ARDOT contract 061467 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT TWO STRUCTURES ON HIGHWAYS 63 AND 70 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEM, EARTHWORK, AGGREGATE BASE COURSE, ACHM BASE, BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, MAINTENANCE OF TRAFFIC, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKINGS, CONSTRUCT TWO QUINTUPLE RC BOX CULVERTS (TOTAL LENGTH 125.46'), AND MISC. ITEMS. Let by Arkansas DOT on May 21, 2025, Prairie. 3 bids received; low bid $6,459,681 by Redstone Construction Group, Inc..

Owner
Arkansas DOT
Letting
21 MAY 2025
Pay items
53
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Redstone Construction Group, Inc.$6,459,681Low
2James A. Rogers Excavating, Inc.$7,217,085+12%
3Mobley Contractors, Inc.$7,934,027+23%
ARDOT contract 061467: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Redstone Construction Group, Inc.2. James A. Rogers Excavating, Inc.3. Mobley Contractors, Inc.
0001Removal and disposal of fence (202011)LF245$14.77$5.65$51.33
0002Unclassified excavation (210213)CY39,898$17.19$15.00$19.92
0003Compacted embankment (210611)CY52,664$19.71$15.74$22.28
0004Aggregate base course (class 7) (303117)TON26,034$41.65$43.66$48.06
0005Tack coat (401011)GAL1,228$7.00$3.99$3.92
0006Mineral aggregate in achm base course (1 1/2") (405161)TON38$60.00$155.30$152.46
0007Asphalt binder (PG 64-22) in achm base course (1 1/2") (minimum bid $120.00) (405402)TON2$1,200.00$128.34$126.00
0008Mineral aggregate in achm binder course (1") (406161)TON4,102$60.00$100.01$98.19
0009Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON175$1,200.00$123.50$126.00
0010Mineral aggregate in achm surface course (1/2") (407162)TON2,844$148.00$112.58$110.52
0011Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON172$120.00$123.50$126.00
0012Cold milling asphalt pavement (412002)SY1,667$11.64$5.69$5.59
0013Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$300,000$341,292$268,835
0014Furnishing field office (602011)EACH1$118,410$43,791$41,215
0015Maintenance of traffic (603009)LS1$181,000$462,929$172,309
001612" temporary culvert (603013)LF200$52.41$71.59$71.62
001724" temporary culvert (603024)LF60$87.29$84.19$96.83
001821" X 15" temporary culvert (603121)LF112$100.76$165.32$183.77
001928" X 20" temporary culvert (603128)LF53$135.70$94.15$100.61
0020Signs (604003)SF591$4.73$6.36$5.25
0021Barricades (604013)LF160$15.75$16.04$23.10
0022Traffic drums (604023)EACH67$26.25$26.74$26.25
0023Furnishing and installing precast concrete barrier (604031)LF214$68.25$83.65$68.25
0024Construction pavement markings (604041)LF57,595$0.21$0.21$0.19
0025Removable construction pavement markings (604051)LF12,048$1.05$1.07$1.55
0026Removal of permanent pavement markings (604061)LF6,222$1.26$1.28$0.84
002712" side drain (606701)LF30$114.47$71.59$71.62
002818" side drain (606703)LF68$113.71$89.73$88.92
002924" side drain (606704)LF54$92.54$102.33$104.24
003021" X 15" side drain (606721)LF72$110.72$101.22$99.30
0031Installation of precast reinforced concrete box culverts (10' X 10') (607302)LF250$2,675.00$5,323.01$5,264.13
0032Wire fence (type C) (619027)LF230$10.35$10.55$10.35
0033Lime (620001)TON126$60.00$80.22$78.75
0034Seeding (620011)ACRE62.94$951.26$1,356.55$1,331.77
0035Mulch cover (620022)ACRE235.20$622.30$950.82$933.45
0036Water (620030)MGAL9,935.30$5.00$5.35$5.25
0037Temporary seeding (621001)ACRE172.26$516.75$736.91$723.45
0038Silt fence (621021)LF11,392$3.49$3.55$3.49
0039Sand bag ditch checks (621031)BAG506$11.86$12.68$12.45
0040Sediment removal and disposal (621111)CY470$25.00$25.43$26.70
0041Rock ditch checks (621151)CY84$108.83$134.59$141.32
0042Second seeding application (623001)ACRE62.94$340.00$454.55$446.25
0043Solid sodding (624001)SY115$15.44$17.45$12.97
0044Roadway construction control (635001)LS1$40,847$143,004$249,567
0045Rumble stripes in asphalt shoulders (642011)LF6,370$0.26$0.27$0.79
0046Centerline rumble stripes in asphalt roadways (642102)LF1,200$0.30$0.27$0.79
0047Thermoplastic pavement marking white (6") (719002)LF11,594$0.90$0.80$0.71
0048Thermoplastic pavement marking yellow (6") (719102)LF11,594$0.90$0.80$0.71
0049Raised pavement markers (type II) (721002)EACH494$6.00$5.35$4.20
0050Temporary impact attenuation barrier (731071)EACH1$9,691.07$5,882.47$5,250.00
0051Unclassified excavation for structures-roadway (801101)CY772$45.00$106.95$655.44
0052Class S concrete-roadway (802012)CY229.30$3,141.11$2,573.31$2,257.62
0053Reinforcing steel-roadway (grade 60) (804003)LB22,074$2.75$4.94$4.63
ARDOT contract 061467: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of May 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy