ARDOT contract A30028 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 9.327 MILES OF HIGHWAY 278 IN HOWARD COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING OF ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on April 8, 2026, Howard. 4 bids received; low bid $5,437,761 by Blackstone Construction, LLC.
- Owner
- Arkansas DOT
- Letting
- 08 APR 2026
- Pay items
- 49
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blackstone Construction, LLC | $5,437,761 | Low |
| 2 | Cranford Construction Co. | $5,720,833 | +5.0% |
| 3 | R. K. Hall, LLC | $6,040,722 | +11% |
| 4 | Redstone Construction Group, Inc. | $6,515,645 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blackstone Construction, LLC | 2. Cranford Construction Co. | 3. R. K. Hall, LLC | 4. Redstone Construction Group, Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Removal and disposal of guardrail (202132) | LF | 1,420 | $12.00 | $12.00 | $12.60 | $12.00 |
| 0002 | Unclassified excavation (210213) | CY | 379 | $75.00 | $1.03 | $25.00 | $75.00 |
| 0003 | Compacted embankment (210611) | CY | 5,280 | $29.72 | $1.03 | $25.00 | $30.00 |
| 0004 | Trenching and shoulder preparation (215011) | STA | 438 | $250.00 | $112.74 | $330.58 | $311.24 |
| 0005 | Aggregate base course (class 7) (303117) | TON | 3,599 | $50.01 | $64.18 | $70.22 | $70.36 |
| 0006 | Tack coat (401011) | GAL | 36,344 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0007 | Mineral aggregate in achm binder course (1") (406161) | TON | 4,549 | $132.85 | $105.75 | $149.85 | $145.33 |
| 0008 | Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412) | TON | 204 | $120.00 | $1,006.00 | $120.00 | $600.00 |
| 0009 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 24,848 | $127.75 | $142.93 | $141.62 | $150.25 |
| 0010 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 58 | $120.00 | $223.80 | $120.00 | $120.00 |
| 0011 | Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442) | TON | 1,526 | $120.00 | $139.77 | $120.00 | $120.00 |
| 0012 | Cold milling asphalt pavement (412002) | SY | 4,733 | $10.00 | $16.19 | $7.12 | $14.54 |
| 0013 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 235 | $25.00 | $136.46 | $170.00 | $379.03 |
| 0014 | Achm patching of existing roadway (415011) | TON | 200 | $241.62 | $230.99 | $170.00 | $329.81 |
| 0015 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $244,655 | $49,221 | $241,629 | $171,000 |
| 0016 | Maintenance of traffic (603009) | LS | 1 | $25,000 | $214,924 | $138,582 | $298,000 |
| 0017 | Signs (604003) | SF | 1,227 | $6.60 | $6.00 | $6.30 | $6.00 |
| 0018 | Barricades (604013) | LF | 48 | $27.50 | $25.00 | $26.25 | $25.00 |
| 0019 | Traffic drums (604023) | EACH | 21 | $49.50 | $45.00 | $47.25 | $45.00 |
| 0020 | Construction pavement markings (604041) | LF | 409,782 | $0.13 | $0.12 | $0.13 | $0.12 |
| 0021 | Construction pavement markings (railroad emblems) (604047) | EACH | 2 | $53.90 | $49.00 | $51.45 | $49.00 |
| 0022 | Guardrail (type A) (617005) | LF | 1,050 | $40.50 | $40.50 | $42.53 | $40.50 |
| 0023 | Guardrail terminal (type 2) (617312) | EACH | 12 | $4,000.00 | $4,000.00 | $4,200.00 | $4,000.00 |
| 0024 | Thrie beam guardrail terminal (617332) | EACH | 12 | $3,000.00 | $3,000.00 | $3,150.00 | $3,000.00 |
| 0025 | Lime (620001) | TON | 29 | $110.00 | $110.00 | $115.50 | $110.00 |
| 0026 | Seeding (620011) | ACRE | 14.62 | $1,286.39 | $1,286.39 | $1,350.71 | $1,286.39 |
| 0027 | Mulch cover (620022) | ACRE | 29.24 | $1,039.47 | $1,039.47 | $1,091.44 | $1,039.47 |
| 0028 | Water (620030) | MGAL | 1,789.40 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0029 | Temporary seeding (621001) | ACRE | 14.62 | $769.47 | $769.47 | $807.94 | $769.47 |
| 0030 | Silt fence (621021) | LF | 9,400 | $3.39 | $3.39 | $3.56 | $3.39 |
| 0031 | Sand bag ditch checks (621031) | BAG | 264 | $10.86 | $10.86 | $11.40 | $10.86 |
| 0032 | Sediment removal and disposal (621111) | CY | 360 | $50.00 | $6.40 | $36.15 | $10.00 |
| 0033 | Filter sock (18") (621169) | LF | 9,400 | $7.36 | $7.36 | $7.73 | $5.00 |
| 0034 | Wattle (20") (621173) | LF | 24 | $11.39 | $11.39 | $11.96 | $11.39 |
| 0035 | Roadway construction control (635011) | LS | 1 | $15,000 | $13,511 | $19,911 | $21,092 |
| 0036 | Mailboxes (637001) | EACH | 46 | $100.00 | $100.00 | $105.00 | $100.00 |
| 0037 | Mailbox supports (single) (637017) | EACH | 44 | $150.00 | $150.00 | $157.50 | $150.00 |
| 0038 | Mailbox supports (double) (637018) | EACH | 1 | $250.00 | $250.00 | $262.50 | $250.00 |
| 0039 | Rumble stripes in asphalt shoulders (642011) | LF | 72,839 | $0.21 | $0.11 | $0.12 | $0.11 |
| 0040 | Centerline rumble stripes in asphalt roadways (642102) | LF | 45,524 | $0.21 | $0.11 | $0.12 | $0.11 |
| 0041 | Portable traffic signal system - actuated (701603) | WEEK | 6 | $1,300.00 | $1,300.00 | $1,575.00 | $1,500.00 |
| 0042 | Thermoplastic pavement marking white (6") (719002) | LF | 102,016 | $0.77 | $0.70 | $0.74 | $0.70 |
| 0043 | Thermoplastic pavement marking white (12") (719005) | LF | 24 | $14.30 | $13.00 | $13.65 | $13.00 |
| 0044 | Thermoplastic pavement marking yellow (6") (719102) | LF | 102,876 | $0.50 | $0.45 | $0.47 | $0.45 |
| 0045 | Thermoplastic pavement marking (arrows) (719202) | EACH | 1 | $495.00 | $450.00 | $472.50 | $450.00 |
| 0046 | Thermoplastic pavement marking (railroad emblems) (719203) | EACH | 2 | $825.00 | $750.00 | $787.50 | $750.00 |
| 0047 | Raised pavement markers (type II) (721002) | EACH | 646 | $5.50 | $5.00 | $5.25 | $5.00 |
| 0048 | Standard sign (726002) | SF | 14 | $44.00 | $40.00 | $42.00 | $40.00 |
| 0049 | Channel post sign support (type A) (729001) | EACH | 2 | $110.00 | $100.00 | $105.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of April 8, 2026. Compiled by Mirage Metrics.