Fiber optic connection hardware, f&i, preterminated connector assembly unit price, Florida

Low bidders on FDOT contracts carried a median of $63.59 per EACH for item 0633-3-13, fiber optic connection hardware, f&i, preterminated connector assembly, over the 24 months to 28 OCT 2026, across 44 low bids. Half of all 206 bids fell between $58.41 and $87.00.

Owner
Florida DOT
Item
0633-3-13
Unit
EACH
Latest letting
28 OCT 2026
$63.59Low bidder's median, per EACH
$67.00Median of all bids, per EACH
41Contracts in the window

By year of letting

Fiber optic connection hardware, f&i, preterminated connector assembly, FDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
2018810$60.9135$66.30
20191111$54.4050$50.00
2020910$46.4555$44.00
20211616$53.3981$50.43
20222122$55.7372$59.75
20231717$60.0057$59.60
20241819$69.2076$64.42
20252124$62.09110$64.02
20261616$87.0084$78.00
Fiber optic connection hardware, f&i, preterminated connector assembly, FDOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By district

Fiber optic connection hardware, f&i, preterminated connector assembly, FDOT: unit prices by district, last 24 months
DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 515$59.4069$61.00
District 413$58.0069$70.00
District 19$83.0835$83.08
District 74$99.0919$106.00
Fiber optic connection hardware, f&i, preterminated connector assembly, FDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Fiber optic connection hardware, f&i, preterminated connector assembly, FDOT: low bidder's median by quantity band
Quantity (EACH)Low bidsLow-bid median
1 to 411$106.17
7 to 2411$63.18
36 to 8811$60.97
96 to 49211$59.59
Fiber optic connection hardware, f&i, preterminated connector assembly, FDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest FDOT contracts carrying Fiber optic connection hardware, f&i, preterminated connector assembly
LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
28 OCT 2026T4765District 44$107.00$108.506GENERAL ASPHALT COMPANY, LLCFDOT
29 JUL 2026T5891District 548$78.75$94.864MASCI GENERAL CONTRACTORS, INCFDOT
10 JUN 2026T5884District 5300$87.00$76.686C.W. ROBERTS CONTRACTING, INC.FDOT
10 JUN 2026T7534District 72$106.17$106.544PREFERRED MATERIALS INC.FDOT
20 MAY 2026T4666District 4168$55.84$63.348OHLA USA INCFDOT
20 MAY 2026T5882District 53$46.13$63.3810MASCI GENERAL CONTRACTORS, INCFDOT
29 APR 2026T5880District 597$67.50$69.213HALIFAX PAVING, INC.FDOT
29 APR 2026T7562District 73$92.00$106.007WATSON CIVIL CONSTRUCTION, INC.FDOT
29 APR 2026T7615District 71$4,599.15$4,336.184PREFERRED MATERIALS INC.FDOT
31 MAR 2026T3845District 37$563.00$620.004PHOENIX CONSTRUCTION SERVICES, INC.FDOT
25 MAR 2026T1920District 13$800.00$830.006SEMA CONSTRUCTION, INC.FDOT
25 MAR 2026T1925District 11$777.90$778.903AJAX PAVING INDUSTRIES OF FLORIDA LLCFDOT
25 FEB 2026T1813District 148$87.00$85.504SUPERIOR ASPHALT, INC.FDOT
25 FEB 2026T1916District 172$60.97$60.975PREFERRED MATERIALS INC.FDOT
25 FEB 2026T4739District 436$51.15$65.005RANGER CONSTRUCTION INDUSTRIES, INC.FDOT
Latest FDOT contracts carrying Fiber optic connection hardware, f&i, preterminated connector assembly

Filter this item by your own quantity, district and period, or check your price against it, in the FDOT explorer.

How these prices were read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are FDOT's own: this item is compared with FDOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy