Kinney Contractors, Inc. submitted 261 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 89 of them (34%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $86,132,906
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 48 | 14 | 29% |
| 2022 | 45 | 24 | 53% |
| 2023 | 43 | 8 | 19% |
| 2024 | 50 | 21 | 42% |
| 2025 | 43 | 13 | 30% |
| 2026 | 32 | 9 | 28% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 06 | 69 | 36 | 52% |
| District 08 | 54 | 15 | 28% |
| District 07 | 50 | 18 | 36% |
| District 05 | 26 | 13 | 50% |
| District 03 | 24 | 0 | 0% |
| District 09 | 21 | 4 | 19% |
| District 02 | 9 | 0 | 0% |
| District 04 | 8 | 3 | 38% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Saw cuts | 44213200 | LF | 114 | 74 (65%) | $4.75 | $5.00 |
| Patch reinforcement | 44213000 | SY | 89 | 45 (51%) | $66.00 | $70.00 |
| Tie bars 3/4 | 44213204 | EACH | 132 | 40 (30%) | $17.50 | $17.00 |
| Trainees TPG | Z0076604 | HR | 39 | 39 (100%) | $15.00 | $15.00 |
| TR cont surveillance | 70103815 | CAL DAY | 37 | 32 (86%) | $100.00 | $102.00 |
| Dowel bars 1 1/2 | 44201299 | EACH | 84 | 28 (33%) | $25.00 | $25.00 |
| Changeable message SN | 70107025 | CAL DAY | 143 | 26 (18%) | $130.00 | $55.00 |
| Traf cont-prot 701411 | 70100420 | EACH | 59 | 25 (42%) | $1,400.00 | $750.00 |
| Welded wire reinf | 44200050 | SY | 84 | 21 (25%) | $18.00 | $16.00 |
| Earth excavation | 20200100 | CY | 36 | 17 (47%) | $36.50 | $48.00 |
| Trainees | Z0076600 | HR | 16 | 16 (100%) | $0.80 | $0.80 |
| Crack routing (pavt) | 45100100 | LF | 20 | 14 (70%) | $0.01 | $0.05 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| G. M. Sipes Construction, Inc. | 153 | 72 of 153 |
| Beniach Construction Co., Inc. | 42 | 33 of 42 |
| Keeley & Sons, Inc. | 40 | 20 of 40 |
| E. T. Simonds Construction Company | 27 | 18 of 27 |
| Complete Asphalt Service Co. | 23 | 19 of 23 |
| Samron Midwest Contracting, Inc. | 21 | 10 of 21 |
| Freehill Asphalt, Inc. | 18 | 15 of 18 |
| Stutz Excavating, Inc. | 13 | 4 of 13 |
| RCS Construction, Inc. | 11 | 6 of 11 |
| Sangamo Construction Company | 11 | 0 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 76V40 | District 08 | Section DIST | 2 of 2 | $3,038,360 | +9.0% |
| 18 SEP 2026 | 97894 | District 08 | Belleville, section 22-00176-06-RS | 3 of 5 | $4,979,845 | +20% |
| 31 JUL 2026 | 66T21 | District 03 | Section (128)PP | 2 of 2 | $702,750 | +2.0% |
| 31 JUL 2026 | 66T22 | District 03 | Section (19) | 2 of 2 | $681,610 | +12% |
| 31 JUL 2026 | 72372 | District 06 | Section D6 | 3 of 3 | $253,775 | +77% |
| 31 JUL 2026 | 72J00 | District 06 | Section D6 | 2 of 3 | $113,798 | +23% |
| 31 JUL 2026 | 76V11 | District 08 | Section DIST | 1 of 3 | $951,953 | Low, 5.0% under the second |
| 31 JUL 2026 | 92621 | District 06 | Section (S,W)R-2,W-2,PB | 2 of 4 | $37,845,077 | +3.0% |
| 12 JUN 2026 | 76V12 | District 08 | Section (Z-1)PP-1 | 1 of 1 | $414,711 | Low |
| 12 JUN 2026 | 95997 | District 07 | Vandalia, section 21-00070-00-SW | 2 of 5 | $1,787,605 | +9.0% |
| 24 APR 2026 | 46948 | District 07 | Section SPITLER/LTH | 2 of 2 | $2,828,625 | +5.0% |
| 24 APR 2026 | 70H82 | District 05 | Section CM | 3 of 4 | $575,766 | +21% |
| 24 APR 2026 | 70H85 | District 05 | Section (57-6,7,20)PP | 1 of 2 | $1,233,555 | Low, 14% under the second |
| 24 APR 2026 | 72N43 | District 06 | Section TIM | 2 of 3 | $15,912,573 | +19% |
| 24 APR 2026 | 74E19 | District 07 | Section D7 | 2 of 3 | $1,111,888 | +16% |
| 24 APR 2026 | 74E20 | District 07 | Section D7 | 3 of 4 | $601,885 | +47% |
| 24 APR 2026 | 76U70 | District 08 | Section (48,49,50,51-1,52-1,53,54,55,62)PP-1 | 3 of 3 | $1,301,685 | +1.0% |
| 24 APR 2026 | 76V05 | District 08 | Section DIST | 2 of 3 | $2,218,233 | +13% |
| 24 APR 2026 | 76V07 | District 08 | Section DIST | 1 of 2 | $1,394,429 | Low, 8.0% under the second |
| 24 APR 2026 | 76V10 | District 08 | Section 61-(1-1,1-2,2,3,3-1,4,5,5-1,6)PP-1 | 3 of 5 | $1,922,788 | +23% |
| 24 APR 2026 | 76V14 | District 08 | Section DIST | 2 of 2 | $2,936,864 | +5.0% |
| 24 APR 2026 | 93850 | District 06 | Litchfield, section 24-00044-00-SW | 2 of 2 | $304,057 | +8.0% |
| 27 FEB 2026 | 76U52 | District 08 | Section DIST | 1 of 2 | $1,982,334 | Low, 1.0% under the second |
| 16 JAN 2026 | 72777 | District 06 | Section D6 | 3 of 4 | $166,216 | +12% |
| 16 JAN 2026 | 72G53 | District 06 | Section D6 | 1 of 2 | $1,797,824 | Low, 8.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.