ARDOT contract A70034 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.443 MILES OF HIGHWAY 79 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF ITEM, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Columbia. 3 bids received; low bid $3,472,528 by Jet Asphalt & Rock Co., Inc..
- Owner
- Arkansas DOT
- Letting
- 26 FEB 2025
- Pay items
- 34
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Jet Asphalt & Rock Co., Inc. | $3,472,528 | Low |
| 2 | Redstone Construction Group, Inc. | $3,940,326 | +13% |
| 3 | Cranford Construction Co. | $4,040,595 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jet Asphalt & Rock Co., Inc. | 2. Redstone Construction Group, Inc. | 3. Cranford Construction Co. |
|---|---|---|---|---|---|---|
| 0001 | Removal and disposal of guardrail (202132) | LF | 1,900 | $8.00 | $9.60 | $11.47 |
| 0002 | Trenching and shoulder preparation (215011) | STA | 12 | $750.00 | $1,516.69 | $540.70 |
| 0003 | Aggregate base course (class 7) (303117) | TON | 2,906 | $60.00 | $56.71 | $67.99 |
| 0004 | Tack coat (401011) | GAL | 42,862 | $0.10 | $0.01 | $0.01 |
| 0005 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 19,706 | $123.00 | $147.75 | $149.92 |
| 0006 | Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442) | TON | 1,191 | $120.00 | $120.00 | $120.00 |
| 0007 | Cold milling asphalt pavement (412002) | SY | 7,960 | $5.25 | $7.74 | $5.03 |
| 0008 | Achm patching of existing roadway (415011) | TON | 200 | $250.00 | $411.79 | $313.39 |
| 0009 | Approach gutters (504264) | CY | 8.36 | $2,000.00 | $3,676.72 | $3,501.64 |
| 0010 | Maintenance of traffic (603009) | LS | 1 | $200,000 | $85,106 | $209,879 |
| 0011 | Signs (604003) | SF | 1,130 | $7.00 | $4.50 | $4.50 |
| 0012 | Traffic drums (604023) | EACH | 100 | $25.00 | $26.00 | $26.00 |
| 0013 | Construction pavement markings (604041) | LF | 232,320 | $0.16 | $0.16 | $0.23 |
| 0014 | Removable construction pavement markings (604051) | LF | 24 | $6.00 | $6.00 | $1.80 |
| 0015 | Guardrail (type A) (617005) | LF | 1,624 | $26.00 | $29.00 | $26.00 |
| 0016 | Guardrail terminal (type 2) (617312) | EACH | 4 | $2,500.00 | $3,000.00 | $2,500.00 |
| 0017 | Thrie beam guardrail terminal (617332) | EACH | 4 | $1,500.00 | $1,950.00 | $1,500.00 |
| 0018 | Lime (620001) | TON | 2 | $125.00 | $500.00 | $500.00 |
| 0019 | Seeding (620011) | ACRE | 1 | $1,887.29 | $1,800.00 | $1,800.00 |
| 0020 | Mulch cover (620022) | ACRE | 1 | $1,887.29 | $1,800.00 | $1,800.00 |
| 0021 | Water (620030) | MGAL | 102 | $10.00 | $10.00 | $10.00 |
| 0022 | Silt fence (621021) | LF | 1,200 | $3.96 | $4.50 | $4.50 |
| 0023 | Wattle (20") (621173) | LF | 1,170 | $13.29 | $12.00 | $12.00 |
| 0024 | Rumble strips in asphalt shoulders (642001) | LF | 45,952 | $0.17 | $0.25 | $0.25 |
| 0025 | Centerline rumble stripes in asphalt roadways (642102) | LF | 28,500 | $0.17 | $0.22 | $0.22 |
| 0026 | Portable traffic signal system - actuated (701603) | WEEK | 4 | $1,000.00 | $1,100.00 | $1,532.36 |
| 0027 | Thermoplastic pavement marking white (6") (719002) | LF | 116,160 | $0.83 | $0.83 | $0.68 |
| 0028 | Thermoplastic pavement marking white (12") (719005) | LF | 800 | $8.40 | $8.40 | $15.00 |
| 0029 | Thermoplastic pavement marking yellow (6") (719102) | LF | 116,160 | $0.44 | $0.44 | $0.68 |
| 0030 | Thermoplastic pavement marking (words) (719201) | EACH | 9 | $220.00 | $220.00 | $285.00 |
| 0031 | Thermoplastic pavement marking (arrows) (719202) | EACH | 9 | $210.00 | $210.00 | $265.00 |
| 0032 | Raised pavement markers (type II) (721002) | EACH | 395 | $4.75 | $4.75 | $4.00 |
| 0033 | Reinforcing steel-roadway (grade 60) (804003) | LB | 592 | $3.00 | $3.00 | $3.00 |
| 0034 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $84,696 | $103,485 | $28,576 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.