IDOT contract 46948 bid tabulation
Section SPITLER/LTH. Let by Illinois DOT on April 24, 2026, Macon, District 07. 2 bids received; low bid $2,699,505 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 100
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $2,699,505 | Low |
| 2 | Kinney Contractors, Inc. | $2,828,625 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. | 2. Kinney Contractors, Inc. |
|---|---|---|---|---|---|
| 1 | Remov EX gate (X0300249) | EACH | 2 | $5,737.92 | $1,790.00 |
| 2 | Rem EX parking blocks (X0301339) | EACH | 222 | $108.73 | $290.00 |
| 3 | Prec conc park block (X0301430) | EACH | 231 | $329.53 | $380.00 |
| 4 | Tubular steel gate (X0323013) | EACH | 3 | $6,407.23 | $12,500 |
| 5 | Traffic counter (X0323388) | EACH | 2 | $9,988.53 | $36,000 |
| 6 | Info kiosk complete (X0326406) | EACH | 1 | $43,184 | $36,000 |
| 7 | Large entrance sign (X0327592) | EACH | 2 | $30,949 | $25,000 |
| 8 | Building wiring (X0328050) | LS | 1 | $9,988.53 | $40,000 |
| 9 | Restrain barr removal (X2300048) | EACH | 58 | $397.28 | $145.00 |
| 10 | Storm sewer removal (X5510100) | LF | 127 | $38.50 | $115.00 |
| 11 | Man TA 4 dia SPL F&G (X6022230) | EACH | 1 | $6,985.00 | $7,080.00 |
| 12 | Inlets TB W/SPL F&G (X6024502) | EACH | 1 | $3,025.00 | $3,830.00 |
| 13 | Traf cont & prot SPL (X7010216) | LS | 1 | $20,725 | $25,000 |
| 14 | Small entrance sign (X7200066) | EACH | 1 | $5,995.00 | $6,000.00 |
| 15 | Wood sin support SPL (X7300105) | LF | 208 | $82.50 | $85.00 |
| 16 | GFCI20A DX receptacle (X8005020) | EACH | 1 | $709.71 | $200.00 |
| 17 | Luminaire, type A SPL (X8212031) | EACH | 49 | $1,826.85 | $1,900.00 |
| 18 | Luminaire, type B SPL (X8212032) | EACH | 1 | $1,826.85 | $1,900.00 |
| 19 | Construction layout (Z0013798) | LS | 1 | $37,052 | $31,000 |
| 20 | Tree remov 6-15 (20100110) | UNIT | 27 | $70.40 | $500.00 |
| 21 | Tree remov over 15 (20100210) | UNIT | 42 | $90.20 | $650.00 |
| 22 | Tree remov acres (20100500) | ACRE | 0.10 | $31,460 | $230,000 |
| 23 | Earth excavation (20200100) | CY | 544 | $46.20 | $110.00 |
| 24 | Trench backfill (20800150) | CY | 46 | $149.60 | $206.50 |
| 25 | Topsoil F & P var DP (21101600) | SY | 3,114 | $8.80 | $25.00 |
| 26 | Grading & shap ditch (21400100) | LF | 856 | $12.65 | $25.50 |
| 27 | Seeding CL 2A (25000210) | ACRE | 0.70 | $7,315.00 | $2,000.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 61 | $1.87 | $5.50 |
| 29 | Phosphorus fert nutr (25000500) | LB | 61 | $1.87 | $8.50 |
| 30 | Potassium fert nutr (25000600) | LB | 61 | $1.87 | $10.50 |
| 31 | Mulch method 2 (25100115) | ACRE | 0.70 | $4,042.50 | $6,000.00 |
| 32 | Temp eros contr seed (28000250) | LB | 7 | $8.28 | $200.00 |
| 33 | Perimeter eros bar (28000400) | LF | 1,425 | $15.25 | $22.00 |
| 34 | Inlet & pipe protect (28000500) | EACH | 31 | $488.48 | $500.00 |
| 35 | Stone riprap CL B3 (28100125) | SY | 55 | $78.10 | $450.00 |
| 36 | Agg base cse B 8 (35102000) | SY | 2,304 | $59.15 | $31.00 |
| 37 | Agg surf course TY B (40200800) | TON | 77 | $184.13 | $163.00 |
| 38 | Bit matls PR CT (40600275) | LB | 5,993 | $1.45 | $2.15 |
| 39 | Bit matls tack CT (40600290) | LB | 13,964 | $1.04 | $1.50 |
| 40 | HMA surf rem butt JT (40600982) | SY | 191 | $49.03 | $170.00 |
| 41 | Temporary ramp (40600990) | SY | 29 | $31.83 | $360.00 |
| 42 | HMA BC IL-9.5FG N70 (40602970) | TON | 1,404 | $283.46 | $250.00 |
| 43 | HMA BC IL-19.0 N70 (40603085) | TON | 337 | $364.17 | $230.00 |
| 44 | HMA SC IL-9.5FG C N70 (40604002) | TON | 1,563 | $289.74 | $245.00 |
| 45 | PCC PVT 6 (42000100) | SY | 114 | $187.84 | $125.00 |
| 46 | Protective coat (42101300) | SY | 348 | $0.01 | $2.00 |
| 47 | PC conc sidewalk 6 (42400300) | SF | 3,562 | $28.13 | $20.00 |
| 48 | Detectable warnings (42400800) | SF | 30 | $57.53 | $50.00 |
| 49 | Pavement rem (44000100) | SY | 231 | $40.84 | $50.00 |
| 50 | Gutter rem (44000400) | LF | 592 | $21.92 | $28.00 |
| 51 | Comb curb gutter rem (44000500) | LF | 31 | $35.86 | $55.00 |
| 52 | Sidewalk rem (44000600) | SF | 1,637 | $13.58 | $3.50 |
| 53 | CL D patch T2 5 (44201705) | SY | 92 | $296.39 | $210.00 |
| 54 | CL D patch T3 5 (44201709) | SY | 37 | $296.39 | $210.00 |
| 55 | CL D patch T4 5 (44201711) | SY | 33 | $296.39 | $210.00 |
| 56 | Aggregate SHLDS B 6 (48101500) | SY | 62 | $63.75 | $100.00 |
| 57 | Agg wedge SHLD type B (48102100) | TON | 217 | $255.67 | $190.00 |
| 58 | Pipe culvert remov (50105220) | LF | 535 | $37.95 | $90.00 |
| 59 | P cul CL A 1 12 (542A0217) | LF | 152 | $106.70 | $127.00 |
| 60 | P cul CL A 1 15 (542A0220) | LF | 40 | $115.50 | $138.00 |
| 61 | P cul CL A 1 18 (542A0223) | LF | 104 | $129.80 | $145.00 |
| 62 | P cul CL A 1 24 (542A0229) | LF | 32 | $157.30 | $151.00 |
| 63 | P cul CL A 1 eqrs 18 (542A5473) | LF | 32 | $192.50 | $260.00 |
| 64 | P cul CL C 1 12 (542C0217) | LF | 8 | $166.10 | $200.00 |
| 65 | PRC flar end sec 12 (54213657) | EACH | 19 | $1,485.00 | $2,355.00 |
| 66 | PRC flar end sec 15 (54213660) | EACH | 2 | $1,732.50 | $2,650.00 |
| 67 | PRC flar end sec 18 (54213663) | EACH | 8 | $1,952.50 | $2,950.00 |
| 68 | PRC flar end sec 24 (54213669) | EACH | 3 | $2,365.00 | $3,525.00 |
| 69 | PRC FL end S EQ RS 18 (54214503) | EACH | 2 | $2,255.00 | $3,550.00 |
| 70 | Metal FL end sec 12" (54262712) | EACH | 2 | $440.00 | $880.00 |
| 71 | Storm sew CL A 1 12 (550A0050) | LF | 139 | $106.70 | $127.00 |
| 72 | Storm sew CL A 1 18 (550A0090) | LF | 168 | $125.40 | $145.00 |
| 73 | Storm sew CL A 2 24 (550A0410) | LF | 112 | $159.50 | $151.00 |
| 74 | Water valves adjust (56109210) | EACH | 2 | $1,501.03 | $2,350.00 |
| 75 | Man TA 6 dia T1F CL (60223800) | EACH | 1 | $9,020.00 | $10,600 |
| 76 | Inlets TA T8G (60236200) | EACH | 1 | $2,365.00 | $3,535.00 |
| 77 | Inlets TB T1F CL (60240215) | EACH | 1 | $2,585.00 | $3,825.00 |
| 78 | Man adjust (60255500) | EACH | 2 | $3,942.08 | $3,230.00 |
| 79 | Inlets adj new T1F CL (60260400) | EACH | 3 | $1,882.29 | $2,950.00 |
| 80 | Concrete gutter TY A (60602500) | LF | 208 | $112.18 | $125.00 |
| 81 | Comb CC&G TY B-6.24 (60605000) | LF | 11 | $235.81 | $125.00 |
| 82 | SPBGR TY A 6FT posts (63000001) | LF | 182 | $45.93 | $80.00 |
| 83 | Guard posts (63400105) | EACH | 15 | $182.88 | $350.00 |
| 84 | Mobilization (67100100) | LS | 1 | $151,314 | $80,000 |
| 85 | Sign panel T1 (72000100) | SF | 143 | $40.70 | $70.00 |
| 86 | Remov sin pan assy TA (72400100) | EACH | 31 | $227.83 | $175.00 |
| 87 | Metal post TY A (72900100) | LF | 200 | $16.23 | $36.00 |
| 88 | THPL PVT MK LTR & sym (78000100) | SF | 55 | $20.09 | $20.00 |
| 89 | THPL PVT MK line 4 (78000200) | LF | 7,499 | $3.34 | $3.50 |
| 90 | THPL PVT MK line 12 (78000600) | LF | 29 | $10.07 | $10.00 |
| 91 | Undrgrd C PVC 1 1/2 (81028340) | LF | 89 | $42.05 | $45.00 |
| 92 | Undrgrd C CNC 1 1/2 (81028740) | LF | 40 | $42.05 | $45.00 |
| 93 | Con at ST 1 1/2 galvs (81100500) | LF | 1,025 | $45.08 | $35.50 |
| 94 | Jun BX SS as 8X6X4 (81300310) | EACH | 41 | $714.97 | $835.00 |
| 95 | Handhole C conc (81400730) | EACH | 5 | $2,694.27 | $2,220.00 |
| 96 | EC C XLP use 1C 6 (81702130) | LF | 555 | $2.90 | $4.30 |
| 97 | LT P WD 30 CL5 2MA (83057152) | EACH | 33 | $2,142.27 | $2,900.00 |
| 98 | LT P WD 30 CL5 2-2MA (83057153) | EACH | 8 | $2,142.27 | $3,400.00 |
| 99 | Rem LT U no salv (84200600) | EACH | 39 | $782.00 | $1,360.00 |
| 100 | Rem pole FDN (84200804) | EACH | 2 | $1,708.57 | $1,360.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.