IDOT contract 95997 bid tabulation
Vandalia, section 21-00070-00-SW. Let by Illinois DOT on June 12, 2026, Fayette, District 07. 5 bids received; low bid $1,645,985 by McCarthy Improvement Company.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 45
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McCarthy Improvement Company | $1,645,985 | Low |
| 2 | Kinney Contractors, Inc. | $1,787,605 | +9.0% |
| 3 | Mayer Landscaping, Inc. | $1,880,274 | +14% |
| 4 | Baxmeyer Construction, Inc. | $1,996,040 | +21% |
| 5 | Samron Midwest Contracting, Inc. | $2,074,876 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McCarthy Improvement Company | 2. Kinney Contractors, Inc. | 3. Mayer Landscaping, Inc. | 4. Baxmeyer Construction, Inc. | 5. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Relocate EX mailbox (X0327301) | EACH | 1 | $400.00 | $750.00 | $441.20 | $636.99 | $350.00 |
| 2 | Seeding CL 1 SPL (X2500900) | ACRE | 2 | $7,725.00 | $7,000.00 | $28,580 | $32,490 | $15,000 |
| 3 | Rem & rel SN P&P assy (X2600012) | EACH | 7 | $400.00 | $700.00 | $440.65 | $591.67 | $300.00 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $74,300 | $30,750 | $130,267 | $26,193 | $25,000 |
| 5 | Accessible ped signal (X8760200) | EACH | 2 | $4,290.00 | $4,650.00 | $4,905.90 | $2,410.90 | $5,000.00 |
| 6 | Tree remov over 15 (20100210) | UNIT | 94 | $150.00 | $127.50 | $61.45 | $157.66 | $150.00 |
| 7 | Earth excavation (20200100) | CY | 1,326 | $78.00 | $49.00 | $163.50 | $185.49 | $50.00 |
| 8 | Furnished excavation (20400800) | CY | 999 | $73.00 | $48.00 | $59.50 | $249.91 | $100.00 |
| 9 | Trench backfill (20800150) | CY | 5 | $106.00 | $175.00 | $142.60 | $91.91 | $100.00 |
| 10 | PCC base cse W 8 (35400300) | SY | 104 | $131.00 | $172.00 | $251.60 | $261.73 | $150.00 |
| 11 | PCC driveway pavt 6 (42300200) | SY | 925 | $108.00 | $155.50 | $167.05 | $184.08 | $120.00 |
| 12 | PC conc sidewalk 4 (42400100) | SF | 74,971 | $10.75 | $12.75 | $9.10 | $9.32 | $15.00 |
| 13 | PC conc sidewalk 6 (42400300) | SF | 7,055 | $11.00 | $13.75 | $16.95 | $9.54 | $15.00 |
| 14 | PC conc sidewalk 8 (42400410) | SF | 345 | $13.75 | $17.00 | $24.90 | $12.37 | $15.00 |
| 15 | Detectable warnings (42400800) | SF | 596 | $42.00 | $45.00 | $83.05 | $47.05 | $35.00 |
| 16 | Pavement rem (44000100) | SY | 80 | $20.50 | $60.00 | $74.60 | $206.56 | $45.00 |
| 17 | Drive pavement rem (44000200) | SY | 1,167 | $19.25 | $26.00 | $17.40 | $57.30 | $20.00 |
| 18 | Comb curb gutter rem (44000500) | LF | 613 | $11.00 | $22.00 | $16.75 | $39.19 | $25.00 |
| 19 | Sidewalk rem (44000600) | SF | 9,054 | $1.75 | $2.50 | $1.00 | $3.48 | $4.00 |
| 20 | Pipe handrail (50901760) | LF | 180 | $200.00 | $150.00 | $148.65 | $137.60 | $150.00 |
| 21 | P cul CL C 1 12 (542C0217) | LF | 40 | $60.00 | $280.00 | $170.35 | $68.95 | $150.00 |
| 22 | P cul CL C 1 24 (542C0229) | LF | 16 | $101.00 | $300.00 | $405.15 | $66.31 | $175.00 |
| 23 | SS RG CL A 1 12 (550A2320) | LF | 30 | $59.00 | $202.00 | $212.20 | $75.78 | $150.00 |
| 24 | Dom met VLTS adj (56500300) | EACH | 6 | $1,150.00 | $500.00 | $469.80 | $643.26 | $500.00 |
| 25 | Inlets TA T8G (60236200) | EACH | 1 | $6,375.00 | $3,200.00 | $6,522.45 | $2,055.01 | $5,000.00 |
| 26 | Inlets adjust (60260100) | EACH | 3 | $2,200.00 | $1,250.00 | $2,199.90 | $891.37 | $500.00 |
| 27 | VV adjust (60265700) | EACH | 2 | $735.00 | $600.00 | $957.00 | $643.26 | $100.00 |
| 28 | Comb CC&G TB6.24 aep (60605100) | LF | 547 | $83.00 | $105.00 | $112.35 | $176.61 | $100.00 |
| 29 | Guardrail remov (63200310) | LF | 91 | $15.00 | $12.00 | $26.65 | $26.55 | $15.00 |
| 30 | Rem RE-E SPBGR TY A (63301210) | LF | 8 | $400.00 | $400.00 | $731.45 | $296.38 | $325.00 |
| 31 | Non SPL waste disposl (66900200) | CY | 85 | $166.00 | $49.00 | $187.00 | $0.01 | $175.00 |
| 32 | Soil disposal analy (66900530) | EACH | 1 | $1,400.00 | $1,700.00 | $1,601.00 | $1,905.29 | $2,500.00 |
| 33 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 | $2,700.00 | $2,515.85 | $3,175.49 | $3,500.00 |
| 34 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 | $2,700.00 | $2,515.85 | $1,058.50 | $1,500.00 |
| 35 | Reg sub mon (66901006) | CAL DAY | 4 | $1,175.00 | $1,450.00 | $1,343.70 | $1,164.35 | $1,500.00 |
| 36 | Mobilization (67100100) | LS | 1 | $99,100 | $95,500 | $99,363 | $57,031 | $185,000 |
| 37 | Undrgrd C PVC 2 (81028350) | LF | 67 | $84.50 | $100.00 | $96.65 | $73.81 | $90.00 |
| 38 | Elcbl C signal 14 2C (87301215) | LF | 228 | $7.25 | $8.50 | $8.30 | $2.63 | $5.00 |
| 39 | Elcbl C signal 14 4C (87301235) | LF | 241 | $8.50 | $9.00 | $9.70 | $2.95 | $10.00 |
| 40 | TS post galvs 12 (87502460) | EACH | 2 | $3,950.00 | $4,250.00 | $4,517.10 | $4,228.73 | $4,500.00 |
| 41 | Ped push-but post T1 (87600100) | EACH | 2 | $4,600.00 | $5,250.00 | $5,260.40 | $3,661.47 | $4,500.00 |
| 42 | Conc FDN TY A (87800100) | LF | 6 | $1,150.00 | $1,400.00 | $1,315.10 | $792.89 | $1,000.00 |
| 43 | Drill EX handhole (87900200) | EACH | 2 | $1,675.00 | $1,900.00 | $1,915.45 | $1,501.98 | $1,000.00 |
| 44 | Ped SH P LED 1F BM CT (88102825) | EACH | 2 | $1,695.00 | $1,850.00 | $1,938.35 | $2,191.72 | $2,500.00 |
| 45 | Mod EX contr (89502200) | EACH | 1 | $3,025.00 | $3,350.00 | $3,459.30 | $5,466.42 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.