Fiber optic connection hardware, f&i, buffer tube fan out kit unit price, Florida

Low bidders on FDOT contracts carried a median of $105.00 per EACH for item 0633-3-14, fiber optic connection hardware, f&i, buffer tube fan out kit, over the 24 months to 28 OCT 2026, across 48 low bids. Half of all 215 bids fell between $100.00 and $125.00.

Owner
Florida DOT
Item
0633-3-14
Unit
EACH
Latest letting
28 OCT 2026
$105.00Low bidder's median, per EACH
$111.02Median of all bids, per EACH
47Contracts in the window

By year of letting

Fiber optic connection hardware, f&i, buffer tube fan out kit, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20181618$91.8082$94.42
20191516$85.4771$90.00
20201616$93.8577$90.00
20212323$93.1393$96.34
20222525$94.9073$101.10
20232929$135.0067$133.00
20242527$130.00106$128.69
20251819$106.3883$114.20
20262626$102.04125$110.00
Fiber optic connection hardware, f&i, buffer tube fan out kit, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Fiber optic connection hardware, f&i, buffer tube fan out kit, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 514$107.5068$110.29
District 79$104.0049$112.00
District 210$98.9836$106.50
District 44$106.3826$117.22
District 17$115.0023$105.21
District 33$106.239$111.00
Fiber optic connection hardware, f&i, buffer tube fan out kit, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Fiber optic connection hardware, f&i, buffer tube fan out kit, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 112$103.00
2 to 312$106.38
3 to 712$102.00
8 to 3612$108.12
Fiber optic connection hardware, f&i, buffer tube fan out kit, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Fiber optic connection hardware, f&i, buffer tube fan out kit
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T5894District 52$110.00$110.005AUM CONSTRUCTION INC.FDOT
28 OCT 2026T7616District 71$91.80$111.025CHINCHOR ELECTRIC INC.FDOT
30 SEP 2026T6398District 61$102.00$104.004OHLA USA INCFDOT
26 AUG 2026T5890District 52$105.00$107.506WATSON CIVIL CONSTRUCTION, INC.FDOT
29 JUL 2026T5883District 520$160.50$160.009MASCI GENERAL CONTRACTORS, INCFDOT
15 JUN 2026T5885District 513$87.00$90.254C.W. ROBERTS CONTRACTING, INC.FDOT
10 JUN 2026T2A63District 22$150.00$143.614MAER HOMES, LLCFDOT
10 JUN 2026T5888District 58$110.00$100.068C.W. ROBERTS CONTRACTING, INC.FDOT
20 MAY 2026T4666District 414$94.92$119.698OHLA USA INCFDOT
29 APR 2026T5880District 52$104.00$117.003HALIFAX PAVING, INC.FDOT
29 APR 2026T5881District 516$184.46$155.232MASCI GENERAL CONTRACTORS, INCFDOT
29 APR 2026T7562District 75$104.00$120.007WATSON CIVIL CONSTRUCTION, INC.FDOT
29 APR 2026T7611District 72$122.61$120.289PREFERRED MATERIALS INC.FDOT
31 MAR 2026T3845District 37$100.00$110.504PHOENIX CONSTRUCTION SERVICES, INC.FDOT
25 MAR 2026T1934District 11$85.02$107.004AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
Latest FDOT contracts carrying Fiber optic connection hardware, f&i, buffer tube fan out kit

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy