ARDOT contract A70040 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.039 MILES OF HIGHWAY 79 IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, RUMBLE STRIPES, PORTABLE TRAFFIC SIGNAL SYSTEM, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 5, 2025, Ouachita. 3 bids received; low bid $3,524,764 by Jet Asphalt & Rock Co., Inc..
- Owner
- Arkansas DOT
- Letting
- 05 NOV 2025
- Pay items
- 26
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Jet Asphalt & Rock Co., Inc. | $3,524,764 | Low |
| 2 | Cranford Construction Co. | $3,949,510 | +12% |
| 3 | Redstone Construction Group, Inc. | $4,055,561 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jet Asphalt & Rock Co., Inc. | 2. Cranford Construction Co. | 3. Redstone Construction Group, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Removal and disposal of walks (202072) | SY | 33 | $100.00 | $65.91 | $65.91 |
| 0002 | Removal and disposal of guardrail (202132) | LF | 1,964 | $3.00 | $14.50 | $9.50 |
| 0003 | Aggregate base course (class 7) (303117) | TON | 1,123 | $55.00 | $65.32 | $75.38 |
| 0004 | Tack coat (401011) | GAL | 45,061 | $0.01 | $0.01 | $0.01 |
| 0005 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 20,628 | $121.00 | $138.27 | $143.00 |
| 0006 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 63 | $120.00 | $120.00 | $120.00 |
| 0007 | Asphalt binder (PG 70-22) in achm surface course (3/8") (minimum bid $120.00) (407441) | TON | 1,371 | $120.00 | $120.00 | $120.00 |
| 0008 | Cold milling asphalt pavement (412002) | SY | 15,630 | $4.75 | $4.69 | $6.10 |
| 0009 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 278 | $200.00 | $131.29 | $200.00 |
| 0010 | Achm patching of existing roadway (415011) | TON | 200 | $240.00 | $197.80 | $200.00 |
| 0011 | Approach gutters (504264) | CY | 48.60 | $1,800.00 | $2,565.48 | $2,693.75 |
| 0012 | Maintenance of traffic (603009) | LS | 1 | $150,000 | $207,524 | $138,256 |
| 0013 | Signs (604003) | SF | 1,608 | $5.00 | $6.00 | $6.00 |
| 0014 | Traffic drums (604023) | EACH | 135 | $23.00 | $35.00 | $30.72 |
| 0015 | Construction pavement markings (604041) | LF | 31,680 | $0.20 | $0.14 | $0.14 |
| 0016 | Guardrail (type A) (617005) | LF | 2,498 | $41.35 | $41.35 | $33.00 |
| 0017 | Guardrail terminal (type 2) (617312) | EACH | 12 | $4,011.56 | $4,011.56 | $3,200.00 |
| 0018 | Wheelchair ramps (type 2) (641019) | SY | 33 | $255.00 | $498.63 | $498.63 |
| 0019 | Rumble stripes in asphalt shoulders (642011) | LF | 99,750 | $0.14 | $0.28 | $0.14 |
| 0020 | Centerline rumble stripes in asphalt roadways (642102) | LF | 49,875 | $0.14 | $0.28 | $0.14 |
| 0021 | Portable traffic signal system - actuated (701603) | WEEK | 10 | $1,500.00 | $2,150.11 | $2,150.11 |
| 0022 | Reflectorized paint pavement marking white (6") (718002) | LF | 118,648 | $0.26 | $0.17 | $0.17 |
| 0023 | Reflectorized paint pavement marking yellow (6") (718102) | LF | 117,491 | $0.24 | $0.15 | $0.15 |
| 0024 | Raised pavement markers (type II) (721002) | EACH | 996 | $4.50 | $4.00 | $4.00 |
| 0025 | Reinforcing steel-roadway (grade 60) (804003) | LB | 3,888 | $1.85 | $3.00 | $3.00 |
| 0026 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $85,970 | $35,637 | $116,217 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of November 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.