ARDOT contract SA0563 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.26 MILES OF COUNTY ROAD 47 IN BOONE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ACHM PATCHING, PAVEMENT MARKING, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on August 13, 2025, Boone. 3 bids received; low bid $516,856 by Apac-Central, Inc..

Owner
Arkansas DOT
Letting
13 AUG 2025
Pay items
12
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Apac-Central, Inc.$516,856Low
2Atlas Asphalt, Inc.$554,156+7.0%
3Tri State Asphalt, Inc.$853,932+65%
ARDOT contract SA0563: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Apac-Central, Inc.2. Atlas Asphalt, Inc.3. Tri State Asphalt, Inc.
0001Aggregate base course (class 7) (303117)TON516$40.00$32.50$65.00
0002Tack coat (401011)GAL3,759$0.01$3.50$6.00
0003Mineral aggregate in achm surface course (1/2") (407162)TON4,648$89.00$99.83$147.00
0004Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON297$120.00$120.00$147.00
0005Achm patching of existing roadway (415011)TON20$205.00$200.00$250.00
0006Maintenance of traffic (603009)LS1$11,500$2,656.41$12,500
0007Signs (604003)SF208$12.42$8.50$8.50
0008Reflectorized paint pavement marking white (4") (718001)LF34,426$0.13$0.14$0.14
0009Reflectorized paint pavement marking yellow (4") (718101)LF34,426$0.13$0.14$0.14
0010Standard sign (726002)SF48$31.05$22.00$22.00
0011Channel post sign support (type C) (729003)EACH12$103.50$80.00$80.00
0012Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$17,000$4,499.78$40,000
ARDOT contract SA0563: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of August 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy