CDOT letting results, August 8, 2024

2 contracts let by Colorado DOT on August 8, 2024, $1,423,498 in low bids, a median of 2.5 bidders per contract. On the 2 with an engineer's estimate, the low bid came in under it 2 times; median low bid -12% against the estimate.

Owner
Colorado DOT
Contracts
2
Low bids, total
$1,423,498
Data through
10 SEP 2026

Contracts let that day

ContractProjectRegionBidsLow bidderLow bidSecond bidGapAgainst estimateSource
C26419US 160 MP 174.0 WOLF CREEK TUNNEL PORTAL DRAINAGE REPAIR A NON-MANDATORY PRE-BID CONFERENCE WILL BE HELD VIRTUALLY VIA GOOGLE MEET ON AUGUST 1, 2024 BEGINNING ARegion 51HANK WILLIAMS, INC. dba WILLIAMS CONSTRUCTION CONTRACTORS$986,914-13%CDOT
C26089SH 040A IN MOFFAT COUNTY CRACK SEAL SH40 MP 7.0 TO MO 21.0, BOTH DIRECTIONS CDOT SECTION 6 - CRAIGRegion 34A-1 Chipseal Company$436,584$468,000+7.0%-11%CDOT
CDOT contracts let on August 8, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy