ARDOT contract 061510 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO MAKE IMPROVEMENTS TO THE EXISTING TRAFFIC SIGNAL AT HIGHWAY 70 AND UNIVERSITY AVE. INTERSECTION IN THE CITY OF LITTLE ROCK IN PULASKI COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, PORTLAND CEMENT CONCRETE BASE, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, PAVEMENT REPAIR OVER CULVERTS, EROSION CONTROL, CONCRETE ISLAND, WALKS, CURB AND GUTTER, TRAFFIC SIGNAL ITEMS, PAVEMENT MARKINGS, AND MISC. ITEMS. Let by Arkansas DOT on September 17, 2025, Pulaski. 2 bids received; low bid $2,177,839 by Redstone Construction Group, Inc..
- Owner
- Arkansas DOT
- Letting
- 17 SEP 2025
- Pay items
- 103
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Redstone Construction Group, Inc. | $2,177,839 | Low |
| 2 | McGeorge Contracting Co., Inc. | $3,774,221 | +73% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Redstone Construction Group, Inc. | 2. McGeorge Contracting Co., Inc. |
|---|---|---|---|---|---|
| 0001 | Removal and disposal of curb (202001) | LF | 511 | $27.77 | $50.46 |
| 0002 | Removal and disposal of curb and gutter (202003) | LF | 185 | $47.78 | $50.46 |
| 0003 | Removal and disposal of concrete islands (202047) | SY | 67 | $186.57 | $144.78 |
| 0004 | Removal and disposal of walks (202072) | SY | 136 | $80.14 | $126.22 |
| 0005 | Removal and disposal of junction boxes (202092) | EACH | 2 | $2,959.18 | $3,617.47 |
| 0006 | Removal and disposal of drop inlets (202093) | EACH | 3 | $3,359.37 | $3,619.29 |
| 0007 | Removal and disposal of pipe culverts (202096) | EACH | 6 | $1,807.25 | $3,617.44 |
| 0008 | Unclassified excavation (210213) | CY | 301 | $189.10 | $1,474.10 |
| 0009 | Compacted embankment (210611) | CY | 229 | $289.32 | $479.87 |
| 0010 | Soil stabilization (210702) | TON | 10 | $688.51 | $1,515.08 |
| 0011 | Aggregate base course (class 7) (303117) | TON | 15 | $178.80 | $54.87 |
| 0012 | Portland cement concrete base (5" uniform thickness) (309505) | SY | 70 | $200.04 | $515.51 |
| 0013 | Tack coat (401011) | GAL | 1,069 | $0.10 | $5.16 |
| 0014 | Mineral aggregate in achm base course (1 1/2") (405161) | TON | 45 | $365.78 | $644.52 |
| 0015 | Asphalt binder (PG 70-22) in achm base course (1 1/2") (minimum bid $120.00) (405412) | TON | 2 | $365.78 | $122.57 |
| 0016 | Mineral aggregate in achm binder course (1") (406161) | TON | 32 | $487.16 | $513.88 |
| 0017 | Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412) | TON | 1 | $487.16 | $122.57 |
| 0018 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 690 | $325.20 | $247.49 |
| 0019 | Asphalt binder (PG 76-22) in achm surface course (1/2") (minimum bid $120.00) (407452) | TON | 42 | $120.00 | $1,532.14 |
| 0020 | Cold milling asphalt pavement (412002) | SY | 6,033 | $5.98 | $17.46 |
| 0021 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 10 | $710.95 | $1,850.15 |
| 0022 | Achm patching of existing roadway (415011) | TON | 22 | $632.30 | $1,134.64 |
| 0023 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $100,000 | $134,993 |
| 0024 | Maintenance of traffic (603010) | LS | 1 | $348,000 | $958,464 |
| 0025 | Signs (604003) | SF | 387 | $11.00 | $10.00 |
| 0026 | Construction pavement markings (604041) | LF | 3,019 | $3.30 | $3.00 |
| 0027 | Construction pavement markings (words) (604045) | EACH | 4 | $220.00 | $200.00 |
| 0028 | Construction pavement markings (arrows) (604046) | EACH | 7 | $165.00 | $150.00 |
| 0029 | Vertical panels (604083) | EACH | 32 | $66.00 | $60.00 |
| 0030 | 48" reinforced concrete pipe culverts (class III) (605626) | LF | 40 | $694.41 | $383.79 |
| 0031 | 29" X 18" reinforced concrete arch pipe culverts (class IV) (605775) | LF | 20 | $431.39 | $261.71 |
| 0032 | 48" flared end sections for reinforced concrete pipe culverts (605866) | EACH | 2 | $5,599.88 | $6,109.46 |
| 0033 | 12" side drain (606701) | LF | 50 | $94.02 | $131.53 |
| 0034 | Selected pipe bedding (606994) | CY | 20 | $38.58 | $47.91 |
| 0035 | Drop inlets (type C) (609013) | EACH | 2 | $18,414 | $19,023 |
| 0036 | Drop inlets (type MO) (609134) | EACH | 6 | $9,011.23 | $7,800.22 |
| 0037 | Junction boxes (type ST) (609236) | EACH | 1 | $11,850 | $12,388 |
| 0038 | Drop inlet extensions (4') (609311) | EACH | 4 | $3,419.20 | $1,276.78 |
| 0039 | Drop inlet extensions (8') (609312) | EACH | 3 | $3,573.87 | $1,481.07 |
| 0040 | Yard drains (609511) | EACH | 1 | $4,898.24 | $5,129.33 |
| 0041 | Pavement repair over culverts (asphalt) (615022) | TON | 3 | $2,547.95 | $1,300.32 |
| 0042 | Lime (620001) | TON | 1 | $550.00 | $500.00 |
| 0043 | Seeding (620011) | ACRE | 0.19 | $8,690.00 | $7,900.00 |
| 0044 | Mulch cover (620022) | ACRE | 0.60 | $5,830.00 | $5,300.00 |
| 0045 | Water (620030) | MGAL | 34 | $10.00 | $10.00 |
| 0046 | Temporary seeding (621001) | ACRE | 0.41 | $4,180.00 | $3,800.00 |
| 0047 | Silt fence (621021) | LF | 321 | $12.10 | $11.00 |
| 0048 | Sediment removal and disposal (621111) | CY | 13 | $20.74 | $8.83 |
| 0049 | Rock ditch checks (621151) | CY | 6 | $221.43 | $488.56 |
| 0050 | Filter sock (12") (621168) | LF | 316 | $16.50 | $15.00 |
| 0051 | Second seeding application (623001) | ACRE | 0.19 | $5,000.00 | $5,000.00 |
| 0052 | Solid sodding (624001) | SY | 497 | $11.55 | $10.50 |
| 0053 | Concrete island (632011) | SY | 111 | $336.42 | $1,346.51 |
| 0054 | Concrete walks (633011) | SY | 293 | $173.20 | $580.94 |
| 0055 | Concrete combination curb and gutter (type A) (1' 6") (634201) | LF | 805 | $68.41 | $200.39 |
| 0056 | Roadway construction control (635001) | LS | 1 | $55,000 | $123,182 |
| 0057 | Wheelchair ramps (type 3) (641020) | SY | 24 | $1,313.48 | $1,278.28 |
| 0058 | Wheelchair ramps (type 6) (641023) | SY | 10 | $873.61 | $1,506.34 |
| 0059 | System local controller TS2-type 2, E-net (8 phases) (701227) | EACH | 1 | $47,377 | $56,709 |
| 0060 | Traffic signal controller (modification) (701401) | EACH | 1 | $5,192.00 | $7,594.94 |
| 0061 | Ethernet switch, T100 hardened (8-port) (701722) | EACH | 1 | $3,894.00 | $3,544.30 |
| 0062 | Traffic signal head, LED, (3 section, 1 way) (706039) | EACH | 16 | $1,752.30 | $1,417.72 |
| 0063 | Central control unit (707006) | EACH | 1 | $6,490.00 | $3,949.37 |
| 0064 | Pole mounted assembly (707007) | EACH | 4 | $1,752.30 | $1,160.51 |
| 0065 | Countdown pedestrian signal head, LED (707015) | EACH | 4 | $1,492.70 | $1,063.29 |
| 0066 | Traffic signal cable (3C/14 A.W.G.) (708004) | LF | 2,034 | $3.25 | $3.54 |
| 0067 | Traffic signal cable (5C/12 A.W.G.) (708007) | LF | 1,083 | $4.54 | $3.80 |
| 0068 | Traffic signal cable (5C/14 A.W.G.) (708008) | LF | 1,504 | $3.89 | $3.54 |
| 0069 | Traffic signal cable (12C/14 A.W.G.) (708022) | LF | 827 | $10.38 | $5.06 |
| 0070 | Traffic signal cable (20C/14 A.W.G.) (708038) | LF | 359 | $14.28 | $6.58 |
| 0071 | Electrical conductors-in-conduit (1C/8 A.W.G., E.G.C.) (708207) | LF | 872 | $3.58 | $2.53 |
| 0072 | Electrical conductors-in-conduit (2C/8 A.W.G., E.G.C.) (708212) | LF | 60 | $6.49 | $5.06 |
| 0073 | Electrical conductors-in-conduit (2C/6 A.W.G.) (708217) | LF | 48 | $9.74 | $5.06 |
| 0074 | Electrical conductors for luminaires (708451) | LF | 200 | $7.29 | $2.53 |
| 0075 | Galvanized steel conduit (2") (709004) | LF | 20 | $77.88 | $50.63 |
| 0076 | Non-metallic conduit (2") (710004) | LF | 482 | $41.54 | $20.25 |
| 0077 | Non-metallic conduit (3") (710005) | LF | 1,033 | $51.92 | $50.63 |
| 0078 | Concrete pull box (type 2) (711004) | EACH | 3 | $1,947.00 | $1,215.19 |
| 0079 | Concrete pull box (type 3) (711005) | EACH | 1 | $2,401.30 | $1,822.78 |
| 0080 | Concrete pull box (type 1 HD) (711104) | EACH | 1 | $2,141.70 | $2,784.81 |
| 0081 | Concrete pull box (type 2 HD) (711105) | EACH | 3 | $2,271.50 | $2,784.81 |
| 0082 | Concrete pull box (type 3 HD) (711106) | EACH | 7 | $2,985.40 | $3,037.97 |
| 0083 | Traffic signal mast arm and pole with foundation (30') (714030) | EACH | 1 | $32,450 | $30,380 |
| 0084 | Traffic signal mast arm and pole with foundation (34') (714034) | EACH | 1 | $33,748 | $32,405 |
| 0085 | Traffic signal mast arm and pole with foundation (44') (714044) | EACH | 1 | $40,238 | $36,456 |
| 0086 | Traffic signal mast arm and pole with foundation (46') (714046) | EACH | 1 | $41,212 | $38,481 |
| 0087 | Traffic signal mast arm and pole with foundation (54') (714054) | EACH | 1 | $45,430 | $42,532 |
| 0088 | High mast LED fixture (86,000 lumens) (714678) | EACH | 6 | $3,448.27 | $5,063.29 |
| 0089 | Traffic signal mast arm and pole with foundation (8'-8') (714912) | EACH | 1 | $35,046 | $28,354 |
| 0090 | Traffic signal pedestal pole with foundation (715011) | EACH | 3 | $4,867.50 | $6,582.28 |
| 0091 | Pedestal type service point (100 amp) (715109) | EACH | 1 | $24,013 | $29,873 |
| 0092 | Removal of traffic signal equipment (715704) | LS | 1 | $4,543.00 | $15,190 |
| 0093 | Reflectorized paint pavement marking white (12") (718005) | LF | 342 | $5.23 | $4.75 |
| 0094 | Reflectorized paint pavement marking yellow (12") (718105) | LF | 150 | $5.23 | $4.75 |
| 0095 | Thermoplastic pavement marking white (6") (719002) | LF | 1,856 | $2.20 | $2.00 |
| 0096 | Thermoplastic pavement marking white (12") (719005) | LF | 643 | $8.80 | $8.00 |
| 0097 | Thermoplastic pavement marking yellow (6") (719102) | LF | 545 | $2.20 | $2.00 |
| 0098 | Thermoplastic pavement marking (words) (719201) | EACH | 5 | $385.00 | $350.00 |
| 0099 | Thermoplastic pavement marking (arrows) (719202) | EACH | 9 | $330.00 | $300.00 |
| 0100 | Raised pavement markers (type II) (721002) | EACH | 28 | $33.00 | $30.00 |
| 0101 | Video detection system (733012) | EACH | 1 | $103,840 | $114,025 |
| 0102 | Video cable (exterior cat 5E) (733035) | LF | 2,034 | $2.60 | $4.05 |
| 0103 | 18" reinforced concrete pipe culverts (class III) (605601) | LF | 148 | $277.03 | $110.42 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of September 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.