ARDOT contract C46004 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.50 MILE OF EUCLID STREET IN THE CITY OF TEXARKANA IN MILLER COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Miller. 3 bids received; low bid $312,805 by Redstone Construction Group, Inc..

Owner
Arkansas DOT
Letting
15 JAN 2025
Pay items
11
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Redstone Construction Group, Inc.$312,805Low
2Tri State Asphalt, Inc.$346,340+11%
3R. K. Hall, LLC$453,617+45%
ARDOT contract C46004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Redstone Construction Group, Inc.2. Tri State Asphalt, Inc.3. R. K. Hall, LLC
0001Tack coat (401011)GAL1,056$0.10$6.00$10.00
0002Mineral aggregate in achm surface course (3/8") (407161)TON1,245$173.02$162.00$260.00
0003Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON75$120.00$250.00$200.00
0004Cold milling asphalt pavement (412001)SY13,200$2.98$3.90$3.80
0005Achm patching of existing roadway (415011)TON50$398.70$250.00$250.00
0006Maintenance of traffic (603001)LS1$11,373$12,000$20,000
0007Signs (604003)SF48$12.00$8.00$15.00
0008Reflectorized paint pavement marking white (4") (718001)LF1,320$0.55$4.00$0.50
0009Reflectorized paint pavement marking white (12") (718005)LF360$4.00$5.00$5.00
0010Reflectorized paint pavement marking yellow (4") (718101)LF5,280$0.55$4.00$0.50
0011Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$12,000$15,000$15,877
ARDOT contract C46004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy