ARDOT contract SA1363 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 1.70 MILES OF BANKS RD. & 1.75 MILES OF HARRELSON RD. IN CLEVELAND COUNTY. THIS PROJECT CONSISTS OF FOG SEAL, ASPHALT SURFACE TREATMENT, ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on May 20, 2026, Cleveland. 1 bid received; low bid $476,580 by Salt Creek Paving & Const. Co., Inc..

Owner
Arkansas DOT
Letting
20 MAY 2026
Pay items
14
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Salt Creek Paving & Const. Co., Inc.$476,580Low
ARDOT contract SA1363: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Salt Creek Paving & Const. Co., Inc.
0001Aggregate base course (class 7) (303117)TON20$100.00
0002Fog seal (type 2) (401005)GAL4,048$6.50
0003Tack coat (401011)GAL1,830$4.00
0004Mineral aggregate in asphalt surface treatment (class 2) (402112)TON708$113.50
0005Polymer modified cationic emulsified asphalt (CRS-2P) (solid polymer) (402214)GAL16,192$4.85
0006Mineral aggregate in achm surface course (3/8") (407161)TON1,141$183.00
0007Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON79$183.00
0008Achm patching of existing roadway (415011)TON70$315.00
0009Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$15,950
0010Maintenance of traffic (603009)LS1$3,000.00
0011Signs (604003)SF347$8.50
0012Reflectorized paint pavement marking yellow (4") (718101)LF36,432$0.30
0013Standard sign (726002)SF48$40.00
0014Channel post sign support (type C) (729003)EACH10$200.00
ARDOT contract SA1363: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of May 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy