ARDOT contract A90041 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 7.625 MILES OF HIGHWAY 65 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, GUARDRAIL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 5, 2025, Searcy. 2 bids received; low bid $2,751,148 by Apac-Central, Inc..

Owner
Arkansas DOT
Letting
05 NOV 2025
Pay items
30
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Apac-Central, Inc.$2,751,148Low
2Atlas Asphalt, Inc.$2,858,302+4.0%
ARDOT contract A90041: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Apac-Central, Inc.2. Atlas Asphalt, Inc.
0001Removal and disposal of guardrail (202132)LF3,800$12.80$12.39
0002Aggregate base course (class 7) (303117)TON500$28.00$53.41
0003Tack coat (401011)GAL31,916$0.01$0.01
0004Mineral aggregate in achm surface course (1/2") (407162)TON19,433$87.00$97.88
0005Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON18$120.00$120.00
0006Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON1,201$120.00$120.00
0007Cold milling asphalt pavement (412002)SY187,744$1.75$1.14
0008Achm patching of existing roadway (415011)TON50$225.00$120.00
0009Maintenance of traffic (603009)LS1$30,000$68,744
0010Signs (604003)SF655$12.40$12.00
0011Construction pavement markings (604041)LF192,834$0.19$0.18
0012Construction pavement markings (words) (604045)EACH4$103.30$100.00
0013Construction pavement markings (arrows) (604046)EACH4$77.47$75.00
0014Tubular markers (604049)EACH24$77.47$75.00
0015Guardrail (type A) (617005)LF3,050$39.28$38.03
0016Guardrail terminal (type 2) (617312)EACH22$3,810.49$3,688.86
0017Thrie beam guardrail terminal (617332)EACH8$2,783.45$2,694.60
0018Rumble strips in asphalt shoulders (642001)LF7,994$0.14$0.19
0019Rumble stripes in asphalt shoulders (642011)LF55,949$0.14$0.14
0020Centerline rumble stripes in asphalt roadways (642102)LF41,148$0.14$0.08
0021Thermoplastic pavement marking white (6") (719002)LF90,693$0.60$0.58
0022Thermoplastic pavement marking white (8") (719003)LF180$1.29$1.25
0023Thermoplastic pavement marking white (12") (719005)LF49$20.66$20.00
0024Thermoplastic pavement marking yellow (6") (719102)LF93,391$0.60$0.58
0025Thermoplastic pavement marking (yield line) (719200)LF18$25.82$25.00
0026Thermoplastic pavement marking (words) (719201)EACH4$361.54$350.00
0027Thermoplastic pavement marking (arrows) (719202)EACH4$309.89$300.00
0028Raised pavement markers (type II) (721002)EACH762$6.20$6.00
0029Omni-directional breakaway sign supports (type G-1) (730499)EACH2$4,454.11$4,527.60
0030Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$65,000$45,973
ARDOT contract A90041: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of November 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy