.00$202.02$200.00$200.00$341.25
0039Thermoplastic rumble bar (719231)LF70$25.00$7.00$7.07$7.00$7.00$26.25
0040Raised pavement markers (type II) (721002)EACH41$10.00$8.00$8.08$8.00$8.00$10.50
0041Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$8,500.00$16,000$17,988$20,000$21,000$25,710
ARDOT contract 061856: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way