ARDOT contract 061938 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO PLACE GUARDRAILS ALONG VARIOUS INTERSTATES IN PULASKI COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, APPROACH GUTTER, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, AND MISC. ITEMS. Let by Arkansas DOT on September 23, 2026, Pulaski. 2 bids received; low bid $14,778,442 by Collins & Hermann, Inc..
- Owner
- Arkansas DOT
- Letting
- 23 SEP 2026
- Pay items
- 43
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Collins & Hermann, Inc. | $14,778,442 | Low |
| 2 | Redstone Construction Group, Inc. | $14,954,812 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Collins & Hermann, Inc. | 2. Redstone Construction Group, Inc. |
|---|---|---|---|---|---|
| 0001 | Removal and disposal of approach gutters (202052) | EACH | 80 | $3,574.79 | $6,500.00 |
| 0002 | Removal and disposal of guardrail (202132) | LF | 27,740 | $17.92 | $20.00 |
| 0003 | Removal and disposal of impact attenuation barrier (202143) | EACH | 3 | $3,648.28 | $5,000.00 |
| 0004 | Removal and disposal of concrete pier protection (202144) | LF | 190 | $192.01 | $225.00 |
| 0005 | Unclassified excavation (210213) | CY | 1,741 | $517.08 | $495.00 |
| 0006 | Aggregate base course (class 7) (303117) | TON | 6,762 | $150.67 | $131.45 |
| 0007 | Tack coat (401011) | GAL | 500 | $5.97 | $5.00 |
| 0008 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 1,458 | $1,022.41 | $850.00 |
| 0009 | Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442) | TON | 90 | $1,022.41 | $850.00 |
| 0010 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 250 | $269.06 | $600.00 |
| 0011 | Approach gutters (504264) | CY | 489.21 | $4,091.69 | $4,500.00 |
| 0012 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $396,785 | $705,000 |
| 0013 | Maintenance of traffic (603010) | LS | 1 | $2,076,908 | $2,870,000 |
| 0014 | Signs (604003) | SF | 7,046 | $16.14 | $15.00 |
| 0015 | Barricades (604013) | LF | 128 | $32.29 | $30.00 |
| 0016 | Traffic drums (604023) | EACH | 433 | $53.81 | $100.00 |
| 0017 | Furnishing and installing precast concrete barrier (604031) | LF | 4,019 | $34.61 | $50.00 |
| 0018 | Relocating precast concrete barrier (max. bid 25% of item number ) (604036) | LF | 71,738 | $8.65 | $12.50 |
| 0019 | Removable construction pavement markings (604051) | LF | 945 | $5.92 | $5.00 |
| 0020 | Removal of permanent pavement markings (604061) | LF | 700 | $1.61 | $6.30 |
| 0021 | Advance warning arrow panel (604071) | DAY | 90 | $16.14 | $16.00 |
| 0022 | Portable changeable message sign (604078) | WEEK | 108 | $295.96 | $300.00 |
| 0023 | Mobile speed notification system (special) (604160) | EACH | 1 | $11,838 | $2,000.00 |
| 0024 | Guardrail (type A) (617005) | LF | 29,550 | $68.02 | $47.00 |
| 0025 | Terminal anchor posts (type 1) (617105) | EACH | 26 | $2,188.58 | $2,060.00 |
| 0026 | Guardrail terminal (type 2) (617312) | EACH | 86 | $6,231.91 | $4,480.50 |
| 0027 | Thrie beam guardrail terminal (617332) | EACH | 104 | $7,964.71 | $3,090.00 |
| 0028 | Lime (620001) | TON | 66 | $48.43 | $40.00 |
| 0029 | Seeding (620011) | ACRE | 32.93 | $1,452.76 | $1,200.00 |
| 0030 | Mulch cover (620022) | ACRE | 65.86 | $1,323.14 | $1,200.00 |
| 0031 | Water (620030) | MGAL | 4,030.70 | $5.38 | $5.00 |
| 0032 | Temporary seeding (621001) | ACRE | 32.93 | $738.60 | $685.00 |
| 0033 | Silt fence (621021) | LF | 5,620 | $4.19 | $5.00 |
| 0034 | Filter sock (12") (621168) | LF | 1,500 | $8.59 | $8.00 |
| 0035 | Wattle (20") (621173) | LF | 954 | $14.30 | $14.00 |
| 0036 | Concrete barrier wall (pier protection type A) (631054) | LF | 190 | $866.35 | $1,650.00 |
| 0037 | Enhanced thermoplastic pavement marking white (12") (719505) | LF | 700 | $15.61 | $13.00 |
| 0038 | Enhanced thermoplastic pavement marking yellow (6") (719602) | LF | 245 | $7.80 | $26.00 |
| 0039 | Raised pavement markers (type II) (721002) | EACH | 60 | $32.29 | $44.00 |
| 0040 | Temporary impact attenuation barrier (731071) | EACH | 3 | $8,609.80 | $25,000 |
| 0041 | Temporary impact attenuation barrier (repair) (731072) | EACH | 36 | $1,614.34 | $1,650.00 |
| 0042 | Temporary impact attenuation barrier (relocation) (731075) | EACH | 106 | $4,304.90 | $4,400.00 |
| 0043 | Reinforcing steel-roadway (grade 60) (804003) | LB | 51,671 | $10.89 | $4.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of September 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way